Reuters - on the left once you see this leaving Vesenaz

Slides:



Advertisements
Similar presentations
Small Computer Rooms by Tim Hogard Micro Data Centers on a Budget.
Advertisements

UKSPA Conference 2008 Laboratories for the Future East Midland Conference Centre, University Park, Nottingham Incubator Buildings in Science Parks – special.
Network Design Issues Design and Documentation Prepared by: Aline L. Mendoza.
Engineering Services Planning Limited
Objectives: Chapter 9: Data Centre Architecture VLAN definition and benefits * VLANs and broadcast domains * Routers role in VLANs * Types of VLANs * VLANs.
Utility Management Providence Health System - Oregon Environment of Care.
Fire Precautionary Arrangements Presented by Mick Leadbetter Fire Safety Adviser.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Repairing of Building Services Engineering Systems Rak Repair Methods of Structures, exercise (4 cr) Esko Sistonen.
CERT MEOC Mobile Emergency Operations Center Concept designed by Keith Morin & Associates - Tucson, AZ.
Thermal Imaging Cameras (T.I.Cs) FF Mason Red Watch, Broughton.
Unit 204: Common plumbing processes
Cloud Computing Data Centers Dr. Sanjay P. Ahuja, Ph.D FIS Distinguished Professor of Computer Science School of Computing, UNF.
The Life Safety Surveyor Facility Tour
Telenor Tier 3 Data Center April About Telenor Tier 3 Data Center Telenor built it´s own Data Centar in accordance with the latest industrial standards.
GMP and HACCP in school restaurants Comenius School Development Project 2006/07 Srednja šola Zagorje.
 Given: No information  Find: The Number of basketballs required to fill this classroom.
1 Daya Bay Muon system Installation Workshop, IHEP, July 14, Updated RPC Gas System Installation Plan Changguo Lu Princeton University.
1 Daya Bay Muon system Installation Workshop, Daya Bay, March 22, Daya Bay RPC Gas System Installation Plan Changguo Lu Princeton University.
 Familiarization of system  Locations of: Hydrants FDC Knox Box FACP Sprinkler Riser Room Liquid Oxygen  Unique Fire Protection Element Smoke Curtain.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
 Site  Requirements  Local Resources  Initial layout ideas  Brief material selection  Supply options.
Computer Room Experiences A medium sized tier-2 site view Pete Gronbech GridPP Project Manager HEPIX April 2012.
1 Telecom Cabling Patch panels, cabinets and raised floors.
Principles of Computer Security: CompTIA Security + ® and Beyond, Third Edition © 2012 Principles of Computer Security: CompTIA Security+ ® and Beyond,
Learning, our way Examples of bad installation. CONTENT Installation related examples Installation related examples Application related examples Application.
Data Centre Design. PROJECT BRIEF Develop a low energy data centre for a major computing company. Building is to be a prime example of sustainable, low.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Transforming B513 into a Computer Centre for the LHC Era Tony Cass —
Building A Computer Centre HEPiX Large Cluster SIG October 21 st 2002 CERN.ch.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Computer Rooms 101 Geoffrey Day. Will the floor collapse? 42RU rack - 115kg 40 * 1Ru servers - HP DL360, 16.78kg each Shelves, cables etc 15KG per rack.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Nikhef/(SARA) tier-1 data center infrastructure
1 HVAC OVERVIEW for Single Tunnel Configuration November 17, 2008 ILC CFS Workshop 2008 Chicago, IL Lee Hammond, Fermilab.
Floor Wardens Safety Monitors & Guests. Overview.
Tangible Property Regulations Presented by David W. Jennings, CPA.
Fire Fighting Systems Fi Fi Mains ●White System: This system has a lower output as far as volume goes. This main supplies 3x Eductor/Hydrants (500 gpm).
Requirements for computing room A. Gianoli, M. Serra, P. Valente.
Red/Green Fire Fighting Systems Fi Fi Mains ●Red System: Port Side Fire Main supplies two Monitors. M7 (6000) gpm on centerline on the fwd Wheelhouse top.
High Performance Computing (HPC) Data Center Proposal Imran Latif, Facility Project Manager Scientific & Enterprise Computing Data Centers at BNL 10/14/2015.
1 System Design. 2 Primary Detection Secondary Detection Standards Pipe Design.
Energy Savings in CERN’s Main Data Centre
TGYDGL09 Project DEPLOYABLE RAPID DIAGNOSTIC LABORATORY MOBIOCHEM Ltd.
Vault Reconfiguration IT DMM January 23 rd 2002 Tony Cass —
ESS KAY CONSULTANTS MEP CONSULTANTS. WHAT IS MEP ??? MECHANICAL ELECTRICAL MEP PLUMBING.
Hot /Cold Aisle Containment  Traditional Data Center/Telco designs are changing significantly!
50% LBNE Concept Design WCD Infrastructure. Mechanical.
Fundamental Concepts for Design of Special Hazard and Fire Alarm Systems Chapter 1.
INFORMATION ABOUT ASBESTOS EDMS No General, 2.Materials, 3.Risks, 4.Effects on health, 5.Prevention at CERN, 6.Work management, 7.Your role as.
SCX5 – Proposed New Intermediate floor over existing CMS Rack Room J.Osborne CEMESTE 20 Feb 2008.
PHENIX Smoke Alarms Incident, 27-May-2016 Mickey Chiu, for the PHENIX Operations Crew.
West Cambridge Data Centre Ian Tasker Information Services.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS.
PART 3: Breathing System Parts
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
Louisiana State University Radiation Safety Office
Center for Advanced Technology and Training CATT Room Instruction Demo
Computing room PC farm UPS.
Building 400 Conference Room A/V System (press esc to exit)
EHN1 Extension North Side wall (Removal of Existing services & platforms) Michael Jeckel & Bastien Rae.
CERN Data Centre ‘Building 513 on the Meyrin Site’
M.Tavlet, H.Taureg - ALICE
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Cloud Computing Data Centers
INFORMATION ABOUT ASBESTOS
G061 - ICT Safety Problems.
Cloud Computing Data Centers
Presentation transcript:

Reuters - on the left once you see this leaving Vesenaz

Two on each of two floors Computer Room Layout Two on each of two floors Raised Computer Floor Air Conditioning UPS systems

Computer Room - Knurr Racks on GREY Tiles ONLY

Power Control and monitor - Amber, Blue, White X / Y Room Coordinates

False Floor 80 cms deep Perforated for air Amber Power Line Blue Power Line Not perfect cabling!!

Standard Knurr Rack 6 Ventilators in sealed roof Tony

Backside of Rack Amber Power Blue Power Painted power sockets

Standard sized Hole

Air Intake Smoke Detection at aspiration

Two Supplies with manual switch Inergen Gas Bottles

Power Distribution Amber Blue

Emergency Power Off on leaving Computer Room Smoke detection monitor similar to ours for STK silos

Noise Reduction in Air Conditioning Area Very Effective Smoke Detection

Unpacking Equipment Waste Cardboard picked up by special service

Control and Security Room (24 Hours) Power Indicators Room Cameras

Close Up

Backside of that control panel

Help Desk

This is what we want for Conference Rooms Power and Network Socket

Computer Room Ceiling DRY Sprinklers Pipes ONLY filled with water when smoke detected and sprinklers must operate

UPS system via MG set Fly Wheel maintain power for 4 seconds Diesel cuts in after 1.8 seconds

Front Panel of Air Conditioning module

Our Hosts Where’s Anne ? Keith Cronshaw from Bellwater Kristina Kamsaeter Tony Gilbert Banderet (Building Manager & designer) Where’s Anne ?