P.Fassnacht on behalf of ATLAS/ALFA

Slides:



Advertisements
Similar presentations
LHC/HERA workshop, WG 4 (17. Jan. 2005)
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
The First 1 ½ Years of TOTEM Roman Pot Operation at the LHC M. Deile, G. Antchev, I. Atanassov, V. Avati, J. Baechler, K. Eggert, J. Kašpar, F. Lucas Rodriguez,
Running at Low  * and High Lumi Test insertion on 13 October 2011:
ATLAS Forward Detector Trigger ATLAS is presently planning to install forward detectors (Roman Pot system) in the LHC tunnel with prime goal to measure.
Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their.
LS2 Other LHC Experiments Mike Lamont Thanks to: Michael Rijssenbeek (AFP) Joachim Baechler (TOTEM) Karl-Heinz Hiller (ALFA)
Lishep06 Gilvan Alves1 Overview of Diffraction from DØ Gilvan Alves Lafex/Brazil  Introduction  DØ RunI x RunII  Special Runs  Outlook.
P. 1Mario Deile – Meeting on Experiment Protection from Beam Failures Protecting TOTEM Mario Deile PH-TOT
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
ATLAS-ALFA as a beam instrument Sune Jakobsen (BE-BI-PM and PH-ADO) on behave of the ATLAS-ALFA community LS1 LBOC meeting
Backgrounds at FP420 Henri Kowalski DESY 18 th of May 2006.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Status of the Experiment RRB - TOTEM 16 April 2013 S.Giani - CERN on behalf of the TOTEM Collaboration CERN-RRB
LHC Collimation Working Group Monday, 21 March 2016 Analysis of collimator BPMs in the 2015 run A.Valloni, G. Valentino with input from R. Bruce, A. Mereghetti,
:30 meetingEBH 1  No beam during the morning:  4:15 – 9: V distributor: Recovery after electrical interruption  access for TI services.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Fabio Follin Delphine Jacquet For the LHC operation team
y x Vincenzo Monaco, University of Torino HERA-LHC workshop 18/1/2005
Operating IP8 at high luminosity in the HL-LHC era
Detector status and commissioning: LUCID
Status of the ATLAS Forward Proton Detectors Michael Rijssenbeek for the ATLAS AFP group 25FEB2016.
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
LHC during week 45 LHC delivered ~0.837 fb-1 in week 45
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
First data from TOTEM experiment at LHC
Emmanuel Tsesmelis TS/LEA 26 January 2007
Friday 15th June 01:11 Injection.
MD2036: UFO dynamics studies and UFO fast detection
Recent Results from TOTEM
Saturday 21st April 00:33 Interlock during ramp on BLM HV
LS2 LHC forward experiments
Monday 11/07: Recovery Plenty of accesses.
MD25 ns - 14/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Tuesday TOTEM and transverse loss map (1) OK
Monday – recovery from MKI flashover
Summary of Week 16 G. Arduini, J. Wenninger
TOTEM experiment at the LHC
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Scrubbing progress - 10/12/2012
Monday February 28th 8h00: Injection
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Planning at 5 o’clock meeting Friday
Wire almost entirely through beam before BLM triggers dump
LHC progress report Week
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
LHC Beam Operations Past, Present and Future
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Saturday 7th May Sat – Sun night
(on behalf of the LHC team)
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
90m "proper" VdM scans in the 90m/10m optics
Status of CMS-PPS timing detectors
Scrubbing progress - 08/12/2012
Programme for Friday 9 July
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Monday :15 fill 3523 dumped by BPMs IP6
Tuesday – Morning and Evening
JLEIC Reaching 140 GeV CM Energy: Concept and Luminosity Estimate
Another Immortal Fill….
Tuesday
Monday 152 bunch operation summary
Presentation transcript:

P.Fassnacht on behalf of ATLAS/ALFA From LS1 to 2016 P.Fassnacht on behalf of ATLAS/ALFA Detector readiness Status of physics analyses (short) Plans for 2016 15/3/2016 Forward Physics Workshop – March 2016 – CERN

Forward Physics Workshop The ALFA detector ATLAS 2 x 2 stations ~ 240 m from ATLAS IP 8 fiber detectors with 2 x 10 layers of 0.5 mm quadratic fibers Movable in vertical direction Resolution ~ 35 μm 15/3/2016 Forward Physics Workshop

Forward Physics Workshop Long list of LS1 upgrades … All 4 station moved from tunnel to surface, complete disassembling Replacement of detector ALFA2  ALFA10 Alternate pre-vacuum pumping with remote controlled spare pump Reduced dead time of trigger electronics to handle up to ~ 700 bunches Upgrade of movement system: PXI, FESA etc. Upgrade of DCS and TDAQ along with ATLAS stream Vital: heat protection to avoid damage of detectors New laser survey in tunnel Special trigger board to stay within ATLAS latency budget Move both far stations to new positions to enlarge distance 4m  8m,  improve t-resolution by factor 2 New code for reconstruction software 15/3/2016 Forward Physics Workshop

Forward Physics Workshop From tunnel to surface and back 15/3/2016 Forward Physics Workshop

Forward Physics Workshop Heating in Run1 Max increase ~ 20 degrees observed Danger: destroy structure of fiber detector 15/3/2016 Forward Physics Workshop

RP Filler, ferrites, air cooling, heat distribution 4 Measures against heating RP Filler, ferrites, air cooling, heat distribution 15/3/2016 Forward Physics Workshop

Forward Physics Workshop Heating in Run2  Small increase by ~ 3 degrees, save for Run2 15/3/2016 Forward Physics Workshop

Forward Physics Workshop Data taking in Run2: beta* 90m Optics Fill#2 Scraping & Elastics#1 Elastics#2 Xing = 0 Diffractive Fill 54b Diffractive Fill 252b 5 diffractive runs with Fills 685b Loss maps 10 sigma Magnet access & recovery RF trips Cryo fault Monday 8:00 Sunday 12:00 15/3/2016 Forward Physics Workshop

Forward Physics Workshop Elastic scattering Refill LHC with 3 bunches ~ 8E10 plus up to 10 pilot bunches ~ 1E10 Move the Roman Pots again to 5.5 σnominal Follow data recording by farm processing for various groups of trigger items Now w/o IBL in readout to allow higher trigger and storage rates After about 4.5 hours beam was dumped by operator !!! Collected: 40 million physics, 11 million elastic, 450 million calibration triggers Data w/o crossing angle for standard elastics analysis Qualification by loss map tests for Roman Pots at 10 σ successful, originally 12 σ K.Korcyl 15/3/2016 Forward Physics Workshop

Forward Physics Workshop Diffractive scattering Due to ALFA dead time min bunch spacing 100 nsec, allows max 700 bunches Unusual filling scheme, never before tested … Strategy for intensity ramp: 50  250  700 bunches Move all Roman Pots to 10 σnominal (5-7 mm) Example: Online plots for single diffractive events combining ALFA & MBTS Integrating over all 7 fills: LHC delivered: 735 nb-1 ATLAS+ALFA in position recorded: 652 nb-1 ATLAS+ALFA optimal: ~600 nb-1 (~82 % efficiency) K.Korcyl 15/3/2016 Forward Physics Workshop

Forward Physics Workshop List of YETS 2015 upgrades … Vacuum pumps & fans Replacement of noisy LVDT Modification of Radmons for higher doses Upgrade of movement system. Interlock validation started Changes in DCS and TDAQ along with ATLAS Measures against the UFO issue Long-pending installation of new magnet cables 15/3/2016 Forward Physics Workshop

Forward Physics Workshop UFO issue and measures (1) Beam dump in an ALICE/LHCb vdM run by a BLM signal close to station A7L1 Measure#1: multiple movement repetitions in TS2 TS2 No clear effect UFO rate scales with beam intensity All signals below dump threshold 15/3/2016 Forward Physics Workshop

Forward Physics Workshop UFO issue and measures (2) Measure#2: increase dump threshold from machine side, more coherent with TOTEM Increase by factor ~25 should rule out UFO amplitudes above the threshold over Run2 Beta* 90m, Oct 10-19, 2015 BLM signals versus RP mvt No indication of correlation seen. 15/3/2016 Forward Physics Workshop

Cables: 24h Short Circuit Test Magnet cables for Q4 Cables installed - to satisfy optics requirements very asymmetric powering of Q4 needed for the 2 beams. Not possible with the past powering schema – Like for TOTEM new cables installed during YETS Optics: Starting point : 1000 m optics of 2012. No more Beam1 / Beam2 ratio constraint on Q4. Phase advances: 90deg in vertical (ok) and away 180deg in horizontal (not yet fully there…). Preliminary file available. New cable needed Cables: 24h Short Circuit Test 15/3/2016 Forward Physics Workshop

Forward Physics Workshop Steps to highest beta* Powering tests of Q4.R5 on the 2015.02.14 results (TOTEM) De-coupling of beam1 and beam2 allows to design optics with less constraints 15/3/2016 Forward Physics Workshop

Forward Physics Workshop Status of physics analyses Elastic scattering: Total/elastic cross section at 7TeV (beta* 90m) published Analysis 8TeV / 90m in final stage. Internal reviewing started. Analysis 8TeV / 1km first iteration done, checking consistency with 90m results Data 13 TeV/ 90m first inspection done, on hold until 8 TeV results published Diffractive processes: 7 + 8 TeV – exclusive pions: close to being finalized 13 TeV – inclusive and exclusive analysis started ALFA+LHCf – combined data, mostly pp + 0 15/3/2016 Forward Physics Workshop

Forward Physics Workshop Standard elastics program Measurement of luminosity and total cross section by elastic scattering at very low t In dependence on t-range two options: 1. Only nuclear scattering and luminosity from ATLAS  σtot 2. Coulomb + nuclear scattering:  Luminosity and σtot Key parameter: small tmin requires small emittance εN , close distance Nσ and large β* To access this region: β* > 2km, ε < 2 μrad, Nσ < 5 Steep Coulomb part 15/3/2016 Forward Physics Workshop

Forward Physics Workshop On the way to highest beta* H.Burkhardt: first attempt for beta* 2-3 km 180 deg!! 237m 245m Problematic phase advance in horizontal plane  M12x ~ sin mx ~ 0 Match at 230m B1 βx ϕx M12x βy ϕy M12y 237m 357m 180.035 -0.58m 43.95m 98.53 328 245m 285m 181.52 -22.4m 45.41 109.2 318 15/3/2016 Forward Physics Workshop

Forward Physics Workshop Hit maps & resolution from fast simulation At small t, t-resolution mainly limited by poor lever arm, in particular in x (M12x) H.Stenzel 15/3/2016 Forward Physics Workshop

t_min, how much into CNI? Reminder Mechanical limitation to RP positions: AC switch Approx. 800-900 mm per gap. t_min= p2*yd2/(by*b*) yd=800 mm (half gap + wall + dd_w) by(240m) = 45m, b*=2500m p=6.5TeV/c ==> t_min = 2.4 * 10-4 GeV2 “Only” freedom: maximise by*b* ! CNI 15/3/2016 Forward Physics Workshop

Forward Physics Workshop Acceptance versus detector positions For data in CNI region with acceptance > 10% detectors at 1mm to beam Taking into account ~ 0.4mm dead space due to window+gap RPs at 0.6mm H.Stenzel Acceptance (10%) and t-resolution limits range for physics analysis to at best t > 2.10-4 GeV2 15/3/2016 Forward Physics Workshop

Forward Physics Workshop Schedule for 2016 Two slots to implement and measure optics: end of May, July A period of 3-4 days for data taking late September , together with TOTEM. Needs final confirmation 15/3/2016 Forward Physics Workshop

Thank you for your attention Ready for b*=2.5km Thank you for your attention Sune Jakobsen