September 2016 EVM 202—Lesson 4 Integrated Baseline Review Process (Part 4: Baseline Maintenance)

Slides:



Advertisements
Similar presentations
Replanning, Reprogramming, and Single Point Adjustments July NAVY CEVM
Advertisements

Module 8: Government Required Reports
ANSI/EIA A EIA STANDARD Earned Value Management Systems Overview May 2, 2006 NDIA Program Management Systems Committee Walt Berkey, Lockheed.
An Overview of Earned Value Management (EVM) Using EVM to Track Progress.
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
National Aeronautics and Space Administration ANSI/EIA-748-B Earned Value Management Systems (EVMS) 32 Guidelines ANSI/EIA-748-B Earned Value.
Chapter 10: Monitoring and Controlling Change
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
Earned Value Management (EVM) Fundamentals
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Earned Value Management Guidelines Tony Finefield Finefield Consulting CPM Webinar 5 September
CPM-400: xxx Lesson B: EV Data Analysis I Instructor Ellen Udell
Eleanor Haupt Aeronautical Systems Center Lloyd Carter
Validating IPMRs, CPRs, and IMS Deliverables NAVY CEVM
FASTER DECISIONS. BETTER DECISIONS.  PRICE S YSTEMS LLC Earned Value Concepts Course.
Dave Bachman DAU / CDSC September 9, 2004
Working Draft 1 EARNED VALUE MANAGEMENT / AND INTEGRATED BASELINE REVIEWS.
EARNED VALUE MANAGEMENT (EVM)
EVM Home Page = = “One Book” DAU POC: (703) (DSN 655) Address: Revised.
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
Mohawk Vehicle - MEGA HERZ ELEC & VEN - MOH-2 F C-0050 J:\CS40\Data Analysis\- Standard Analysis Package/Sample Standard Analysis Package.
1 Cost Health Checks Aug 2013 NAVY CEVM 2 Outline BCWP with no ACWP ACWP with no BAC Credibility of the Most Likely EAC Timely detail planning MR health.
Management & Development of Complex Projects Course Code - 706
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
Presented by Niyi Ladipo September 14,  Results of the Survey  What is Earned Value Management (EVM)?  EVM vs. Traditional Cost Management 
EARNED VALUE  Earned Value Management Systems  Earned Value Analysis.
0 Earned Value Management. 1  What is it?  Where did it come from?  What’s so special about it?  How do you do it?  What is an EVMS?
E ARNED V ALUE M ANAGEMENT ‘G OLD C ARD ’ Projected Slip ? Management Reserve Cost Variance Schedule Variance ACWP Cum BCWP Cum BCWS Cum $ EAC Time Now.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
EVM Home Page = Address: DAU POC: (703) (DSN 655) Revised December 2006 TERMINOLOGY.
October 11, EARNED VALUE AND PERFORMANCE MANAGEMENT.
Project Management 1 Project Control. Project Management 2 Topics Project Control Status Reporting Earned Value Analysis.
Ch. 13 Project Management “Process” Why do we need project management? Why can’t we just follow one of the software development process and be left alone?
Performance Measurement Baseline Contract Price (Project Price)
Earned Value Analysis by Miles M. Hamby, PhD Copyright©2014 Miles M
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
CHAPTER:7 Project Cost Management
Earned Value Management
Project Management – PTM712S
Copyright All Rights Reserved by
Chapter 7: Project Cost Management
IEVMC Lesson 8 FY14 Analysis Case Study Performance Management Analysis Tools Student guide page 8-5.
ENGR 281 Engineering Scholars Program Project Management Life Cycle Overview K. F. Reinschmidt J. L. Frank / Marathon Ashland Petroleum LLC Chair in.
Performance Measurement Baseline Contract Price (Project Price)
Earned Value Management
Project Cost Management
Earned Value Management & Oracle Primavera P6
September 2016 EVM 202—Lesson 8 Integrated Product Team (IPT) Analysis and Performance Case.
Progress and Performance Measurement and Evaluation
Earned Value Management
Earned Value - What is it
Dave Bachman DAU / CDSC September 9, 2004
EVM 202—Lesson 3 EVMS Guidelines and Compliance
September 2016 EVM 202—Lesson 4 Integrated Baseline Review (IBR) Process (Part 1: IBR Process and Baseline Development)
LSST Project EVMS Performance Overview Kevin E
Implementing EV in IT A Three Step Approach John Chapman Touchstone Ltd
Earned Value Measures Planned Value (PV) Earned Value (EV)
فرآيند كنترل پروژه.
Earned Value Management
Cost Health Checks NAVY CEVM
Project Management Anirudh Reddy Agasti 4/25/2011 CSCI 577b.
Replanning, Reprogramming, and Single Point Adjustments July NAVY CEVM
Linac Coherent Light Source (LCLS)
Cost Health Checks NAVY CEVM
Project Management Life Cycle
Validating IPMRs, CPRs, and IMS Deliverables NAVY CEVM
Managing Project Work, Scope, Schedules, and Cost
Chapter 13: Software Project Management
Presentation transcript:

September 2016 EVM 202—Lesson 4 Integrated Baseline Review Process (Part 4: Baseline Maintenance)

Management Processes Process Description Baseline Maintenance Process Maintains the PMB as a current depiction of the plan for accomplishing remaining work and accommodates changes to PMB caused by program dynamics Risk Management Process Documents and classifies risks associated with the PMB PMs should document action risks from IBR in risk management planning Each action risk addressed in risk management planning should be classified as to its probability of occurrence, consequences, handling, and identification of the individuals responsible for mitigation actions Business Processes Include scheduling, estimate to complete, earned value methodology, and managerial analysis Each process supports the project management Inappropriate or inadequate use of these processes may fail to identify project risks and may add risk to the project After an IBR, the emphasis shifts to management processes, which provide PMs with a continuous source of project information that enables a mutual understanding and reduces or eliminates the need for future IBRs.

Baseline Maintenance Ongoing Baseline Validity and Realism Validity PMB still represents goals and objectives PMB points to valid variances Variances result in management action Timely incorporation of contract changes Proper use of management reserve (MR) and undistributed budget (UB) Realism PMB changes made for management reasons, not for reporting reasons Use of over target baselines (OTBs) Use of single point adjustments (SPAs)

Baseline Maintenance Process PMB Chart—The program at a glance Troublesome baselines Front loaded Rubber baseline SPAs PMB changes Contract changes Internal replanning Formal reprogramming

The Program at a Glance

Troublesome Baselines

Hypothetical PMB Contract structure Period of performance: 38 months 1000 uniform control accounts (CAs) scheduled to approximate a Rayleigh distribution CA budgets: $10/each (BCWS) Actual CA costs: $11/each (ACWP) Assume that there are no schedule issues: BCWP = BCWS (budgeted cost for work performed = budgeted cost for work scheduled) Contractor has purposely underestimated costs to win contract This is a buy-in contract

Front-Loaded Baseline PMB Plot

Front-Loaded Cost Variance (CV) Chart

Rubber Baseline PMB Plot

Rubber Baseline CV Chart

Single Point Adjustment (SPA) An arbitrary baseline adjustment at any level of the Work Breakdown Structure (WBS) where BCWS is set equal to BCWP, or BCWP is set equal to actual cost of work performed (ACWP), or both BCWS and BCWP are set equal to ACWP and incomplete work is replanned to be completed on schedule and within the original PMB budget SPAs distort earned value cost and schedule metrics and make index-based earned value estimate at completion (EAC) computations unreliable.

SPA PMB Plot

SPA CV Chart

PMB Changes

Use of Management Reserve (MR) PMB Plot

Use of MR CV Chart

Effect of Contract Changes on PMB

Effect of Contract Changes on CV

Over Target Baseline/Over Target Schedule (OTB/OTS) Replanning actions involving establishing cost or schedule objectives that exceed the desired or contractual objectives on the program An OTB is a recovery plan, a new baseline for management when the original objectives cannot be met and new goals are needed for management purposes. The contractor must get permission from the Government before executing an OTB/OTS.

Over Target Baseline (OTB) PMB Plot

Effect of OTB on CV

IBR Risk Management Processes and PMB Do PMB revisions support program goals, objectives, and milestones? Changes must be incorporated in a timely manner Changed budgets must be reconcilable with prior budgets Retroactive changes must be controlled Changes must be made in the period the issue is identified The change-trail must be clearly documented An over-arching question: Is the new PMB valid?

Lesson 4 Summary Terminal Learning Objective Examine the performance measurement baseline (PMB) validity Enabling Learning Objective Explain the PMB development process Apply the DoD Integrated Baseline Review (IBR) policy and process Given the Earned Value (EV) technique, analyze control account EVM variables to select EVM metrics Analyze a schedule using the Precedence Diagram Method (PDM) Analyze IBR documents to determine areas of concern within the five risk areas in preparation for control account manager (CAM) interviews Analyze the current schedule to determine status Explain the importance of PMB maintenance