Project: Bass Ponds Client: PRO BASS Contractor: Aldershot Landscaping

Slides:



Advertisements
Similar presentations
Geothermal Alliance of Illinois Getting it Right the First Time.
Advertisements

High Force Reservoir LO: To describe the formation of a waterfall and gorge using High Force as an exemplar.
Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.
Foundation Systems.
Geothermal Alliance of Illinois February 28-29, 2012 Dave Johnson, P.E. Illinois Department of Public Health.
Camera Point #4 Photomonitoring Project Coal Creek 10/14/08.
Problem-solving with MATLAB Week 4: Computing volumes: cubic feet, gallons, measuring water NAME _________________________.
What is Liquid Rubber? An asphalt emulsion coating engineered to provide exceptional adhesive, elastic & protective properties An asphalt emulsion coating.
OceansLakes Rivers Ponds Streams.  The Earth produces resources that meet our needs such as soil, wood, and minerals.  Water is another important resource.
An Urban Farm using… “We pay 11 cents / kilowatt hr We sell at 22 cents / kilowatt hr”
CON 4003 Construction Estimating Prof R. V. Locurcio.
Doctor By: Caley Dillard Job Description Getting There.
Fashion Designer By: Lynnflor Lopez Job Description.
Heath Delzell – Engineering Bureau IDNR Engineering Progress to Date and Timeline for Project Completion Design and Construction Obstacles.
Water Erosion: How do processes involving water change Earth’s surface? Part 3 1.
Worktext p. 181 Worktext p ___ units × ___ units = ___ square units 1 6 units
Rafco Products Acid Staining. Rafco Products Acid Staining JadeTurquoiseCoffeeCarmel MahoganyEbonyMission Brown Amber Reactive stains Natural colors Permanent.
Fire Fighter By: Brenan-Morran Thomas Job Description.
Projectile Motion vPKY&feature=related vPKY&feature=related.
Café Owner By: Cricket Carey Job Description Getting There.
Karst Landforms Caves, sinkholes and other soluble rock features
Baseball Player By: Aidan Vogt Job Description Getting There.
Jorge Ramirez TH HOUR. Fresh water  Ocean is a good example for fresh water  Clean  Not dirty  Fresh.
Ocean Floor Features. What you need to know You need to know where and what the Deep Ocean basin, continental margin, shelf, slope, and rise, shoreline,
Gymnastics Teacher By: Lillian Call Job Description.
Bitter Creek Stream Restoration Preliminary Engineering Report Neighborhood Meeting.
Welcome to INFINITY DEWATERING SOLUTIONS, specialist dewatering contractors IDS STARTED IN THE YEAR 2013 IS INTO DEWATERING HAS TAKEN MAJOR DEWATERING.
How Our Earth Sheltered Homes are Constructed Earthlog ® Equity Group, Inc. The American Dream … The Future is Now
Police Officer By: Matthew Gooler Job Description.
Fuel Cells By: Josh DeVane. History  First demonstrated in 1839 by Welsh scientist William Grove.  In 1955, chemists at GE applied platinum to the membranes.
Diversified Roofing
Bass Lake Protection Activity
Career Exploration 7th/8th grade
Firestone Metal Warranties
What is Rubberit? Products
Corrosion Control.
Focus on Habitat: Wild Brook Trout
CPR™ System.
Addition of Real Numbers
RFID Label Tags Test Results
ocean runoff sodium chloride continental shelf continental slope
DAMP-PROOFING AND WATER-PROOFING COURSE
Area of Shapes.
RESIDENTIAL DESIGN PROJECT
Formation Date: 9 November 1977 Geo Code: R
ABOUT US Here at Roofing 2000, we are specialists in the repair and Restoration of a range of domestic and Commercial Roofing solutions and materials,
BACK SOLUTION:
How to Hire a Good Landscape Contractor in Princeton NJ.
GHMS Personal Sports Banner
Multi-tier System of Supports
در تجزیه و تحلیل شغل باید به 3 سوال اساسی پاسخ دهیم Job analysis تعریف کارشکافی، مطالعه و ثبت جنبه های مشخص و اساسی هر یک از مشاغل عبارتست از مراحلی.
Warm-up  .
Description Most paragraphs that we write in school can be called main idea, description, or statement and support paragraphs.
DO NOW **Test TOMORROW!! Solve the following equations: 4
Multi-tier System of Supports
Geo units Formation Dates In New Zealand
Stalagmites and Stalactites
I PRO' -.._ r.. f FOLLOW I 0.
EMIS 7300 SYSTEMS ANALYSIS METHODS FALL 2005
Please get out: October 4, 2013 Today’s lesson: Turn in lab report
Diffusion and Osmosis.
Application Issues & Solutions
Third Grade Mrs. Johnson’s Sept , 2016 What We’re Learning
A selectively permeable membrane separates the solutions in the arms of a U-tube. The membrane is permeable to water and substance B, but not substance.
Thing / Person:____________________ Dates:_________________
Formation Date: 9 November 1977 Geo Code: R
Formation Date: 20 November 1993 Geo Code: R
Tainan Section & Taipei Section
Formation Date: 14 November 2003 Geo Code: R
Formation Date: 14 February 2007 Geo Code: R
Presentation transcript:

Project: Bass Ponds Client: PRO BASS Contractor: Aldershot Landscaping Applicator: TORO Water Proofing Total Coverage: 10,000 sq. ft. Product: Rubberit Spray Grade, Brush-on Sealer and Geo Membrane Completion Date: October 21, 2004 Job Description: Rubberit was used to create and waterproof a magnificent multi level fishing Bass Ponds

Applying Geo-Membrane

Creating a “Trench” to support the membrane along the shoreline

Sealing the edges with Brush-on, then applying Spray Grade with Calcium Chloride Catalyst

Brush-on Sealer along drains and rock formations

Applying to trench areas

Spray Grade “A” / “B” solution.

Multi Tier Pond and Water Falls