2018 Natural Gas Beta to LP Changes

Slides:



Advertisements
Similar presentations
Assembly Manual Mike Fortney 04/09/2004 CricketSat Receiver.
Advertisements

Click on this image to open the full PDF document.
First Article Inspection Report
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
Shielding the Weiner PSU 7 May 2013 Kiril Marinov ASTeC, MaRS, DL 1.
Detail and Assembly Drawing
June 2003 June 2003 GECP-Lighting Customer Presentation.
FMTV COOLING SYSTEMS 4/23/2017.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
Cold Magnetic Shield Update
Mechanical Designs of The Central Detector Jinyu Fu
Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Meeting Task Group Session on Revised.
5K shield removal experiment in STF cryomodule Norihito Ohuchi 2008/11/181ILC08-GDE-Meeting (CHICAGO)
Single Module Vertical Outlet Tube Change
2017 Single Module Beta to LP Changes
Datum UM12 – Ultrasonic Sensor Market Introduciton Name.
LARP Vertical Test Facility
QSK38 Tier 4 Final OEM Impact Presentation
Application Engineering Role
DEF Pressure Line Routing requirement and testing
Application Engineering Role
Down Pipe Temperature Drop
CEAF Type: Awareness Engine Family Affected: MXNA
C Air Compressor Up-fit and Plumbing Guide For LDI B3
Down Pipe Temperature Drop
FNAL Production Experience
Info. For CEAF Heated Breather Tube Change Engines: QSB4. 5/6
CEAF Type: Change Approval Request
Governor Pad Location Change on ISC/ISL HT Twin Cylinder WABCO Air Compressor Mahesh Koyyada on behalf of Kimberly Van Selow.
2016 PM sensor water shield addition in Horizontal Side-Out (ISB and ISX applications) and Vertical End-Out (ISB applications Only) SCR 11/30/2015.
L9 E6 OBD Phase C Product Update
Information To support CEAF Obsoleting Grid Heaters with Heater Control Modules for B Tier 1 and Tier 2 Options: AH9044, AH9083, AH9084, AH9122, & AH9128.
Removing the Backshell from Oil Pressure Sensor Connector Option Impacted: WR ,WR ,WR ,WR ,WR ,WR ,WR ,WR ,WR ,WR ,
Information to Support CEAF: ISL Euro3 WWCP V Software Update
Information to Support CEAF: New Software release for ISB and ISL Euro 4 and 5 Products Lisa Ferguson Cummins Confidential.
Affected Options: BR Option; EB Option; PH Option;
Low DEF Level Programmable Parameter Changes
Information To support CEAF Notification of proposal to modify the orientation of the , CLAMP, V BAND that is used in XS9693 on 6 cylinder automotive.
Information to support CEAF Notification of approval of new assembly line at the suppliers Chinese manufacturing location for the , COMPRESSOR,
Addition of MCRS low pressure fuel pump pressure relief valve for QSK38/50/60 Kelle Ravn May 20th 2015 (Changed “check valve” in May 18th version to “pressure.
Mounting Zone Edge and Profile Tolerance Change on EPA2017 Inlets
Sticker Label Location Change on UL2 Supply Module
EGTS CAL ID Update Cummins Confidential CEAF Type: Change Notification
VPCR OVERVIEW The banjo fitting, from Cummins ISL16 330, is not oriented to install the remote fuel filter. As shown in the picture #1(next slide), the.
Silex Digital Engineer Program Overview
SNS PPU Cryomodule Instrumentation
Bunker Wall Design Wall ESS
Heat Recovery Steam Generators
Boiler Safety Valve Regulations
SNS PPU Cryomodule Instrumentation
Automatic operation IR rework system Automatic Component placement 2 x K-type thermocouples IR-pyro sensor RPC-camera.
Presentation transcript:

2018 Natural Gas Beta to LP Changes CEAF Type: Change Notification Technical Configuration(s) Affected: D1H3001BX03, D883007BX03, D0L3002BX03 Engine Family Affected: B6.7N, L9N, ISX12N Market(s) Impacted: Automotive Anticipated Production Date: LP Option(s) Affected: PE9651

Summary of Changes No. Change OEM Impact Affected Part Numbers 1 Remove EXP-PST-1 and MANF-6 specs callout from outline drawings None expected ALL 2 Nomenclature revisions in Outline Prints 3 Heat shield rib addition L9N TLAs 4 Lift Hook weld length from 50mm to 30mm 5 Weld Location change between heat shield and outer body to the outlet 6 Remove lip feature from the heatshield at inlet Select TLAs (see slide 8) 7 Temperature connector color will be etched on the Heat Shield

1. Remove EXP-PST-1 and MANF-6 specs callout from outline drawings Affected Part Numbers: All TLAs Reason for Change: Print correction Anticipated OEM Impact: None Cummins Restricted

2. Nomenclature revisions in Outline Prints Affected Part Numbers: All TLAs Reason for Change: Print correction Anticipated OEM Impact: None Corrections will be made for all three engine platforms (B6.7N, L9N and ISX12N 2018 L9N Cummins Restricted

3. Rib added at the middle portion of Upper and Lower Heat Shield for all L9N TLA prints Affected Part Numbers: All L9N TLAs Reason for Change: Strengthen heat shield Anticipated OEM Impact: None Inlet Rib added to the middle portion of both Upper and Lower Heat Shields used on all P-Phase L9N TLA systems. Cummins Restricted

4. Lift Hook weld length from 50mm to min 30mm Affected Part Numbers: All TLAs Reason for Change: Commonization of manufacturing processes Anticipated OEM Impact: None Min 30mm Cummins Restricted

5. Weld Location change between heat shield and outer body to the outlet end of aftertreatment. Affected Part Numbers: All TLAs Reason for Change: Increase inlet mounting zone Anticipated OEM Impact: None Exhaust Gas Inlet Weld will be moved to this location. Cummins Restricted

6. Remove lip feature from the heatshield at inlet. Affected Part Numbers: Select TLAs Reason for Change: Feature previously assisted in ensuring mounting straps did not overlap top of welds. Due to weld location change (see Change 5), this feature no longer serves that purpose. The heatshield now acts as the locating feature and the mounting zone has increased. Anticipated OEM Impact: None Exhaust Gas Inlet Cummins Restricted

7. Temperature connector color will be etched on the Heat Shield at below mentioned location. Color combinations for connectors for different platforms are as mentioned in below table. Example ISL system image Affected Part Numbers: All TLAs Reason for Change: Ensure correct temp sensors are installed during assembly and service events Anticipated OEM Impact: None Exhaust Gas Inlet Brown Black Description Mid Bed Temp Connector color Outlet Temp Connector color L9N Canary Key C: Brown Key A: Black ISX12N Canary Key B: Light Grey B6.7N Canary Cummins Restricted