Cesium Telluride Photocathode Preparation at Argonne

Slides:



Advertisements
Similar presentations
High Brightness Electron Source Lab.
Advertisements

High Gradients in Dielectric Loaded Wakefield Structures Manoel Conde High Energy Physics Division Argonne National Laboratory AAC 08 – Santa Cruz, CA.
Planning the AWA run schedule 1.Do experiments as quickly as possible 2.Deliver meaningful results Goals of this discussion (planning) (priorities) Improve.
GaAs and CsKSb Photocathodes for DC Gun
Beam current4 A Beam pulse length1.5 ms Power input/structure 35 MW Ohmic losses (beam on)1.6 MW RF power to load (beam on) 0.4 MW RF-to-beam efficiency.
Rong Xiang I I Photocathodes for Rossendorf SRF gun Rong Xiang for HZDR SRF-gun team 1 st Topical Workshop on laser based particle.
D.H. Dowell/MIT Talk, May 31, David H. Dowell Stanford Linear Accelerator Center Photocathode RF Guns and Bunch Compressors for High-Duty Factor.
7.8GHz Dielectric Loaded High Power Generation And Extraction F. Gao, M. E. Conde, W. Gai, C. Jing, R. Konecny, W. Liu, J. G. Power, T. Wong and Z. Yusof.
Advanced Accelerator R&D: Flat Beam Transform & Emittance Exchange Kwang-Je Kim ANL & U of C June 27, 2008 ANL-UChicago-FNAL Collaboration Meeting at Fermilab.
Introduction Current and proposed linear colliders, energy recovery linacs and light sources require high quality electron sources. In particular, low-emittance.
Low Emittance RF Gun Developments for PAL-XFEL
Development of Dielectric PETS Chunguang Jing and Wei Gai ANL and Euclid CLIC workshop 2013.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Recent Euclid Wakefield AWA C. Jing, S. Antipov, A. Kanareykin, P. Schoessow, Euclid Techlabs, LLC M. Conde, W. Gai, W. Liu, J. Power, Z.
Field enhancement coefficient  determination methods: dark current and Schottky enabled photo-emissions Wei Gai ANL CERN RF Breakdown Meeting May 6, 2010.
Status of the Photocathode R&D for ATF RFgun N.Terunuma (KEK)
Development of a Compact Dielectric-Loaded Test Accelerator at 11.4 GHz* S.H. Gold, a) A.K. Kinkead, b) W. Gai, c) J.G. Power, c) R. Konecny, c) C. Jing,
G5 Design Review, April 24, 2009 Gun to 5cell Cavity Test: Overview Dmitry Kayran G5 test Design Review April,
Laboratoire de Chimie-Physique CNRS – Université Paris-Sud UMR ORSAY Cs 2 Te photocathodes at ELYSE.
LDRD: Magnetized Source JLEIC Meeting November 20, 2015 Riad Suleiman and Matt Poelker.
ICFA Workshop on Novel Concepts for Linear Accelerators and Colliders. SLAC, July Euclid Techlabs LLC DIELECTRIC BASED HG STRUCTURES: POWER EXTRACTION,
The Upgraded Argonne Wakefield Accelerator Facility (AWA)
Awake electron beam requirements ParameterBaseline Phase 2Range to check Beam Energy16 MeV MeV Energy spread (  ) 0.5 %< 0.5 % ? Bunch Length (
Beam plan at STF phase1 12/6/2005 TTC-WG3 H. Hayano STF phase1 1st step : DC-gun + photo-cathode (2006) quick beam source( DC gun exist), no pre-acceleration,
European Advanced Accelerator Concepts Workshop, Elba, September 14 th -18 th, 2015Steffen Döbert, BE-RF Electron accelerator for the AWAKE experiment.
Advanced Accelerator R & D Activities at ANL-HEP Wei Gai (for the AWA group)
Paolo Michelato, Workshop on High QE Photocathodes, INFN-Milano LASA, 4 – 6 October Photocathodes: Present status and future perspectives Paolo Michelato.
Feasibility and R&D Needed For A TeV Class HEP e+e- Collider Based on AWA Technology Chunguang Jing for Accelerator R&D Group, HEP Division, ANL Aug
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Photo injector dark current at FLASH and efforts for reduction at FLASH and XFEL Svem Lederer Unwanted Beam Workshop 2012 Berlin, Dec 18, 2012.
Bunch Shaping for Future Dielectric Wakefield Accelerators W. Gai Mini-Workshop on Deflecting/Crabbing RF Cavity Research and application in Accelerators.
Development of High Brightness Electron Photoinjectors at ASTeC B.L. Militsyn Accelerator Science and Technology Centre Science & Technology Facility Council,
AWA Overview and Activities Dan Wang for Wei Gai ANL HEP AWA CLIC workshop 2016.
ASTA Latest Update E. Harms April Photoelectrons first produced at ASTA on 20 June 2013 –Molybdenum (uncoated) cathode ‘Routine’ Electron operation.
Jun Feng Advanced Light Source Lawrence Berkeley National Laboratory
Phil Oxford , june 18 Photoinjector at.
JLEIC R&D weekly meeting, Thursday Jan 26, JLab.
Sara Thorin, MAX IV Laboratory
UK-XFEL WP1 – Electron Injector Development
Plans of XFELO in Future ERL Facilities
APEX at LBNL as a Photocathode Test Facility
Status of the CLIC main beam injectors
Operation of the High-Charge PHIN RF Photoinjector with Cs3Sb Cathodes
Have a chance to operate your own beam at CERN
Accelerators in a new light
Brief Review of Microwave Dielectric Accelerators
Tunable Electron Bunch Train Generation at Tsinghua University
Perspectives of SRF gun development for BERLinPro T. Kamps (HZB)
Magnetized Bunched Electron Beam from DC High Voltage Photogun
CLIC source update CLIC main beam injectors reminder
LCLS Commissioning Parameters
LCLS Commissioning Parameters
Magnetized Electron Beam for Ion Cooling at JLEIC
Electron Source Configuration
R. Suleiman and M. Poelker October 12, 2018
LCLS Commissioning Parameters
Status of Cathode System in FZR
Advanced Research Electron Accelerator Laboratory
High brightness electron sources, e-beam qualities and diagnostics
INJECTOR (WBS 1.2.1) Jym Clendenin, SLAC April 23, 2002
CLIC Feasibility Demonstration at CTF3
Injector Experimental Results John Schmerge, SSRL/SLAC April 24, 2002
High Charge Low Emittance RF Gun for SuperKEKB
Operational Experience with LCLS RF systems
LCLS Commissioning Parameters
Proposal for Smith-Purcell radiation experiment at SPARC_LAB
DC Photocathode Gun (JLAB)
BNL Photocathode R&D An overview of research on high quantum efficiency photocathodes and associated laser systems Andrew Burrill HPHB Workshop Nov 9,
SuperKEKB required (e+ / e-)
Presentation transcript:

Cesium Telluride Photocathode Preparation at Argonne High QE Photocathodes for RF Guns Workshop Manoel Conde

Staff: Personnel Argonne Wakefield Accelerator Group Sergey Antipov Wei Gai Manoel Conde Felipe Franchini Chinguang Jing Richard Konecny Wanming Liu John Power Zikri Yusof Students & Visitors: Sergey Antipov Feng Gao Haitao Wang Jidong Long

Research at the Argonne Wakefield Accelerator Facility (AWA) High Power Electron Beam (~ GW) Technologies Operating a unique facility to study high current electron beam generation and propagation for efficient beam driven schemes. Advanced Accelerating Structures Current effort has lead to comprehensive knowledge on construction and testing of dielectric based accelerating structures. Fundamental beam physics and advanced diagnostics High brightness beam generation and propagation, and development of novel beam diagnostics. Brief history: The AWA Facility successfully demonstrated collinear wakefield acceleration and two-beam-acceleration in dielectric loaded structures. The initial accelerating gradients were limited to modest values (< 15 MV/m) due to the quality of the drive electron beam. The upgraded drive gun has led to increasingly higher gradients, recently reaching 86 MV/m.

AWA Drive Beamline 4.5 m Wakefield Structure Linac & Steering Coils Drive Gun Linac & Steering Coils Quads Wakefield Structure Experimental Chambers 4.5 m GV YAG1 YAG2 Spectrometer YAG5 Dump/ Faraday Cup Slits YAG4 YAG3 ICT1 ICT2 BPM Single bunch operation Q = 1-100 nC Energy = 14 MeV High Current = 10 kAmp Bunch train operation 4 bunches x 10 nC 32 bunches x 50 nC (future?!)

AWA Electron Beam Drive Gun 1 ½ cell, L-band (1.3 GHz) 12 MW yielding 80 MV/m on cathode 8 MeV electron bunches with 1 -100 nC bunch length < 13 ps FWHM (with 35 nC) Emittance < 300 mm mrad (with 35 nC) Base pressure: 4x10-10 Torr Mg photocathode (Cs2Te cathode under development) Linac Structure Boosts energy to 14 MeV Large irises to minimize wakefields 100 nC at 8 MeV

AWA Sub-systems Laser System Spectra Physics Tsunami oscillator, Spitfire regenerative amplifier, and two Ti:Sapphire amplifiers (TSA 50): 1.5 mJ at 248 nm 8 ps FWHM If use Excimer amplifier: 15 mJ at 248 nm RF System Single klystron: 1.3 GHz, 24 MW, 8μs

Cesium Telluride Photocathode Fabrication Anode A + hn Cs2Te film Mo plug Evaporate Tellurium, followed by Cesium, onto the Molybdenum substrate. Use Hg arc lamp to generate photoelectrons.

Deposition Chamber SYSTEM TOP VIEW SYSTEM SIDE VIEW 7. Heater 8. Anode/shutter 9.Thickness monitor 10. Temperature sensor 13. Hg light source 6 Cathode loadlock Thermal evaporators 7 Cathode loadlock Thermal evaporators 7. Heater 9. Thickness monitor 10. Temperature sensor 13. Hg light source

Cs2Te Deposition 1. Starting base pressure ~ 5×10-10 Torr; 2. Heat Mo plug to 160-180 C; 3. Lower Mo plug temperature to 120 C. Pressure never goes beyond 10-10 Torr range; 4. Begin Te deposition. Pressure increases up to 3×10-8 Torr. Te deposition stops when thickness is ~10 nm (estimated using nearby thickness monitor); 5. Begin Cs deposition. DC current to Cs dispenser set to 6 A during deposition. 6. Photocurrent is monitored by applying +300VDC on an anode, and an Oriel 350 W Hg arc lamp source with a 250 nm filter. 7. Cs deposition is turned off once the photocurrent starts to level off. 8. Cathode is left at 120 C for another hour before heater is turned off.

Cs Deposition End Cs deposition Begin Cs deposition

Issues to be addressed: QE is lower than expected. 4 out of 5 deposition runs produce measured current that is dominated by Cs deposition source (Cs ions?) and not the photocurrent (block UV light and still measure current). Not repetitive. Need better vacuum?