Preparation of the activities for the LHC Long Shutdown 2

Slides:



Advertisements
Similar presentations
Status of Cryogenics at point 4 following the power cut L. Tavian 20 August 2011.
Advertisements

Cryogenic system in P4: Possible options S. Claudet & U. Wagner LHC Workshop, “Chamonix XlV” January 2005 (Mostly for RF & beam scrubbing)
LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013.
Going towards LHC Run2 CRYOGENICS 5 th Evian Workshop 2-4 June 2014 SESSION 4 - Systems 2 - Status and commissioning plans (HW perspective) Krzysztof Brodzinski.
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
CRYOGENICS AND POWERING
H. Herzog, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN LARGE SCALE CRYOGENIC.
MTA Cryogenics: Where We Are The Work of Fermilab AD/Cryo Barry Norris, Christine Darve and a host of wonderfully talented Cryogenic Personnel John Thompson,
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
Introduction to LHC cryogenic system (layout, architecture) Preparation before cool-down (Purge, flushing) Transient operations to reach nominal operating.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire SSD/SDD Proposal Upgrade 30/08/2012
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Cryogenics for crab cavities – SPS/LHC 2 nd HiLumi LHC meeting – Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
LS1 SSD PLANS 1.Cooling always on 2.SDD/SSD Cooling plant under UPS 3.Counter flow cleaning 4.Removing Teflon 5.Check safety valves 4 Sept 2012ITS Cooling.
D. Delikaris, TE-CRG, LSC 25th Meeting Page 2 October 18 th, 2013 LS1 Committee (LSC)- 25 th Meeting D. Delikaris, TE-CRG Cryogenics activities.
TE-CRG Activities D. Delikaris, TE-CRG.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
LHC CRYOGENICS – new experience of run with increased beam energy and intensity Krzysztof Brodzinski CERN, Geneva, Switzerland With contribution from:
TAC2 Alpi consolidation in Cryogenics and Cryomodules.
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system G. Ferlin, CERN Technology department Presented at CEC 2015.
LHC Cryogenics, equipment & interventions around P3/P7 S. Claudet, “volunteer” for TE_CRG 16 Oct’14.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Overall planning, consolidation, stops, time line K. Foraz MAC – April 27th 2010 April 27th 20101K. Foraz - Machine Advisory Committee.
L. Tavian, TE/CRG, LSC Page 2 February 21 th, 2014 LS1 Committee (LSC) L. Tavian TE-CRG.
Crab Cavities SPS cryogenics – progress and requirements Fermilab visit at CERN 02 August 2013 Krzysztof Brodzinski (on behalf of CERN cryogenic team)
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
TE-CRG Activities A. Perin, on behalf on the Cryogenics Group.
LHC Performance Workshop LS1 Session Cryogenic system: strategy to achieve nominal performance and reliable operation J. Bremer, K. Brodzinski, J. Casas,
EN-CV activities for LHC during LS2
Teleconf ACS – FREIA 28th March 2017
CONSOLIDATION day in view of HL-LHC Cryogenic aspects
LHC-RF activities in LHC PT 4 TS2 YETS LS2
Cryoplant Installation Scope
Update of cryogenic activities
SPS cryogenic proximity equipment and SM18 validation
The LHC - Status Is COLD Is almost fully commissioned
CRYOGENICS – strategy, unavailability root causes and limitations
Long Shutdown for the LHC: Vacuum Beam Pipes
Nikolaos TRIKOUPIS on behalf of TE-CRG-CI CRG-TM for LS2 preparation Preliminary activities of the CI section 25/09/2017
Keeping LHC cold during LS periods Preliminary proposal
Hollow e- lens, Cryogenic aspects
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
CV maintenance works during YETS
Activities of the ME section during LS2 ( )
CRG-ME YETS 2017/2018 activities
Overview & baseline of LS2 and roadmap for CRG
YETS 2017 TE-CRG-OP overview of tasks to perform during the first month _GF YETS2017_CRG-OP.
Status of the cryogenic system for B180
The HIE—ISOLDE Cryogenic System, its Infrastructure and Considerations for Phase 3 O. Pirotte (TE/CRG)
Cryogenic cavern in Asian site
ILC Experimental Hall Cryogenics An Overview
Overarching Commissioning Plan
SNS Cryoplant Commissioning Past Experiences
Experimental Areas – LS2 planning
ESS Spoke cryomodule testing: cryogenic experience
SC1R Cold Box PDR Assembly Sequence
Cryogenic upgrade of B165 CRG Status Meeting 16th may 2019
Presentation transcript:

Preparation of the activities for the LHC Long Shutdown 2 Section Operation

LS2 Maintenance Maintenance plan must be done (3.3kV motors, Compressors, instrumentation, Charcoal, ORS, electrical cabinets, Vacuum…); All plants LHC/Atlas/Cms quid of Dryers cleaning of ORS and HP pipes (LHCA_Linde) Dedicated Maintenance for Cold Compressor cartridges, Mapag and associated instrumentation. QRL X-ray after warming up and repair if necessary Leak check of all QRL valves Line C to B/D and repair if necessary QUI/RM valve leak check and repair if necessary P4 helium guard leak & P18 VLP to be solved Helium guard: Leak test of the circuits and individual leak research on all the components (O-ring for valve shaft, O-ring for valve or instrument flanges) 2017-09-25 TE-CRG-OP_GF

LS2 Consolidation/improvement Mechanical hardware 16 Valves plugs to be exchanged on QRL_CV920 QUI U tube valves to be motorized RM R1, QUI-P2… must be made operational Switchable cooling water filter for cold boxes Electrical/instrumentation hardware Cold compressors Electrical cabinet upgrade to avoid P2 communication problems Upgrade of AMB/VFD to end cold compressors refurbishing Instrumentation to upgrade (TT cold comp, LHE level sensors TT turbines…) Controls Atlas: Migration to CPC6 Improvement of control system to increase availability (Majority voting, Alternative sensor, Safety chain upgrade…) PVSS upgrade PLC update to M580 to be ended 2017-09-25 TE-CRG-OP_GF

LS2 Consolidation not yet approved Outlet turbines TU2 & TU4 on Linde LHCA cold boxes: add sectorization valve QUI: sectorizations valves P2 and/or P8, LHCA AL: major compressor station upgrade LHCA (AL/Linde): electrical cabinet refurbishing Possible co-activities and associated issues P4 Upgrade of LHCa/b to fit with new RF cavities scheme P6 Commissioning of the re-liquefier Atlas/CMS Civil engineering to prepare HL-LHC LHC Pressure tests 2017-09-25 TE-CRG-OP_GF