Control Phase Wrap Up and Action Items

Slides:



Advertisements
Similar presentations
Lean Six Sigma Project Presentation Template
Advertisements

Six Sigma Quality Engineering
QMS, ISO and Six Sigma It’s all related….. QMS Any Quality Management System must satisfy four requirements: Processes must be defined and their procedures.
Paul Prunty The 7 Basic Quality Tools ~ The DMAIC Process Continuous Improvement and … To a hammer, everything’s a nail … How many tools do you have in.
Overview of Lean Six Sigma
Barry Murash MBBit Nortel 2007
This material was produced under grant number SH SH-1 from the Occupational Safety and Health Administration, U.S. Department of Labor. It does not.
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
Program Participants: Department Managers, Project Leaders, Senior officers, Black Belt candidates and anyone who desires an understanding of Lean Six.
PMP® Exam Preparation Course
1 Russ Albright, Director. 2 Overview Vision and motivation What is Six Sigma?
Welcome to Lean Six Sigma Green Belt Training
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
Define Tollgate Checklist
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
Project Storyboard (Page 1 of 2)
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Six Sigma is a business philosophy that employs a client-centric,
1 Prof. Indrajit Mukherjee, School of Management, IIT Bombay Bill Smith’s findings…. Bill Smith’s paper concluded that if product was found defective and.
DMAIC: Control Robert Setaputra. Objective Maintain the changes made in the X’s in order to sustain the improvements in the Y’s.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
Practical Assessment Project Template
Phase-1: Prepare for the Change Why stepping back and preparing for the change is so important to successful adoption: Uniform and effective change adoption.
Measure Phase Welcome to Measure. Welcome to Measure Phase 2 Wrap Up & Action Items Process Capability Measurement System Analysis Six Sigma Statistics.
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
Define Phase Wrap Up and Action Items. Define Phase Overview—The Goal The goal of the Define Phase is to: Identify a process to improve and develop a.
Analyze Wrap Up and Action Items
Project Management PTM721S
Practical Assessment Project Template – DMADV
Six Sigma Greenbelt Training
Continuous Improvement Project (A Guideline For Sponsors)
TM 720: Statistical Process Control DMAIC Problem Solving
Practical Assessment Project Template
Six Sigma.
LEAN SIX SIGMA PROJECT TEMPLATE
Control Phase Wrap Up and Action Items
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
Core Competencies Training for Supervisors
Six-Sigma : DMAIC Cycle & Application
Lean Six Sigma DMAIC Improvement Story
Improve Phase Welcome to Improve
Measure Phase Welcome to Measure
Questioning: Foundation for an Effective Champion …
TechStambha PMP Certification Training
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Define Phase Wrap Up and Action Items
Quality Certification
Practical Assessment Project Template
Lean Six Sigma DMAIC Improvement Story
OPS/571 Operations Management
Lean Six Sigma DMAIC Improvement Story
Quality Management Six Sigma
DMAIC Analyze, Improve, Control
LEAN SIX SIGMA PROJECT TEMPLATE
Improve Phase Wrap Up and Action Items
Control Phase Welcome to Control
Project Champion: Process Owner: Organization: Project Location:
Control Phase Welcome to Control
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
DMAIC STANDARD WORK TEMPLATE
The 7 Basic Quality Tools ~ The DMAIC Process
Analyze Phase Welcome to Analyze
Six Sigma DMAIC Process
DMAIC STANDARD WORK TEMPLATE
Six Sigma DMAIC Process
Measure Phase Wrap Up and Action Items
QMS, ISO and Six Sigma It’s all related…..
Lean-Green belt six sigma program
Six Sigma DMAIC Process
Practical Assessment Project Template – DMADV
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

Control Phase Wrap Up and Action Items

Control Phase Overview—The Goal The goal of the Control Phase is to: Assess the final Process Capability. Revisit Lean with an eye for sustaining the project. Evaluate methods for Defect Prevention. Explore various methods to monitor process using SPC. Implement a Control Plan. Gooooaaallllll!! Please read the slide.

Organizational Change Each “player” in the process has a role in SUSTAINING project success achieved. Accept responsibility Monitoring Responding Managing Embracing change & continuous learning Sharing best practices Potential for horizontal replication or expansion of results Please read the slide.

Control Phase—The Roadblocks Look for the potential roadblocks and plan to address them before they become problems: Lack of project sign off Team members are not involved in Control Plan design Management does not have knowledge on monitoring and reacting needs Financial benefits are not tracked and integrated into business Lack of buy in of process operators or staff There are some things that can get in your way….

DMAIC Roadmap Identify Problem Area Please read the slide. Define Assess Stability, Capability, and Measurement Systems Identify and Prioritize All X’s Prove/Disprove Impact X’s Have On Problem Identify, Prioritize, Select Solutions Control or Eliminate X’s Causing Problems Implement Solutions to Control or Eliminate X’s Causing Problems Implement Control Plan to Ensure Problem Doesn’t Return Verify Financial Impact Determine Appropriate Project Focus Estimate COPQ Establish Team Champion/ Process Owner Define Measure Analyze Improve Control Please read the slide.

Control Phase Please read the slide. Improvement Selected Develop Training Plan Implement Training Plan Develop Documentation Plan Implement Documentation Plan Develop Monitoring Plan Implement Monitoring Plan Go to Next Project Develop Response Plan Implement Response Plan Develop Plan to Align Systems and Structures Align Systems and Structures Verify Financial Impact Please read the slide.

Control Phase Checklist Control Questions Step One: Process Enhancement And Control Results · How do the results of the improvement(s) match the requirements of the business case and improvement goals? What are the vital few X’s? How will you control or redesign these X’s? Is ther e a process Control Plan in place? Has the Control Plan been handed off to the process owner? Step Two: Capability Analysis for X and Y Process Capability How are you monitoring the Y’s? Step Three: Standardization And Continuous Improvement How are you going to ensure that this problem does not return? Is the learning transferable across the business? What is the action plan for spreading the best practice? Is there a project documentation file? How is this referenced in process procedures and product dr awings? What is the mechanism to ensure this is not reinvented in the future? Step Four: Document what you have learned Is there an updated FMEA? Is the Control Plan fully documented and implemented? What are the financial implications? Are there any spin - off pr ojects? What lessons have you learned? General Questions Are there any issues/barriers preventing the completion of the project? Do the Champion, the Belt and Finance all a gree that this project is complete? Please read the slide.

Planning for Action WHAT WHO WHEN WHY WHY NOT HOW Test validation plan for a specific time   Calculate benefits for breakthrough Implement change across project team Process map of improved process Finalize Key Input Variables (KPIV) to meet goal Prioritize risks of output failure Control plan for output Control plan for inputs Chart a plan to accomplish the desired state of the culture Mistake proofing plan for inputs or outputs Implementation plan for effective procedures Knowledge transfer between Belt, PO and team members Knowledge sharing between businesses and divisions Lean project control plan Please read the slide. Establish continuous or attribute metrics for Cpk   Identify actual versus apparent Cpk Finalize problem solving strategy Complete RPN assessment with revised frequency and controls Show improvement in RPN through action items Repeat same process for secondary metrics

Have started to develop a Project Plan to meet the deliverables Summary At this point, you should: Have a clear understanding of the specific deliverables to complete your project Have started to develop a Project Plan to meet the deliverables Have identified ways to deal with potential roadblocks Be ready to apply the Six Sigma method on your NEXT project Please read the slide.

It’s a Wrap Congratulations you have completed Lean Six Sigma Yellow Belt Training!!!

Get the latest products at… The Certified Lean Six Sigma Yellow Belt Assessment The Certified Lean Six Sigma Yellow Belt (CLSSYB) tests are useful for assessing a Yellow Belt’s knowledge of Lean Six Sigma. The CLSSYB can be used in preparation for the ASQ or IASSC Certified Six Sigma Yellow Belt exam or for any number of other certifications, including private company certifications. The Lean Six Sigma Yellow Belt Course Manual Open Source Six Sigma Course Manuals are professionally designed and formatted manuals used by Belt’s during training and for reference guides afterwards. The OSSS manuals complement the OSSS Training Materials and consist of slide content, instructional notes data sets and templates. Get the latest products at… www.OpenSourceSixSigma.com 11 Advertisement 11