TG Chair: Mark Brinsden Shell

Slides:



Advertisements
Similar presentations
1 IEEE Power Engineering Society IEEE Standard 762: Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity.
Advertisements

Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
SC19 report to SC18 January 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Stephen R Whitesell SC-5 Chair 11/13/2014.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
2012 EWAPS Amsterdam API RP19B Update Presented by Mark S Brinsden Shell Chair API RP 19B Committee Mark Brinsden API RP 19B 2012 EWAPS - Amsterdam.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
ACM/SIG Services Orientation August 20 th, 2015 Irene Frawley, Ann Lane and Fran Spinola Listserv Bylaws CorporateSponsorship Awards StudentTravelGrants.
Report on Conformity to Type (CTT): CIML Item 10.4 Presented to: 46 th CIML Meeting Prague 13 Oct 2011 Presented by: Stephen O’Brien – CIML Member Manager,
FAO/WHO Codex Training Package Module 3.2 FAO/WHO CODEX TRAINING PACKAGE SECTION THREE – BASICS OF NATIONAL CODEX ACTIVITIES 3.2 How to develop national.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Kent Grebing, API SC 16 Chair
SC 16 DRILLING WELL CONTROL SYSTEMS API SC18 Report out Session API 2015 Winter Standards Meeting Kent Grebing, API SC 16 Chair.
Lab-Wide Earned Value Management System Project Core Team Meeting October 01, 2008 Dean A. Hoffer/Elaine McCluskey.
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
FAO/WHO CODEX TRAINING PACKAGE SECTION TWO UNDERSTANDING THE ORGANIZATION OF CODEX Module 2.5 How do Codex Committees function?
1 Accredited Standards Committee C63 ® - EMC Subcommittee 8 Bob DeLisi Chair
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
DEX Publication Project OASIS PLCS TC Face-to-face meeting 1 October 2007 Trine Hansen.
DEX Publication Project OASIS PLCS Telecon 27 November 2007 Trine Hansen.
DICOM to ISO-DICOM Report to joint ISO TC215/WG2 – DICOM WG10 meeting January 24, 2004, San Diego.
SC8 Liaison Report 2014 Exploration & Production Standards Conference API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC-18 Liaison Report TG-3: Definition of.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas-Lift, Barrier Valves, Completion.
2015 International Perforating Symposium – Europe IPS also SPE MS Thermal Decomposition Effects on Perforating Performance and Safety A.E.
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
San Francisco, CA. SC8 Liaison Report
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
API 19 CI Chemical Injection Devices for Downhole Applications
API 19 CI Chemical Injection Devices for Downhole Applications
TG Chair: Darren Bane (BHI)
Region 15 Regional Healthcare Partnership 15th Public Meeting
ATF FACULTY MEMBER TRAINING ACADEMIC YEAR
Task Group API 19SS Sand Screens
API SC19 HPHT Template (Proposed as SC19TR1)
ISO/TC 204 WG 3-Database Technologies
Status DEX Publication Project
A Bill Becomes A Law House of Representatives Senate.
Commercial Operations Sub-Committee Update to TAC
Task Group 19LH Liner Hanger Equipment
Updates from SC18 Summer Meeting
API SC 10 Task Group on Stage Cementing Collars TG Charge Proposal
API 14L Specification for Lock Mandrels and Landing Nipples
Task Group API 19SS Sand Screens
TG Chair: Darrin Willauer Baker Hughes
SC 6 Task Group 1 Pipeline and Valve Standards Status Report
22 March Agenda Opening comments and attendance
ATF FACULTY MEMBER TRAINING ACADEMIC YEAR
A Bill Becomes A Law House of Representatives Senate.
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
WG Chair: Charles Ehrlich, NIST, U.S.A. CIML Member
API Summer Standardization Conference
Action Item Start of IEEE 802 Mar 2017 Plenary
EMERGENCY PLANNING GUIDANCE FOR RAIL MARSHALLING YARDS
Specification on float equipment
A Bill Becomes A Law House of Representatives Senate.
EC Update on LMSC Policy and Procedures
IRCC-7 Agenda item 10 Input from HSSC-6 IHB
API SC 10 WG15 Stage Cementing Collars
November 2018 Opening Report
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
Report of the Technical Subcommittee
Sheung Li Task Group J Chairperson March 19, 2004
Accredited Standards Committee C63® - EMC
CSOEM Materials Advisory Resource Group
ARC-agenda-report-minutes-july-2011
API 16RCD January 2019 Specification for Rotating Control Devices
Presentation transcript:

TG Chair: Mark Brinsden Shell API RP 19B TG Chair: Mark Brinsden Shell Jan 17th 2017 Subcommittee 19

Task Group Group: 19B & RP67 Chair: Mark Brinsden Number of Standards and RPs: 2 Meetings in last 12 months: 2 Main meetings and approximately 18 meetings covering 19B and 67 sections each with about 5 participants for 1-2 hours. We would estimate about 200 hours for main meetings, 125 hours for Section meetings and about 250 hours for correspondence and work on writing sections. * Held on Video conference between Houston and Buenos Aires & Conf. Call Date Manufacturers Consultants Operator/User API Staff Total Number 5/04/16 22 2 3 1 28 *10/18/16 23 8 33 Subcommittee 19

Document Designation API RP 19B – about 95% complete • Section 1 is approved and complete. • Section 2 has been completed, ballot closing Jan 27th 2017. • Section 3 is approved and complete. • Section 4 is approved and complete. • Section 5 has been completed, ballot closing Jan 27th 2017. • Section 6 has been completed, ballot closing Jan 27th 2017. • Section 7 - a new section 7 is proposed for hole size – under consideration as a future addendum. Focus of change: Chair: Considerable effort in witness qualification and evaluation for consistency is underway, for Sect 1 and also Sect. 2 and Sect. 6. Thermal Decomposition study still awaiting API funding – ongoing for 2 years. A new review of Perforation Physics and modelling has been set up to look at how Section 2 charge penetration data can be used for consistent modelling. SC Liaison: Comments Subcommittee 19

Document Designation API RP 67 –100% complete • All sections have been reviewed and document is out for ballot closing Feb 20th 2017. API RP 67 – Ongoing request for funding • Oilfield Explosives Safety – gun system drop testing for HMX sensitivity after exposure to elevated temperature. • $175k (or $100k if prior funds of $72,850 are still available) – requested for 2017 Conclusion – API RP19B and RP67 Committees will remain very active following the current completion of these revisions. Extensive further updates and new work is expected to continue. Notes of appreciation to be sent out to the active participants. Subcommittee 19

Action Items from Last Meeting 1. API is to complete the balloting process for Section 2. 2. API is to initiate balloting on the final drafts of RP-19B Sections 5 and 6, and the full RP-67 document. 3. Those interested in participating in the enhancement of the Registration and Witness Program are to contact Oliver Han (oliver.han@hunting-intl.com). 4. Will Freeman is to provide the Task Group a list of current witnesses, their locations and cost. 5. Will Freeman and the Witness Work Group will develop a witness training program. 6. Will Freeman is to determine the status of funding for proposed projects, and update the Task Group. 7. Will Freeman is to confirm that the method of payment for Thermal Decomposition testing at LLNL (payment from API to LLNL) has been resolved. 8. Those interested in participating in the development of a Section 2 downhole penetration model are to contact Mark Brinsden (mark.brinsden@shell.com). 9. Will Freeman is to develop a process for a depository for digitized data sheets. 10. Will Freeman of API will host the May 2017 Task Group meeting in Houston. 11. Schlumberger and Hunting Titan will organize a Perforating Safety Forum in May 2017. Subcommittee 19