IMPLEMENTING JOB OF BUILDING FINISHING Doing stone foundation Job By : SMK Negeri 5 Surakarta
GOALS OF LEARNING : Student can identify river stone foundation arrangement. Student can explain kinds of river stone foundation construction. Student can make arrangement profile of river Stone Foundation. Student can do river stone foundation arrangement. Teknologi dan Rekayasa
REQUIRES OF RIVER STONE FOUNDATION ARRANGEMENT Kind of Foundation determining is influenced by kinds of land. After Kinds of Foundation is determined so Before making calculation , we have to observe kinds of land. (Kind of Land, land supporting ,Land water condition) In digging the hole of foundation , It has to reach hard land. It is used split stone from mountain. Teknologi dan Rekayasa
INSTALLING FOUNDATION STAGE Prepare all material which is needed. Checking Foundation Profile according to the regulation in Picture. The height of foundation installing may not exceed 50 CM in every day. After finishing Foundation , the remeasuring the digging line has soonly carried out. Teknologi dan Rekayasa
INSTALLING PLAN OF PROFILE AND BOUPLANK
FOUNDATION ARRANGEMENT
FOUNDATION ARRANGEMENT