METHOD STUDY.

Slides:



Advertisements
Similar presentations
Slack, Chambers and Johnston, Operations Management 5 th Edition © Nigel Slack, Stuart Chambers, and Robert Johnston 2007 Chapter 9 Job design and work.
Advertisements

McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Design of Work Systems.
INTRODUCTION TO BUSINESS
Maintenance Work Measurement
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Design of Work Systems.
Improving Productivity & Quality
Motion Study Vanni Legaspi IR212.
Industrial Facilities Design
Productivity One of the most important responsibilities of an operations manager is to achieve productive use of organization’s resources. Productivity.
How to Effectively Implement Set-up Reduction in Any Organization.
Human Resources in Operations
Work Design and Measurement Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent.
7 Design of Work Systems.
Industrial Engineering I
7-1Design of Work Systems William J. Stevenson Operations Management 8 th edition.
Work Study Process Analysis Operation Analysis (Micro) Motion Study
Principles of Operations Management
7-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
PRESENTATION ON Time and Motion Study BY:- KANIKA SOOD 108K18 AASHI AGARWAL 108K22.
WORK STUDY WORK STUDY IS A GENERIC TERM FOR THOSE TECHNIQUES, PARTICULARLY METHOD STUDY AND WORK MEASUREMENT,WHICH ARE USED IN THE EXAMINATION OF HUMAN.
UNIT 2 WORK STUDY, INCENTIVES AND SAFETY. Work study It is the systematic examination of the methods of carrying on activities so as to improve the effective.
Company LOGO Work Measurements Lab # 5. Outline 1. Work Study 2. Method Study 3. Work Measurement 4. Time Study 3. Standard Time June 4, 20162Lab # 5:
Job Design Job design involves specifying the content and methods of job What will be done Who will do the job How the job will be done Where the job.
Work Study Prof. Dr. Orhan TORKUL Arş. Gör. M. Raşit CESUR Arş. Gör. Furkan YENER.
Principles of Management and Total Quality Management
IENG 301 FUNDAMENTALS OF WORK STUDY AND ERGONOMICS
TONEY L FERGUSON SR. M.B.A., M.P.M Unit 4. Agenda Scientific Management Trends in Human Resources Management Importance of Project Management Q and A.
WORK-STUDY Work-study is a generic term for those techniques, method study and work measurement which are used in the examination of human work in all.
Work Study is the systematic examination of the methods of carrying out activities such as to improve the effective use of resources and to set.
Company LOGO Work Measurements Lab # 5. Outline 1. Work Study 2. Method Study 3. Work Measurement 4. Time Study 3. Standard Time February 17, 20162Lab.
Job Analysis and Evaluation. Definition Job - Consists of a group of tasks that must be performed for an organization to achieve its goals Position -
Motion Study and Work Design
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
Work study. Work study literally implies study of human work. it concerns itself with better ways of doing things n control over the output of those things.
FACILITY LAYOUT & LOCATION PROF. DR. ORHAN TORKUL M. RAŞİT CESUR.
Arvind Shrouti,Option Positive
Unit-2 Work study.
Aim - Customer satisfaction at optimum cost. PRODUCTION MANAGMENT.
Production Planning and control – ME 1009 Unit 1 Introduction.
7 Design of Work Systems.
JOB EVALUATION MAGNETIC CONTACTORS 1/26/2018.
Introduction to Motion and Time Study
METHOD STUDY Method study is the systematic recording and critical examination of existing and proposed ways of doing work, as a means of developing and.
Work Study Process Analysis Operation Analysis (Micro) Motion Study
7 Design of Work Systems.
Process engineering Standard times.
UNIT-III Operations Management PREPARED BY CH. AVINASH.
Introduction to Methods Engineering
Principles Of Motion Economy
OPERATIONS PROCESSES.
Process Design and Analysis
WORK STUDY.
(Additional materials)
WORK MEASUREMENT.
WORK STUDY.
RECORDING TECHNIQUES.
CHAPTER 5 WORK STUDY (12 MARKS).
PRODUCTION PLANNING AND CONTROL
Work Study Process Analysis Operation Analysis (Micro) Motion Study
CHAPTER-1 PRODUCTIVITY.
Work Study Process Analysis Operation Analysis (Micro) Motion Study
Fishbone Diagram/ Cause & Effect Diagram
(Lecturer in Mech. Deptt.)
(Lecturer in Mech. Deptt.)
CH-5-Motion and Time Study
Job analysis and Job design
Work Measurements Lab # 5.
Summer Training Department of Industrial Engineering
Manufacturing Production Planning
Production and Operations Management
Presentation transcript:

METHOD STUDY

METHOD STUDY Method study is the systematic recording and critical examination of existing and proposed ways of doing work, as a means of developing and applying easier and more effective methods and reducing costs.

OBJECTIVES OF METHOD STUDY   1.    Improvement of processes and procedures 2.    Improvement in the design of plant and equipment 3.    Improvement of layout 4.    Improvement in the use of men, materials and machines 5.   Economy in human effort and reduction of unnecessary fatigue 6.   Improvement in safety standards 7.   Development of better working environment.

METHOD STUDY PROCEDURE 1. DEFINE 2. RECORD 3. EXAMINE 4. DEVELOP 5. DEFINE NEW METHOD 6. INSTALL 7. MAINTAIN

COMMONLY USED RECORDING TECHNIQUES                 1. Outline Process Charts 2. Flow Process Chart 3. Two Handed Process Chart 4. Multiple Activity Chart 5. Simo Chart 6. Flow Diagrams 7. String Diagrams 8. Cyclegraph 9. Chronocyclegraph 10.Travel Chart Man Type Material Type Equipment Type USING TIME SCALE

CLASS OF CHANGE New Minor Changes Same New Modified CLASS OF CHANGE HANDS & BODY MOTION WORK STATION PROCESS PRODUCT RAW MATERIAL 1  New   Minor Changes Same 2 New 3 4 Modified 5

CLASSIFICATION OF MOVEMENTS Pivot Body member(s) moved 1 Knuckle Finger 2 Wrist Hand and Finger 3 Elbow Forearm, hand and fingers 4 Shoulder Upper arm, forearm, hand and fingers 5 Trunk Torso, Upper arm, forearm, hand and fingers

EXAMINE The questioning technique is the means by which the critical examination is conducted, each activity being subjected in turn to a systematic and progressive series of questions.

PRIMARY QUESTIONS the PURPOSE for which the PLACE at which the SEQUENCE in which the PERSON by whom the MEANS by which

ELIMINIATING COMBINING REARRANGING OR SIMPLIFING With a view to those activities

SECONDARY QUESTIONS The secondary questions cover the second stage of the questioning technique, during which the answers to the primary questions are subjected to further query to determine whether possible alternatives of place, sequence, persons and means are practicable and preferred as a means of improvement upon the existing method.

PURPOSE: what is done? why is it done? what else might be done? what should be done?   PLACE: where is it done? Why is it done there? Where else might it is done? Where should it be done?

SEQUENCE: When is it done? Why is it done? When might it be done? When should it be done?  PERSON: who does it? Why does that person do it? Who else might do it? Who should do it?  MEANS: How is it done? Why is it done that way? How else might it be done? How should it be done ?

DEFINING THE IMPROVED METHOD The report should show: 1.     Relative costs in material, labour and overheads of the two methods, and savings expected. 2. The cost of installing the new method, including the cost of new equipment and of re-laying out shops or working areas 3.  Executive actions required to implement the new method.   It should also give details regarding : 1. The tools and equipment to be used 2.      A description of the method 3. A diagram of the work place layout, jigs/fixtures etc

INSTALLING THE IMPROVED METHOD 1. Gaining acceptance of the change by the Management 2. Gaining acceptance of the change by the workers 3. Maintaining close contact with the progress of the job until satisfied that it is running as intended

THE PRINCIPLES OF MOTION ECONOMY A.     Use of the human body  1.  The two hands should begin and complete their movements at the same time 2.  Motion of the arms shall be symmetrical and in opposite directions and should be made simultaneously 3.    Hands and body motions should be made at the lowest classification at which it is possible to do the work satisfactorily 4.  Rhythm is essential to the smooth and automatic performance of a repetitive operation. 5.   Work should be arranged so that eye movements are confined to a comfortable area, without the need for frequent changes of focus.

 B.        Arrangement of the work place 1.  Definite and fixed stations should be provided for all tools and materials. 2.     Gravity feed, bins and containers should be used to deliver the materials as close to the point of use as possible. 3.     Tools, materials and controls should be located within the maximum working area. 4.     Materials and tools should be arranged to permit the best sequence of motion. 5.         Provision should be made for adequate lighting. 6.       The colour of the workplace should contrast with that of the workplace to reduce eye fatigue.

C. Design of tools and equipment 1. The hands should be relieved of all work of 'holding' the workpiece where this can be done by fixture etc. 2. Two or more tools should be combined wherever possible 3. Levers, cross bars and handwheels should be so placed that the operative can use them with the least change in body position and the greatest mechanical advantage.

PURPOSE OF WORK MEASUREMENT 1. To find ineffective time in a process 2. To set standard for output level 3. To evaluate worker's performance 4. To plan work force needs. 5. To determine available capacity 6. To compare work methods 7. To facilitate operations scheduling 8. To establish wage incentive schemes

THE TECHNIQUES OF WORK MEASUREMENT 1. Stop-watch time study 2. Work sampling 3. Predetermined time standards(PTS) 4. Standard Data

A FAIR DAY'S WORK Amount of work that can be produced by a qualified employee when working at normal pace and effectively utilizing his time where work is not restricted by process limitations. Work Measurement Work measurement is the application of techniques designed to establish the time for a qualified worker to carry out a specific job at a defined level of performance.

THE QUALIFIED WORKER A qualified worker is one who is accepted as having the necessary physical attributes, who possess the required intelligence and education and who has acquired the necessary skill and knowledge to carry out the work in hand to satisfactory standards of safety, quantity and quality STANDARD RATING Rating is the assessment of the worker's rate of working relative to the observers' concept of the rate corresponding to standard pace.

STANDARD PERFORMANCE It is the rate of output which qualified workers will naturally achieve without over-exertion as an average over the working day or shift, provided that they know and adhere to the specified method and provided that they are motivated to apply themselves to their work.

TIME STUDY Basic Steps   a.  Obtaining and recording all available information about the job, operator and the surrounding conditions likely to affect the execution of the work b.    Recording the complete description of the method, breaking down the operation into 'elements' c.      Measuring with a stopwatch and recording the time taken by the operator to perform each 'element' of the operation. d.      Assessing the rating e.      Extending observed time to 'basic times' f.    Determining the allowances to be made over and above the basic time for the operation g. Determining the 'standard time' for the operation.

FACTORS AFFECTING RATE OF WORKING (outside the control of worker)  1.   Variation in the quality of materials used 2.   Changes in the operating efficiency of the equipment 3.   Changes in climatic and surrounding conditions of operation.  FACTORS WITHING THE CONTROL OF WORKER a.   Acceptable variations in the quality of the product b.   Variations due to his ability c.   Variations due to his attitude   SCALES OF RATING 100-133 60-80 75-100 0-100