Proposed Design Improvements

Slides:



Advertisements
Similar presentations
Project State Road 434 Outfall Ditch to the Little Wekiva River
Advertisements

Hickory Hills Lake Management Committee Erosion Control sub committee Tom BertramJane Blake.
Report #5 Brief Description A laborer was steam cleaning a scraper. The bowl apron had been left in the raised position. The hydraulically controlled apron.
Trenching and Excavating Safety. Asphyxiation Each time a breath is exhaled the weight of the load restricts inhalation of the next breath. Slow suffocation.
Grade Control Structures Chris Shrimpton and Jonathan McIntosh CIVE 717 River Mechanics Spring 2012.
Example 2 Height of a Ball Chapter 3.2 The height above ground of a ball thrown at 64 feet per second from the top of an 80- foot-high building is modeled.
Village of Alden Stormwater Pictorial view. Here is a view of rainfall and notice how the water carry’s away from the center of the road to the sides.
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
New Orleans’ Levee Failures Chalston Layacan Elizabeth Lenker Jamie Mellies.
A surveyor is measuring the distance across a small lake
Chapter 33 Foundation Systems.
Foundation Systems.
Right Triangle Trigonometry
Fence Example 5-wire barbed. Storing posts before use If posts are left lying on the ground they are prone to rot and insect damage.
Capstone Project Fremont Lake Shore Line Distress Mitigation Bluemont Lakes Fargo, ND.
FOOTINGS.
Chapter 18 Foundations.
Erosion Control/Damage Topic H. Erosion & Sentiment Control Defined by: – Environmental Regulations – State and federal laws – Standard specifications,
COASTAL DEFENCES. There are many techniques used for reducing the power of waves before they erode a coastline. The photos illustrate some methods used.
Two people are looking up at a skyscraper Two people are looking up at a skyscraper. The people are 5 miles apart, and the skyscraper is between.
Rock Chute Mike Cox State Conservation Engineer Contractor Certification Training March 2008.
11 Photos in this presentation are from the OSHA Region 4 National Photo Archive and OSHA Region 5. Is This a Fall Hazard?
PROPOSED EAGLE PROJECT BY TYLER BOOTH Installation of Raised Garden Beds At Timberlane Regional High School 1.
 The aim is to protect the coastline by preventing the waves eroding the coastline.
Copyright © 2011 Pearson Education, Inc. Publishing as Prentice Hall.
First two slides (3 & 4) together make a tool box talk. Simply print both on one page as a 2 slide set. See direction slide #2. Slides 5 & 6 are examples.
AT-GRADE, HINGED, & UNDERGROUND GRADE CONTROL. AT-GRADE & HINGED GRADE CONTROL STRUCTURE ON HICKAHALLA CREEK NEAR SENATOBIA, MS. Constructed in 1989 to.
Landfill Installation Considerations – Solar PV By: Gary Garfield, PE, LSP URS Corporation Salem, New Hampshire Renewable Closed Landfills.
1 FRENCH RED CROSS in Grenada CONSTRUCTION OF WOODEN HOUSES ACCORDING TO STANDARDS Tel: / Sugar Mill, St George’s.
SUB MAR West Fork of Beaver River West Point, OH. Pre-project pictures. Note eroding outer bank.
8-4 Angles of Elevation and Depression
4.2 Solving Inequalities Using Addition and Subtraction.
The Schoharie Creek Thruway bridge collapse Group 18 Karen McMorrow David O’Brien Clare Whitely.
On a 50-foot roll of cable, 15 ft are left. How many feet of cable were used? Adding and Subtracting Rational Numbers COURSE 3 LESSON Let t =
From US 17 to SR 11 and SR 11 to Cone Road FPID No October 25, 2011.
CE 3372 Water Systems Design
Palo Duro Canyon.  Located just outside of Amarillo, Palo Duro Canyon is often called the Grand Canyon of Texas and is the second largest canyon in the.
 Prepared by  Prepared for  City of Palm Coast, Florida  August 30, 2011  Drainage Study Sections 31 & 35/37 for Development of City Wide Stormwater.
Trig Test Review 2. 45°-45°-90° 30°-60°-90°
Right Triangle Trigonometry
EXAMPLE 2 Graphing Using Slope-Intercept Form The y -intercept is 3, so plot the point (0, 3).STEP 1 The slope is, so plot a second point by 1 2 STEP 2.
Natural Features of Continents Landforms click to continue.
What will be done I will be installing an area for a kindergarten playground. Next year the school is moving to full day kindergarten and a playground.
Line of Sight Horizontal An angle formed by a horizontal line and the line of sight to an object above the level of the horizontal. X°
FOUNDATIONS.
Holt Algebra Adding and Subtracting Real Numbers 1-2 Adding and Subtracting Real Numbers Holt Algebra 1 Warm Up Warm Up Lesson Presentation Lesson.
Reed Contracting Concrete Plant (ALG active) November 8, 2012 Madison County Karl M. Ryan, inspector 1.
1.A slide 5.2 meters long makes a 40 o angle with the ground. How high is the top of the slide above the ground? 2. 3.
Riprap Installation Construction Inspection for Field Office Activities Will use Riprap Gradation and Riprap Subgrade Problems from Class Problem Section.
Basis of Design Overview Foster City Levee Improvements CIP Presentation to Council October 17, 2016.
Trig Review.
Potential Pollutants Sediment Chemical N, P, Pesticides, Oil & Grease
Right Triangle Trig.
Profile Leveling.
Homework # 6 – Word Problems
(4.2ish miles south-east)
Angles of Elevation and Depression
INDOOR BASEBALL / SOFTBALL FACILITY
Review Homework.
Warm Up Find the missing side length. Find the missing angle °
Purpose 1-2 Add real numbers. Subtract real numbers.
Landfill Wernsdorf, construction areas 3 and 4
Before Pictured is a natural log jam, at the start of the project. Depth of water is about one foot. Boulders to the left will be placed in the created.
Slope  4 Ways: Graph Formula Ordered Pairs Table.
Scale differs from above
ALDRC HEAD GATE FINISHED VIEW
Missouri Stringless Paving: I-35 Unbonded Concrete Overlay
Angles of Elevation and Depression
support a power pole that is 15 meters
BUILDING CONSTRUCTION Foundation
Presentation transcript:

Proposed Design Improvements Articulating Block Articulating Block Existing Ground Line Bank and shore riprap material will be used for added erosion control protection. Geotextile material will be installed to strengthen ditch slopes. Sheet pilings will only be installed within the 40-foot wide ditch right-of-way at the locations were the existing drainage structures are currently found. The tops of the sheet pile will be capped and will follow the existing ground elevations closely. They will be embedded into the ground approximately 30-35 feet deep and 2-4 feet will be left exposed above ground. 2’ Steel Sheet Piling Geotextile SR 434 Outfall Ditch FPID No. 423513-1-52-01