IMPLEMENTING JOB OF BUILDING FINISHING

Slides:



Advertisements
Similar presentations
PASSIVE COMPONENT COMPETENCE : IDENTIFICATION OF ELECTRONIC COMPONENT By. SETYO SMK MUH.3 YOGYA.
Advertisements

DIFFERENCE OF STUDIO MAKING OF MASTER AND RECORD Competency : Principle of master making.
KINDS AND LOCATION OF MICROPHONE Competency : Principle of master making.
THE PARTS AND FUNCTIONS OF PLAY STASION Competency : Installing of video game.
MAINTENENCE AND REPAIR OF DVD PLAYER Competency : Improve signal reproduction means of audio video CD.
INSTALATION OF DVD PLAYER Competency : Improve signal reproduction means of audio video CD.
8cm 5cm Area = 8 x 5 = 40cm 2 A parallelogram can be split up into a rectangle and 2 triangles – each with the same area. 10cm 5cm.
DISCRIBTION OF SAFETY AND HEALTH WORK Competency : APPLYING OF SAFETY AND HEALTH WORK.
DUPLICATION PROCESS Competency : Making audio record in studio.
Technological And Engineering EXPLAINS ERECTION PROCEDURE OF TIMBER BENCH AND RAILING TIMBER.
Arranging Bugdget Plan of Construction Cost (RAB) Calculating construction RAB of House Building, water building and Bridge By: SMK NEGERI 5 SURAKARTA.
Technology And Engineering Expertise Interest Chemical analysis.
Make door frame, doors and windows Explain the procedure door frame assembly, doors and windows Technology and Engineering Technical Timber Construction.
Dasar Listrik Installing a simple home. Teknologi dan Rekayasa Switch  Connection single switch is a series of single switch that function to set and.
IMPLEMENTING CONTRUCTION MEASURING
DETERMINE PROCEDUREAND REPAIR PRISE CALCULATE REPAIR PRISE
APPLYING THE BASICS OF PICTURE TECHNIQUE
Technology And Engineering
BASIC VOCATIONAL MATERIAL TESTING
Making picture of construction applying.
Competency: Repairing of CD Player
Contour Map Map that describes the part of the surface of the earth that is natural to use the contour lines 
CALCULATION NEEDS WORK CONSTRUCTION MATERIALS WOOD
Preparation of Chemical Compound in Laboratory Scale
Technology and Engineering
Identify House Building Science
IMPLEMENTING JOB OF SCAFOLDING
IDENTIFYING BUILDING CONSTRUCTION
IMPLEMENTING SCAFFOLDING JOB
DOING VIDEO SIGNAL TESTING
TECHNOLOGY AND ENGINERRING
Technology And Engineering
Identifying House Building Science
Teknologi Dan Rekayasa
Making Picture of construction Application
Install Glass in frame / door / wood window
PLAN WOOD CONSTRUCTION JOB
Competency: Installation Sound System
Using Hand Tools and Electric on Stone and Concrete Construction
Implementing Finishing Job of Building
Applying of Work Health and Work save
Identify the science building
HEATING APPARATUS SMK Negeri 13 Bandung.
Understanding Material of Building
EXPLAINING PICTURE FORMATION SYSTEM
ENGINEERING PLUMBING AND SANITATION
Technology And Engineering
Technology And Engineering
LATHE MACHINE OPERATIONAL 1. Installing live centre in tail stock
IMPLEMENTING PRE MOULDED CONCRETE JOB
Teknologi Dan Rekayasa
Gravimetric Analysis SMK Negeri 13 Bandung.
Applying Statistic Science And Tension
TECHNOLOGY AND ENGINERRING
BASIC VOCATIONAL MACHINING TYPE MACHINERY : LATHE MACHINE MILL MACHINE
Identifying House Building science
Applying the basics of technical drawing
Glassware and Ceramic Store Technique
BURNER SMK Negeri 13 Bandung.
Making Picture of Construction Application
Teknologi Dan Rekayasa
Applying Building Material Checking
Install wooden scaffolding
Technology And Engineering
Arranging Budget Plan of Construction Cost (RAB)
Arranging Budget Planning of construction cost (RAB)
Teknologi dan Rekayasa
REPAIRING GLASS VEHICLE
Teknologi dan Rekayasa
Looking at Earth.
Presentation transcript:

IMPLEMENTING JOB OF BUILDING FINISHING Doing stone foundation Job By : SMK Negeri 5 Surakarta

GOALS OF LEARNING : Student can identify river stone foundation arrangement. Student can explain kinds of river stone foundation construction. Student can make arrangement profile of river Stone Foundation. Student can do river stone foundation arrangement. Teknologi dan Rekayasa

REQUIRES OF RIVER STONE FOUNDATION ARRANGEMENT Kind of Foundation determining is influenced by kinds of land. After Kinds of Foundation is determined so Before making calculation , we have to observe kinds of land. (Kind of Land, land supporting ,Land water condition) In digging the hole of foundation , It has to reach hard land. It is used split stone from mountain. Teknologi dan Rekayasa

INSTALLING FOUNDATION STAGE Prepare all material which is needed. Checking Foundation Profile according to the regulation in Picture. The height of foundation installing may not exceed 50 CM in every day. After finishing Foundation , the remeasuring the digging line has soonly carried out. Teknologi dan Rekayasa

INSTALLING PLAN OF PROFILE AND BOUPLANK

FOUNDATION ARRANGEMENT

FOUNDATION ARRANGEMENT