Wastewater Treatment Plant Biological Nutrient Removal & Digester Project - Package 2 Construction Contract City Council Meeting – August 1, 2017 Package.

Slides:



Advertisements
Similar presentations
SPRINGETTSBURY TOWNSHIP.
Advertisements

JOINT MEETING OF ESSEX AND UNION COUNTIES Virtual Plant Tour.
Water & Wastewater Construction Back Forward Wastewater Treatment Plant and Pump Station Improvements, Haverhill, MA.
The CSO Abatement Project Presented by: Paul Nordstrom Director of Operations and Engineering.
Capital Improvement Program (CIP) Overview Jim Herberg, P.E., BCEE June 14, 2012.
Nutrient Issues at the Blue Plains WWTP February 2004.
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
Anne Arundel County Department of Public Works
Wastewater Treatment or Resource Recovery: Maximizing the Energy Potential of Your Infrastructure Angela Hedgecock, PE, CEM, LEED AP Siemens Industry,
The Town of Discovery Bay Community Services District Wastewater Treatment Plant Master Plan NOVEMBER 9, 2011.
Energy Efficient Design Low Cost State Loan Low-Impact Construction Novato Sanitary District Wastewater Facilities Upgrade Presenter: Beverly James, Manager-Engineer.
Upgrade of Sana'a WWTP1 Upgrade of the Sana‘a Wastewater Treatment Plant Presentation of the Design Implementation of the New Preliminary Wastewater.
Municipal Wastewater Treatment Preliminary Seventh Power Plan Energy Efficiency Estimates October 14, 2014 West Point Wastewater Treatment Plant, Seattle.
GALENA WASTEWATER TREATMENT UPGRADES Informational Presentation for the Sassafras River Association Presented by Ryan J. Rangel, PE April 23, 2015.
Wastewater Treatment & Collection System Improvements.
Municipal Wastewater Treatment Preliminary Seventh Power Plan Energy Efficiency Estimates November 18, 2014 West Point Wastewater Treatment Plant, Seattle.
1 Purpose  Summarize Monday’s workshop  Update on the Radio System – confirm staff’s recommendation  Jail Expansion – discussion/direction  Discussion.
Municipal Wastewater Efficiency Improvements Potential Savings for the 6 th Power Plan September 30, 2008 Regional Technical Forum South Treatment Plant.
Pennsylvania Water Environment Federation PennTEC Annual Technical Conference June 4, 2013 Altoona Westerly Wastewater Treatment Facility BNR Conversion.
March 31st and April 1st, 2009Mile High Industrial and Automation Conference The Challenges in Upgrading Plant Automation for an Existing Wastewater Treatment.
Increasing Energy Efficiency at the Allegan WWTP MWEA/AWWA Joint Annual Conference August 19, 2010.
Phosphorus Removal in a Membrane Reactor System— A Demonstration Study Wayne Lorenz, P.E. and Matthew J. Gavin Wright Water Engineers, Inc. and Newell.
Water System Planning Study
Town of Tecumseh 2012 Capital Works Projects. Road Projects ProjectBudget Road Paving Projects……………………..$850,000 – Asphalting – tar & chip – crack sealing.
Springfield Metro Sanitary District's new Spring Creek WWTP project benefits from managing project information electronically.
Unit 8: Waste Management Section 2: Wastewater Treatment.
Welcome To The Muskegon County Wastewater Management System A world class land application wastewater treatment facility!
2008 Facility Plan Update May Purpose  Comprehensive Plan through 2033 –Builds on Past Work –Adjust for Changing Conditions  Identify Capacity,
A cost index is a ratio of the cost of something now to its cost at some time in the past General equation is: C t = C 0 (I t /I o ) Example: The construction.
A cost index is a ratio of the cost of something now to its cost at some time in the past General equation is: C t = C 0 (I t /I o ) Example: The construction.
METRO WASTEWATER RECLAMATION DISTRICT CAPITAL IMPROVEMENTS PROGRAM
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Wastewater Treatment. Moorestown Wastewater Treatment Plant.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November.
South Fork improvements program – a mid-program report
Public Information Meeting Wastewater Treatment January 26, 2016.
Richland Creek Water Supply Program Contract for WTP and Pump Stations CMAR Services and Program Update Paulding County, Georgia Board of Commission Work.
Update on RCR Permitting
90% PLAN APPROVAL. Presentation Outline  Board Direction  90% Plan Modifications  Cost Estimates  Project Timeline  Recommendation.
Santa Rita Wastewater Treatment Plant Alternative Site Investigation Addendum Sawmill Road Site.
Wastewater Treatment Plant No. 2 Construction Contract City Council Workshop February 9, 2016.
City Council Presentation Progress Report No. 12 For September 2006 November 6, 2006.
Approve Change Order No. 4 for the Caylor Wholesale Meter Modification Item 4B.
UTILITY PARTNERSHIP CITY OF STOCKTON & OMI / THAMES WATER SERVICE CONTRACT.
Strength through History & Innovation City of Beaumont Salt Mitigation Feasibility Study Summary of Findings.
WATER – WASTEWATER TREATMENT EXPERIENCE
WATER – WASTEWATER TREATMENT EXPERIENCE
County of Hawaii, Department of Environmental Management
Budget Study Session – May 22, 2012
Addition of Fire Alarm system. None existing.
Kings Bluff Raw Water System Parallel Raw Water Main Project
Preliminary Treatment Removing Large Solids Material by Raking & Screening REMOVES 1.
Capital Facilities Program Update San Rafael City Schools
Perris Water Filtration Plant Membrane Upgrade – Phase I
Optimising Sludge Dewatering – Benefits from Shared Water Services
MIND-BLOWING FACTS ABOUT WATER PURIFICATION.
City of Noblesville Wastewater Utility
Pinole-Hercules Water Pollution Control Plant Upgrade Project
Application of Process Simulators and CFD to Optimize Process Capacity of WRRFs November 13, 2017.
Modifications at Existing WTP: $450,000 Construct New WTP: $39,100,000
Wastewater Facilities Upgrade Project
Brackish Water Desalination Project
Sandy Grove Middle School
City of Janesville Wastewater Facility Plan Amendment Public Hearing
City Council Business Meeting
Welcome This is the second of several public meetings that will be held during the planning and design of the Big Creek Water Reclamation Facility (WRF)
Richland Creek Water Supply Program Program Update
Change Order 5, Contract S03003D01 Engineering Services for SSWRF Post-Secondary Capacity Improvements and Restore ED’s Original Delegated Authority.
Change Order Number One Purchase Order for Ferric Chloride Use
Presentation transcript:

Wastewater Treatment Plant Biological Nutrient Removal & Digester Project - Package 2 Construction Contract City Council Meeting – August 1, 2017 Package 2 GMP: $28,120,131

Package 2 Scope: (Contract Value of $28,120,131) Digester Facility (2 Tanks, Mechanical Room, Ferric Chloride, MCC) Digester No. 3 ALPS Hydraulic Improvements MCC Ferric Chloride Digester No. 4 RAS Pump Station Improvements LEGEND Work to Exist. Facilities (BNR) New Facility (BNR) New Digester Facility Biological Nutrient Removal (BNR)/ Organic Capacity RAS Anoxic Tank RAS Headworks Screening Digester

Package 3 Scope (2018): (Contract Value of $3,361,416) Site Restoration & Seeding Asphalt Paving UV Hydraulic Improvements Site Restoration & Seeding LEGEND Package 3 Scope New Facility (BNR) New Digester Facility RAS Digester Site Restoration & Seeding Manhole A

Construction Phase Cost Breakdown Garney Construction Guaranteed Maximum Price (GMP): Package 1 GMP: $ 3,041,000 Package 2 GMP: $28,120,131 Package 3 GMP: $ 3,361,416 Total: $34,522,547 City of Loveland W&P Project Budget (includes $24.9M Loan): 2017 Construction Budget: $31,421,000 2018 Construction Budget: $ 3,700,000 (Proposed in 2018 Budget) Total: $35,121,000 Budget Surplus/Contingency: $598,453 (if 2018 Budget is approved)

Original Construction Estimate Current Construction GMP: $34,522,547 Difference (increase): $ 1,822,547 Reasons for Increase Hydraulic Capacity Increase – Rerate from 10 MGD to 12 MGD RAS PUMP Station Upgrades Aeration Lift Station Modifications UV Modifications Enhanced Process Design Improvements Ferric Chloride System Inclusion of 2018 Budgeted Items

QUESTIONS?