NuMI - Shutdown – Week 9 Horn 2 Repair – Successfully Tested the Repaired RAW Leak Drained and Refilled Horn 1 and 2 RAW Systems Changed Horn 2 DI Bottle.

Slides:



Advertisements
Similar presentations
Sustainable School Design Creating Healthy, High Performance School Facilities Presented by Stephen M. Koontz, Energy Services Leader, Tampa Bay Trane.
Advertisements

Durra Eco-Form Cabins Build your own home and move in within a week Fast, Simple and Affordable.
The MATURA System, an overview. Matura Slide series The Matura System, an overview.
Zone Control Air System Why? 1.Provides room by room comfort control. 2.Reduces equipment run time. 3.Eliminates hot/cold rooms. 4.Works with conventional.
LCW Upgrades - Final Booster RF Cavity LCW Isolation Valve Replacement. – 8 valves and unions previously replaced – An additional 10 valves and unions.
Neutrinos from Stored Muons STORM Target Station Conceptual Design 15-April-2013 Kris Anderson Fermilab/Accelerator Division/Mechanical Support Department.
NuMI Target Pile Fan Repair Michael Andrews 3/15/10.
Dishwasher Rework. Identify Unit Disconnect Power Turn off Breaker… … or unplug power cord.
NuMI Radiation and Environmental Protection NBI th International workshop on Neutrino Beams and Instrumentation September 5-9, 2006 Mike Martens.
Special Report NuMI Target Updates Special Report NuMI Target Updates Ongoing Work - Four Parallel Activities I.Target Hall We expect to move NT-05 to.
NUMI NuMI Hot Handling Jim Hylen (FNAL) NBI02 March 13, 2002 Page 1 NuMI Target Hall Radioactive Component Handling NuMI Target Hall Utilizes Three Basic.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
2013 NATEF Task Area A-7 Heating, Ventilation, and A/C A. A/C System Diagnosis & Repair B. Refrigeration System Component D & R C. Heating, Ventilation.
1 Connecticut’s New Energy Code Connecticut ASHRAE Tech Session October 13, 2011 Frederick F. Wajcs, Jr. Senior Energy Engineer Connecticut Light and Power.
Tom Kader Chief Electrical Inspector Spaces About Electrical Equipment Sufficient access and working space shall be provided and maintained about.
PIP Update Linac Utilities for 2014 shutdown Matthew Gardner, 4/23/14.
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
A sad but true story of Dosti Flamingos. Very beautiful from the outside…
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
S A Griffiths Target Review Jan 2009 Target Electrical / Control Schematic HexBridge Power electronics Interface PSU Capacitor Bank Local Control Interface.
NuMI Run II meeting Nov. 4, 2004 NuMI Target Hall Jim Hylen Page 1 NuMI Target Hall Status / Plan 8 slide introduction to target hall 9 slide list of status.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
The electricians have first to mark the walls so they know where to cut tracks for the conduit and the joiner fits the stud walls so first fix plumbing.
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
J&J CONTRACTORS’ MAJOR PHASE DRAWING GUIDE HAFB 1305 HVAC Repair Solicitation # MXRD /8/09 1. Chiller line-horizontal work 2 weeks (2 dn shift)
NuMI NuMI Target Hall Air System Review Introduction July 30, 2003 Jim Hylen / FNAL Page 1 NuMI Target Hall Air System Review Introduction Air system for.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
F NuMI Beamline Accelerator Advisory Committee Presentation May 10, 2006 Mike Martens Fermilab Beams Division.
Matthew Gardner, 8/20/14.  Replace old water based AC system with conventional rooftop AC system. Drain and abandon old water lines.  Remove old air.
Requirements for computing room A. Gianoli, M. Serra, P. Valente.
Status and schedule for the H - source upgrade at HINS beam line HINS Meson meeting January 5 th, 2012 L. Prost (most inputs from Steve Hays & Alex Chen)
All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono FAR DETECTOR: FD live time was 95.7% for cosmics last week (ROP7 problems reported at.
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
1 OF 16 INFO:You observe that this fire pump system is leaking. This fire pump system is not designed to leak. DEF:Leaking Central Water Supply (Domestic.
VC117 February 2009Jean-Sébastien GraulichSlide 1 MOM Report o Yagmur Torun ( June 15 - July 14) o J.S. Graulich ( July 13 - August 7) Jean-Sebastien Graulich,
Automotive Heating and Air Conditioning, Fifth Edition By Tom Birch © 2010 Pearson Higher Education, Inc. Pearson Prentice Hall - Upper Saddle River, NJ.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
Commissioning Forms & Procedures ESCONDIDA CONSTRUCTION COMPLETION PHASE CIVIL PROCEDURES INSTRUMENTACION PROCEDURES Testing Test of Density In Field Z01.
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
Twin Spine Installation. Installation of a Twin Spine is very simple and easy. Before you begin, make sure you have a copy of the installation instructions,
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
FESS/Ops Shut Down Summary Week Ending 9/7/12. – FESS needs a CUB Cooling Outage for installation of Barriers in the CUB Chiller 4160 Volt Starter Cabinet.
Mike Andrews May 10, Week 54 NuMI Activities Initial test controls on the MI65 RAW exchange skid Complete hydrostatic test of the MI65 exchange.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire DCP Meeting 20/06/12 Schedule for the technical of June.
FESS - OPS SHUTDOWN UPDATE. ELECTRICAL Feeder 46A Cable tie in - COMP. A0,C0, E0 CRYO Transformers & Switchgear - Not Complete Master Substation - COMP.
Mike Andrews August 30, Weeks 1-5 Activities Rad survey open to supervised access & re-core Install crane electronics & remove shield wall Retrieve.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
Duck Pond Landfill 3100 Blk. of National City Blvd. National City, CA AA-0017 Photos by Anthony TorresPage 1 of 3 June 26, 2013 The Volkswagen.
Friday 5/1/ meeting. I wish to lock in the power outage onTuesday 5/5/09 at the end of the 0930 lab scheduling meeting speak now or :
Mike Andrews August 17, Week 16 NuMI Activities Leak testing of DI bottles & Casks Complete all bottles & casks RAW Impulse line upgrade Finished.
MI/RR Shutdown 2012 Dec Gev Lines/Injection region: Staging equipment, cleaning and prepping new part to start vacuum work. Preparing to modify the.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
Mike Andrews January 31, Weeks Activities Target Pile Fan Upgrades Install piping for new cooling coil units Install controls for new coil.
AD ops. - NUMI July 7, 2006 Jim Hylen/FNAL Page 1 Had been having problem with water collecting in tank under horn 1, instead of coming back to surge tank,
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Dec 9, 2013.
1 LBT Q Eng/SW Review PSPI: PEPSI installation preparation.
Hall A Target Status 9/27/16 Dave Meekins.
B245 Modifications & Cabling Update
Troy School District 2013 Bond Program – Series 1 Construction Update September 2016 Barton Malow | TMP.
Repairing the Electrical Components
KFA10 status 20/05/2019 Currently:
Polarized 3He target installation
KFA10 status 03/06/2019 Currently:
Presentation transcript:

NuMI - Shutdown – Week 9 Horn 2 Repair – Successfully Tested the Repaired RAW Leak Drained and Refilled Horn 1 and 2 RAW Systems Changed Horn 2 DI Bottle and High Potted OK Planning on Horn 2 Pulsing for Next Week Clapper Valve Installed on Horn 1 Raw System Target Chase Chiller Delivery Expected Mid Next Week Drains in Target Hall Being Covered to Reduce Area Humidity Electric Installed and Ready for New Desiccant Units Prism Well Underway with Dehumidification Duct Work New Motorized Damper Installed Above Door to DK Passageway OTR Installed and Surveyed in the Pre-Target New Pre-Target Drip Ceiling Installed Concrete Coring Complete for Various Piping and Electric Excavation and Concrete Work in Process at SR3 Conduit In and Concrete Pour Today Reworking HV Cables & Connections at New Motorized 13.8 Switch