SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04

Slides:



Advertisements
Similar presentations
Henrik Loos LCLS FAC Meeting 27 October RF Gun Status LCLS Facility Advisory Committee Meeting October 26, 2005 Mechanical.
Advertisements

FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
New 135-MeV injector energy requires minor changes to linac operating point…
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
V.N. Litvinenko, ElC Collaboration Meeting, Hampton University, May, 2008 Staging of eRHIC Increased Reach in c.m. Energy and Luminosity Vladimir.
LCLS Undulator Systems TDR Charge Linac Coherent Light Source Stanford Linear Accelerator Center Technical Review, March 3, 2004.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Contributions to ELI-NP on RF accelerator activities Andrea Mostacci Università di Roma, Sapienza The joint Sapienza/INFN-LNF group is active in the field.
Low Emittance RF Gun Developments for PAL-XFEL
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
6-10 Nov. 06 ILCWS Valencia Global Design Effort 1 RDR Management Board Overview K. Yokoya KEK.
January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 1 Update to FARDOG: Technical Division Xband Activities Fermilab NLC Activities.
Free Electron Laser Projects X-FEL and the others S. Bertolucci INFN.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Max Cornacchia, Paul Emma Stanford Linear Accelerator Center Max Cornacchia, Paul Emma Stanford Linear Accelerator Center  Proposed by M. Cornacchia (Nov.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
Budget, Installation plan, Resource Organizational Structure & New Law for Research Centers Avni AKSOY 7th IMAC Meeting of TARLA, IAT, 7 September 2015.
NuPECC Meeting March 09-10, 2012 Milano Achim Richter, ECT* and TUD Director’s Report
1 CTF3 collaboration meeting Jan 2008 G.Geschonke Status of CTF3 G.Geschonke CERN.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
김 귀년 CHEP, KNU Accelerator Activities in Korea for ILC.
1/26 WSHQE–October 4-6, 2006 L. Monaco INFN Milano – LASA Photocathode FLASH: Quantum Efficiency (QE) L. Monaco Work supported by the European.
Universities meet Laboratories: situation in Italy M. Migliorati.
From SPARC to SPARX Luigi Palumbo SPARC Review Committee, January 9, 2008.
Main Technical Issues of theSuper B Injector Main Technical Issues of the Super B Injector SuperB Meeting, Isola d’Elba, May 31st – June 3rd, 2008 D. Alesini,
WP9 updated Upgrade of SPARC test facility for high gradient acceleration of electron beams for SuperB collider and FEL projects WP number9Start month1End.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
Accelerator Division Activities
WP9-SuperB in TIARA M. Biagini, INFN-LNF.
Brief Status SPS Prototype PSB Prototype Installed in LS1
Status of the MAX IV Short Pulse Facility
Dipole status & update DISCO_RAP (NTA)
by P. Musumeci and F.Tazzioli
(Potential) Site and Utilities
SuperB Injection, RF stations, Vibration and Operations
4th FRC meeting, Antti Onnela, CERN-PH-DT
10 Years Gentner Programme
SPARC RF gun status by P. Musumeci Review committee
WP 9: Beam-driven plasma acc.
TIARA WP8 Status M. Biagini, INFN-LNF, for WP8 TIARA Mid-Term Meeting
Installation status and planning
Michael Sullivan and John Seeman SLAC National Accelerator Laboratory
Mission reimbursement rule
Injector Performance Requirements Conventional Facilities Update
PCC Update 04/22/09 Planning Phase
Summary of the 2011 EuroFEL Cathode Workshop David H
Beam Dynamics in a Spilt SRF-Gun
Electron Source Configuration
LAL meeting on e+ studies, Oct. 2010
PCC Update 10/28/09 Planning Phase
View from Lab Management HPS Collaboration Meeting
Laser assisted emittance exchange to reduce the X-ray FEL size
Report on HIE-ISOLDE Status
Advanced Research Electron Accelerator Laboratory
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Linac/BC1 Commissioning P
LCLS FEL Parameters Heinz-Dieter Nuhn, SLAC / SSRL April 23, 2002
2008 S P A R C e-beam meas. A. Cianchi e-beam sim. C. Ronsivalle
LCLS Injector System Overview D. H
J. Seeman Perugia Super-B Meeting June 2009
DC Photocathode Gun (JLAB)
The Laboratori Nazionali di Frascati of the
SuperKEKB required (e+ / e-)
Marcello A. Giorgi Università di Pisa & INFN Pisa
General Overview of WP 12 ESS Vacuum System
Presentation transcript:

SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04 SPARC BUDGET 2004/2005 L. Palumbo SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04

SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04 Total cost: 5.100 k€ (1st Review Committee April 2003)   2003 2004 Total Laser 750.000 270.000 1.020.000  RF Gun 250.000 250.000  Linac 2.100.000 507.000 2.607.000  Magnets 320.000 63.000  383.000  Vacuum 65.000 150.000 215.000  Diagn. e Contr. 145.000 480.000 625.000  Total 3.630.000 1.470.000 5.100.000 Excluding RF deflector and by-pass !!! SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04

SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04 1st Review Committee, April 2003 MIUR ACCELERATOR 3.057 k€ INFN 2.819 k€ ST 132 k€ Un. TV 96 k€ 2.525 k€ hardware 294 k€ contracts 98 k€ hardware . 34 k€ group supp. ENEA 10 k€ Contracts and group support group support MIUR Funding approved: INFN Funding for Injector: € 2.477.000   year 2003, € 1.105.000 year 2004, € 1.372.000 SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04

SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04 Funding 2003 OK SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04

SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04

SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04 Funding 2004   Miss. Int. Miss. Est. Consumo Inventar. Apparato Totale LNF 19 55 50 27 759 910 Mi 17 11 30 69 Roma1 3,5 1,5 8,5 Roma2 1 4,5 7 Salerno 2,5 2 5,5 43 76 65 57 1000 Missing 623 kEuro for apparatus in the budget 2004 !! SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04

SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04 Furthermore, we need: 300 kE for the by-pass 40 kE for completion of the RF Deflector 3) Travel and consumable since July 2004 SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04

SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04 23,65 FTE Request 2005: SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04

SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04 LNF, 4.7 FTE (R) + 8.9 FTE (T) = 14.6 FTE SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04

SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04 100 SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04

SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04 Milano 2.85 FTE SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04

SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04 ROMA1, 2.2 FTE (R) + 1.0 FTE (T) = 3.2 FTE SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04

SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04 ROMA2 , 3.0 FTE SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04

SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04 Salerno, 1.0 FTE No significant contribution so far from the Salerno group SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04

SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04 The Lecce group needs the following financial support: 1) Travels: 5,000 Euros per year: conferences, exchange visits. 2) 15,000 Euros per year for consumables: laser gases, o-rings, targets, substrates, heating belts; 3) Durable equipments: ionic pump 150 l/s (5,500 Euros) and a linear gate valve (3,000 Euros); SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04

SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04 COMMENTS - Uncertainty of INFN funding for 2004. - Full funding of the project necessary in 2005 - Urges that RC reports INFN board about the SPARC status and financial needs. SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04

Collaborations and UE programs MOU DESY BNL UE PITZ SPARC UCLA MOU UE EUROFEL MOU SLAC SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04

EUROFEL Collaboration SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04

SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04 Status : Negotiation - 2005-2008 SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04

SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04

SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04 MIUR approval of funding in June 2004 First year 1/3 of the budget , 3.3 MEur SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04

Sparc Injector + Dafne Linac for a 10 nm SASE FEL source at LNF SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04

SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04 E [GeV] 1 Dg/g [%] 0.1 I [kA] 2 lu [cm] 3   K 1.762 Gap [mm] 11 SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04

SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04 CONCLUSIONS - The SPARC project is entering, on schedule, the installation phase. - Collaboration with UE and USA major laboratories/Univ. - Access to UE research funding programs. - Perspectives of a further development with SPARX SPARC Review Committee L. Palumbo -RomaTV-Oct.04.04