KAGRA Control Room Appearance (tentative)

Slides:



Advertisements
Similar presentations
KAGRA ISC Electrical Components Layout Yuta Michimura Ando Group Department of Physics, University of Tokyo April 17, 2015.
Advertisements

E2 Correlations Nelson Christensen Carleton College LSC Detector Characterization LIGO-G Z.
Polarization Techniques for Interferometer Control Peter Beyersdorf National Astronomical Observatory of Japan LSC March 2002 Advanced Configurations LIGO-G Z.
Stefan Hild, Andreas Freise, Simon Chelkowski University of Birmingham GWADW, ELBA, May 2008 Virtual Interferometry for future GW detectors.
Investigation of the influence of suspended optic’s motion on LIGO detector sensitivity Sanichiro Yoshida Southeastern Louisiana University.
Measurement of the laser beam profile at PSL to Mode Cleaner interface for the 40 Meter Prototype Interferometer A table of contents 1. Introduction 1.1.
Joshua Smith December 2003 Detector Characterization of Dual-Recycled GEO600 Joshua Smith for the GEO600 team.
LIGO-G D 1 Advanced LIGO Optical & Mechanical Layout Status Dennis Coyne, LIGO Caltech LSC Meeting, 21 Mar 2006 Version -01: with a couple of.
The GEO 600 Detector Andreas Freise for the GEO 600 Team Max-Planck-Institute for Gravitational Physics University of Hannover May 20, 2002.
GEO‘s experience with Signal Recycling Harald Lück Perugia,
干涉仪实验 Michelson interferometer Sliver mirror Sliver mirror with piezo Sliver mirror HeNe source.
LIGO- G R Telecon on June, Mach-Zender interferometer to eliminate sidebands of sidebands for Advanced LIGO Osamu Miyakawa, Caltech.
Optical Levers Layout and Cabling Yuta Michimura, Yuya Kuwahara Ando Group Department of Physics, University of Tokyo November 19, 2015.
LIGO- G Z August 16, 2006August 2006 LSC Meeting - DetChar 1 Spectral Line Working Group Report Keith Thorne, Chair.
AIGO 2K Australia - Italy Workshop th October th October 2005 Pablo Barriga for AIGO group.
KAGRA ISC Electrical Components Layout Yuta Michimura Ando Group Department of Physics, University of Tokyo December 8, 2015.
Modeling of the Effects of Beam Fluctuations from LIGO’s Input Optics Nafis Jamal Shivanand Sanichiro Yoshida Biplab Bhawal LSC Conference Aug ’05 LIGO-G Z.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
The VIRGO detection system
Summary of iKAGRA Test Run Mar 25-31, 2016 Yuta Michimura Department of Physics, University of Tokyo April 12, 2016JGW-T
The Proposed Holographic Noise Experiment Rainer Weiss, MIT On behalf of the proposing group Fermi Lab Proposal Review November 3, 2009.
Date of download: 6/23/2016 Copyright © 2016 SPIE. All rights reserved. (a) Schematic diagram of computer-aided Mach–Zehnder interferometer; laser beam.
IKAGRA 初期アラインメント手順 Initial Alignment Procedure for iKAGRA Yuta Michimura Department of Physics, University of Tokyo July 5, 2016JGW-T
LIGO- G R Amaldi7 July 14 th, 2007 R. Ward, Caltech 1 Prototyping for eLIGO: Power Recycled Fabry Perot Michelson DARM RF ITMy ITMx BS PRM SRM.
Interference of Light Ø It is generally He-Ne type that generates stable coherent light beam of two frequencies. one polarized vertically and another.
Main Interferometer Subsystem
Main Interferometer Subsystem
The Proposed Holographic Noise Experiment
Demonstration of lock acquisition and optical response on
Summary of iKAGRA Test Run Mar 25-31, 2016
Kazuhiro Yamamoto on behalf of KAGRA collaboration
Yuta Michimura Department of Physics, University of Tokyo
Thermal Compensation of the Radius of Curvature of GEO600 Mirrors
Installation of new MPR
Summary of the iKAGRA Run
Interferometer Design for bKAGRA Phase 1 and Beyond
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Workshop on Gravitational Wave Detectors, IEEE, Rome, October 21, 2004
Cartoon of the optical layout around IMC, IFI and IMM
Interferometer Design for bKAGRA Phase 1 and Beyond
Summary of iKAGRA Test Run Mar 25-31, 2016
Summary of iKAGRA Test Run Mar 25-31, 2016
Interferometer Design for bKAGRA Phase 1 and Beyond
Interferometer Design for bKAGRA Phase 1 and Beyond
Interferometer Design for bKAGRA Phase 1 and Beyond
Commissioning Procedure for bKAGRA Phase 1 ( )
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Commissioning Procedure for bKAGRA Phase 1 ( )
Summary of the iKAGRA Run
Commissioning Procedure for bKAGRA Phase 1
Commissioning Procedure for bKAGRA Phase 1
Commissioning Procedure for bKAGRA Phase 1 ( )
Basic Camera Function The camera converts an optical image into electrical signals that are reconverted by a television receiver into visible screen images.
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Yuta Michimura Department of Physics, University of Tokyo
Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration
Commissioning Procedure for bKAGRA Phase 1
Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration
Commissioning Procedure for bKAGRA Phase 1
Interferometer Design for bKAGRA Phase 1 and Beyond
Beam Propagation for bKAGRA Phase 1 with flat ETMs
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Summary of iKAGRA Test Run Mar 25-31, 2016
Interferometer Design for bKAGRA Phase 1
KAGRA ISC Electrical Components Layout
Yuta Michimura Department of Physics, University of Tokyo
Homodyne detection: understanding the laser noise amplitude transfer function Jérôme Degallaix Ilias meeting – June 2007.
KAGRA ISC Electrical Components Layout
Presentation transcript:

KAGRA Control Room Appearance (tentative) This is control room for KAGRA. Earthquake Info Main Monitors CCD Monitor Live View Main Monitor: You can check interferometer condition, temperature, humidity in KAGRA site. CCD Monitor: You can check output of CCD cameras. Earthquake Info (USGS website): You can monitor earthquakes around Japan. Live View: You can see live views in KAGRA site.

Main Monitors OptLev (PR3, BS, EX, EY): MC Control Monitor: Optical lever signals in PR3 (power recycling mirror), BS (beam splitter), EX (X end mirror), and EY (Y end mirror) MC Control Monitor: Control settings in mode cleaner Temperature: Local-temperatures in KAGRA site MC OptLev, MC Trans: Optical lever signals in MCi, MCe, and MCo. And MCe transmitted signal LSC refl: Interference signal Humidity: Local humidities in KAGRA site

Michelson interferometer CCD Monitor PMC trans: Transmitted signal from pre-mode cleaner MCe MCE trans: Transmitted signal from end mirror in Mode cleaner MCi MCe MCF refl: Reflection signal from input mirror in Mode cleaner Mode cleaner Pre-mode cleaner Y end mirror EX trans: Transmitted signal from X end mirror EY trans: Transmitted signal from Y end mirror IFO refl: Interference signal PR3 BS X end mirror Michelson interferometer