LHC-TS3 Coordination meeting #3

Slides:



Advertisements
Similar presentations
MEF - Machines & Experimental Facilities Technical Stop #4 29 th August - 2 nd September 2011 Summary Julie Coupard Schedule and Coordination LHC-TS4 -
Advertisements

CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
LHC machine Schedule, coordination & WAT K. Foraz March 22 nd, 2011 IMWG - LHC machine1.
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
7/23/ J.Coupard. 1) Cryogenic risks 2) Cryogenic phases from RT/floating to nominal and additional safety rules A. Sectors warmed-up to RT or considered.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
For more info:
First results from the study of the LHC cycle power consumption FCC I&O meeting 24 th June 2015 Davide Bozzini With the contribution of G. Burdet, B. Mouche,
LHC-YETS Coordination meeting #9 24 th November, 2015.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]
LHC status Monday 22 nd June 2015 Coordination: Wolfgang Hofle, Mike Lamont.
Latest on the Schedule K. Foraz LMC October 7th, 2009 Wednesday, Oct. 7th 2009K. Foraz - LMC.
Work Organisation for Splice Consolidation Francesco Bertinelli 20 minutes presentation, 10 minutes discussion: 12 slides First LHC Splice Review, CERN,
Overview of the LHC Year End Technical Stop
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
Activities related to BE-BI during LHC-YETS 7 th December, 2015 Maria Barberan, Marzia Bernardini.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
L. Tavian, TE/CRG, LSC Page 2 February 21 th, 2014 LS1 Committee (LSC) L. Tavian TE-CRG.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
LHC intervention scheduling with the Work Acceptance Tool
YETS & LS2 Works EN-EL / Power distribution
ALICE 5 o’clock meeting Wk 51.
East Area Renovation Project Team meeting # 2 – EDMS News
Framework Schedule from EYETS 2016 to LS2
SPS Winter stop Planning meeting (N06) 05/01/2011
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
EYETS Works EN-EL [ FC excluded ]
YETS & LS2 Works EN-El on LHC / Power distribution
Status of LHC installation & New Installation Schedule
Injector De-cabling Project
LHC-EYETS 2016/17 Coordination meeting #18
SHORT LHC-TS Coordination meeting #1
Julie Coupard Schedule and Coordination
Keeping LHC cold during LS periods Preliminary proposal
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
CRG activities for EYETS 2016
Short LHC-TS week 38 Confirmed by LMC on 16th August
Cryogenic Risk Assessment in LHC
Powering from short circuit tests up to nominal
LHCb & EYETS
YETS & LS2 Works EN-EL / Power distribution
Overview & baseline of LS2 and roadmap for CRG
TE-MSC activities in SPS during YETS
K. Foraz on behalf of OSS members
Monday 11/07: Recovery Plenty of accesses.
Sprint 5 Schedule (15 – 2 days)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Technical Stop #4 29th August - 2nd September 2011
KS4 PPE Timetable – Week Beginning 30th October 2017
Assumption for a given sector
Technical Stop #4 29th August - 2nd September 2011
American History Unit: 1950s to Present Topic: Review
Extended Christmas Hours Thursday December 8th 9am -6:30pm Friday December 9th 9am -6:30pm Saturday December 10th 9am-6pm Thursday December.
Brief report of the hardware commissioning activities
My School Days The first day back is Wednesday.
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
Contact
The Boy in the Striped pajamas gr. 02
Technical Stop #4 29th August - 2nd September 2011
2011年 5月 2011年 6月 2011年 7月 2011年 8月 Sunday Monday Tuesday Wednesday
Guidelines defined early Dec 2012
Week 43 ( LHC only) Installation of BLECF in LSS 4L and LSS 4R (Adrien and Mounir) - Done Check and repairs of BLECF in LSS 4L and LSS 4R (Steve) -? Installation.
Powering and Safety day Underground access during powering tests
Open Bowling Times 9:30 pm – 12 Midnight Moonrock
Specials Calendar Time Day 1 Day 2 Day 3 Day 4 Day 5 Day 6
LHC coordination meeting 12th December 2017
Presentation transcript:

LHC-TS3 Coordination meeting #3 27th October, 2016 AGENDA LHC-TS3 preparation – Marzia Bernardini AOB

Intervention on 400 kV substation in Bois-Tollot LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

Intervention on 400 kV substation in Bois-Tollot LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

Intervention on 400 kV substation in Bois-Tollot LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

Impact of the 400 kV intervention 6h electrical cut LHC Machine network General services ON No operation in Injectors and Experimental Areas NO ACCESS in all LHC  2nd November No ventilation conditions Lost of Cryo conditions ElQA 13 kA test in 6 sectors (23, 34, 45, 56, 67, 78 & 81) ElQA DSLC test in LSS3R All the LSS empty (Inner triplets, DFBs, SAM) LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

Options concerning the TS3 OPTION 1  Obsolete  no intervention on 400 kV OPTION 2 2.a Intervention on Monday 31st  Obsolete 2.b Intervention on Wednesday 2nd November  ACTUAL Intervention on 400 kV network. Power cut ~6h Temperature at the bottom of the DFBAs HCM> 100 K, and DSLC T>100K ELQA needed on all Sectors (except S. 1-2) OPTION 3  Potential Intervention on 400 kV network, with reduced duration of the power cut Temperature at the bottom of the DFBAs HCM< 100 K, and DSLC T<100K  ELQA not needed M. Bernardini - LMC 26th October 2016

M. Bernardini - LMC 26th October 2016 LMC 31st August “Conclusions of the task force setup to recommend the best procedures for ELQA testing after temperature excursions above 80 K in DFBs & DSLs” , A. Perin. M. Bernardini - LMC 26th October 2016

M. Bernardini - LMC 26th October 2016 Option 2b - ACTUAL 400kV power cut on Wednesday 2nd November duration >6h Temperature at the bottom of the DFBAs HCM> 100 K, and DSLC T>100K ELQA needed on all Sectors (except S. 1-2) Empty the LSSs, DFBs, SAM and Inner Triplets of Lhe (Monday 31st) Reduce the consumptions on the machine network Electrical power cut of 400 kV from RTE Wednesday ~ 6h NO ACCESS on the whole LHC Recovery of cryogenics conditions, progressively, from Friday midday on ELQA tests on 13kA and DSLC circuits  4 days Duration from Monday 31st October to Tuesday 8th November, afternoon M. Bernardini - LMC 26th October 2016

M. Bernardini - LMC 26th October 2016 Option 2b  ACTUAL ELQA ELQA ELQA ELQA ELQA ELQA ELQA M. Bernardini - LMC 26th October 2016 ELQA

DFBAs temperature vs time M. Bernardini - LMC 26th October 2016

M. Bernardini - LMC 26th October 2016 Option 3 - Potential 400kV power cut on Wednesday 2nd November Temperature at the bottom of the DFBAs HCM< 100 K, and DSLC T<100K Empty the LSSs, DFBs, SAM and Inner Triplets of Lhe (Monday 31st) Reduce the consumptions on the machine network Electrical power cut of 400 kV from RTE Wednesday – NO ACCESS on the whole LHC Recovery of cryogenics conditions, progressively, from Friday midday on No ELQA tests needed M. Bernardini - LMC 26th October 2016

M. Bernardini - LMC 26th October 2016 Option 3 - Potential RF RF M. Bernardini - LMC 26th October 2016

LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970 General reminders – TS3 All LOCK OUT requests via Impact LHC- TS3 activities:  from Monday 31st October @ 6am, to Friday 4th November @ 5pm  Exceptional activities as ELQA, lock/un-lockout, RF conditioning & CV maintenance can continue until the end of the technical stop The LHC machine will be in Automatic Restricted Mode Piquet’s phone number: 161669 from Monday 31st to Friday 4th INDICO: https://indico.cern.ch/category/8136/ (LHC-TS3) OSS website (planning, constraints…): https://espace.cern.ch/en-dep-mef-lpc/default.aspx LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

Radiological classification until end of 2016 1728265 permanent low-occupancy < 0.5 µSv/h < 2.5 µSv/h < 3 µSv/h < 15 µSv/h < 10 µSv/h < 50 µSv/h n/a < 2 mSv/h < 100 mSv/h > 100 mSv/h S. Roesler, LMC – 2016/10/5 LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

Access conditions related to Cryo LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970 Constraints LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970 Constraints LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

Personal ODH MANDATORY All points Personal ODH MANDATORY in the arc NO ACCESS Intervention 400kV LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

Personal ODH MANDATORY in the arc ZDC installation PM15 maintenance ZDC & LHCf installation LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

Personal ODH MANDATORY Arc12 – P18 – Ti2 Personal ODH MANDATORY in the arc Patrol PM18 Lift maintenance Patrol LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

Personal ODH MANDATORY in the arc PM25 Lift maintenance Patrol LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

Personal ODH MANDATORY Arc23 - P 3.2 Personal ODH MANDATORY in the arc Patrol PM32 Lift maintenance LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

Personal ODH MANDATORY P3 – Arc 34 Personal ODH MANDATORY in the arc PZ33 lift maintenance LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

Personal ODH MANDATORY in the arc PM/PZ45 Lift maintenance LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

Personal ODH MANDATORY Arc 45 – LSS5L Personal ODH MANDATORY in the arc Patrol ZDC + RPD installation LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

Personal ODH MANDATORY P5 – LSS5R Personal ODH MANDATORY in the arc Patrol PM56 lift maintenance ZDC installation LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

Personal ODH MANDATORY Arc56 - P6 Personal ODH MANDATORY in the arc Patrol PM/PZ65 Lift maintenance Powering Test s78 PHI Patrol LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

Personal ODH MANDATORY Arc67 - P7 Personal ODH MANDATORY in the arc Powering Test s78 PHII TBC PM76 maintenance LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

Personal ODH MANDATORY Arc78 Personal ODH MANDATORY in the arc Powering Test s78 PHII LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

Personal ODH MANDATORY in the arc Patrol PM85 Lift Maintenance Powering Test s78 PHII LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

Personal ODH MANDATORY Arc 81 – TI8 Personal ODH MANDATORY in the arc Patrol Powering Test s78 PHII LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970 IMPACTS: BE @ Wednesday 26th October @18h00 LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970 IMPACTS: HSE @ Wednesday 26th October @18h00 LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970 IMPACTS: EN-CV @ Wednesday 26th October @18h00 LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970 IMPACTS: EN-EL @ Wednesday 26th October @18h00 LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970 IMPACTS: EN @ Wednesday 26th October @18h00 LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970 IMPACTS: EP & IT @ Wednesday 26th October @18h00 LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970 IMPACTS: TE-VSC @ Wednesday 26th October @18h00 LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970 IMPACTS: TE @ Wednesday 26th October @18h00 LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970 Lock-out requests Waiting Lockout Approval @ Wednesday 26th October @18h00 LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970

No meeting next week due to LHC-TS3 Next meetings No meeting next week due to LHC-TS3 Next meeting Thursday 10th November, Room 30-7-010 From 9h00 to 10h30 AGENDA: EN-ACE-CL – Anne Laure Perrot TE-CRG – Cryogenics lock out – Antonio Perin BE-OP – Mirko Pojer HSE-RP –Christophe Tromel LHC machine Schedule for LHC TS3 2016 EDMS 1728265; INDICO 579970