X-FEL linear accelerator

Slides:



Advertisements
Similar presentations
I XFEL Module Assembly AWLC’14, 14/05/2014 O. Napoly, CEA.
Advertisements

LCLS-II Cryomodules Production Plans at Fermilab
APPLICATION OF EDMS TO XFEL CRYOMODULE ASSSEMBLY AT CEA Christelle CLOUE - Catherine MADEC.
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Superconducting Cavities Development at Fermi National Accelerator Laboratory Dmitri Denisov DIET Federation Roundtable, Washington DC, April
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
Present status of TTF-cryomodules short overview Bernd Petersen DESY MKS March, 7, 2005 Main design features of TESLA-cryomodules Design changes for XFEL-cryomodule.
LCLS-II cryomodule alignment. 2 Wednesday meeting, 6/17/2015 Topics Alignment of Components inside the CM Tunnel Network Tolerances LCLS-II cryomodule.
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
3.9 GHz Cryomodule Shipment to DESY E.Harms on behalf of the Third Harmonic Effort Team (AD & TD, with help from PPD, FESS, BS)
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
1 K.Jensch, D.Kostin, DESY - Cryomodule components List S1 – DESY parts DESY parts for the S1 Cavity-String.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
Detail plan of S1-Global H. Hayano (KEK),
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
Cryomodule Assembly Facility (CAF) at Fermilab Tug Arkan (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
LCLS-II Button-type BPM (Review) Nikolay Solyak Review, FNAL, Dec. 12, 2014.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
C.MADEC - TTC meeting E-XFEL cryomodule assembly : prototyping phase at Saclay.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
FNAL Cryomodule Assembly and Installation Plans Tug Arkan May 22, 2015.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
S. Barbanotti - DESY Requirements Conformance for SRF Cryomodules Workshop 16/10/2014 – ESS, Lund XFEL cryostat main components: Quality Assurance and.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
CEA - Irfu – Mois 2011 – 1 Cavity-string alignment experience in the EXFEL prototype cryomodule assembly Michel Fontaine CEA – SACLAY DSM/IRFU/SIS TTC.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Third SPL Collaboration Meeting – CERN - 11 November 2009S. Chel 1 XFEL: cryomodule assembly at CEA/Saclay XFEL facility & Superconducting linac Main assembly.
ASSEMBLY OF THE IFMIF CRYOMODULE Janic Chambrillon On behalf of the SRF-Linac Team TTC Meetting - June 5th – 8th, Saclay.
RF SC CAVITIES –a story AMICI Industry days – Padova April 2017.
Crab Cavity Technical Coordination meeting:
Status of E-XFEL Module Assembly at Saclay
Teleconf ACS – FREIA 28th March 2017
Status of SCRF Accelerator Activities at CEA-Saclay
S1G Experiment Schedule Plan
Serial testing of XFEL cryomodules: results of the cryogenic heat load measurements  T Böckmann1, Y Bozhko1, W Gay2, P Halczynski2, B Petersen1, S Putselyk3,
Field Emission Minimization for LCLS-II
Cryomodule test stand at ESS site
FRIB Cryogenic Support
IT-4189 Supply and installation of a cryogenic distribution system
at STFC Daresbury laboratory
T5.2: Harmonization - Material and Component Reference
Introducing European XFEL Enlightening Science
S1-G Webex meeting Global Design Effort
Accelerator Module Test Facility
UK RFD Pre-Series cryomodule
XFEL Cold mass & vacuum vessel non-conformities Detected At saclay
Optimum cryomodule length at the ESS
HIE-LINAC status report
IMP Cryomodule Assembly and Alignment
Technologies and products
CEPC-650MHz Cavity Cryomodule
Prototype cryomodule development
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
Cryomodule Product Breakdown Structure and configuration traceability
XFEL cryomodule production and Reliability improvement
Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL SAFETY AND RAMI INPUTS - Franck Peauger OLIVIER KUSTER (INSTALLATION AND.
Magnetic shielding and thermal shielding
Presentation transcript:

X-FEL linear accelerator cryomodule integration LCWS, Strasbourg, the 26th October 2017

ALSYOM a subsidiary of ALCEN Group X-FEL cryomodule integration X-FEL accelerator Cryomodule description ALSYOM Industrial mission

ALSYOM : a subsidiary of ALCEN Group An Intermediate Size Company created in 1988 : Industry and Innovation High Technology activities dedicated to following domains: Defence and Security Energies Aeronautic Medical Equipment Large Research Infrastructure Main figures: About 31 subsidiaries in France and North Africa 2016 turnover ≈ 215 M€ 2016 employees ≈ 1 900 350 in Design Office 1 300 in Production ALCEN has a permanent innovation policy applied to its product and services

ALSYOM : domains of activities Experimental Nuclear Fusion Reactors ITER, RJH High Power Lasers Laser Megajoule, PETAL ELI (Extreme Light Infrastructure) Accelerator X-FEL Astrophysics Astronomy (CTA) Aeronautic, Defense and security Turret, satellite antenna and aero structure tools « Program Management, Design, Engineering and Manufacturing » for the production of mechanical and opto-mechanical equipment

ALSYOM : main expertise Development and industrialisation Mechanical, Opto-mechanical, Optic, electronic, command control Design, in collaboration with SEIV design office Product and Process Industrialisation System and Equipment manufacturing Series equipment and complex system production, including: High accuracy mechanism, control command electronic, Optic and cabling Opto-mechanical system in cleanliness and vacuum environment Integration and cleaning Geometrical characterisation Cleaning and integration in ISO 5 and ISO 8 condition Assembly, Integration and test Services Installation on Customer site, including cleanliness, welding and tests Optical Surface Treatment « sol-gel » Maintenance: mechanism, opto-mechanism, vacuum Unique Industrial entity in France grouping these expertise and combined performances High accuracy, large Dimension, Cleanliness and Vacuum

ALSYOM : location in France Paris Tarbes Le Barp LASERIS Bordeaux Cadarache VERSAILLES ALSYOM Headquarter TARBES Bordeaux LASERIS & LMJ

ALSYOM, subsidiary of ALCEN Group X-FEL cryomodule integration X-FEL linear accelerator Cryomodule description ALSYOM industrial mission

X-FEL linear accelerator Construction and installation of the European X-ray Free Electron Laser (E-XFEL). Location : DESY (Deutsch-Elektronen-Synchrotron) in Hamburg (Germany) Tunnel : ~ 1,6 km length 5 X-ray beams 10 experiment stations (research in biology, chemistry, nanotechnology, …)

X-FEL linear accelerator Description of the X-FEL Accelerator Linac (Energy : 17,5 GeV)

X-FEL linear accelerator Institutes involved in the construction of the E-XFEL accelerator

ALSYOM, subsidiary of ALCEN Group X-FEL cryomodule integration X-FEL linear accelerator Cryomodule description ALSYOM Industrial mission

X-FEL Cryomodules E-XFEL accelerator main components

X-FEL Cryomodules 496 types of parts E-XFEL Cryomodule - Main Components 496 types of parts

ALSYOM, subsidiary of ALCEN Group X-FEL cryomodule integration X-FEL linear accelerator Cryomodule description ALSYOM Industrial mission

ALSYOM mission Environment Industrialization ALSYOM Responsabilities Domain of expertise and responsibilities : Industrialization and process definition Assembly, Integration and test activities : production team management ALSYOM Responsabilities Environment Industrialization Methods Machines Deliver 100 cryomodules Meet deadlines Manage the documentation (Quality, Traceability…) Process Improvement Customer Satisfaction INTEGRATION PROCESS Materials People

ALSYOM mission Integration process organized in 7 workstations Cold Coupler Area – (ISO4-CC-WS) Coupler Cold Part assembly + 1 Gate valve Leak tests / RGA tests (RGA : Residual Gas Analysis) String Assembly Area – (ISO4-SA-WS1, ISO4-SA-WS2 ) Connection of the 8 cavities + 1 Quadrupole Leak tests / RGA tests Roll Out Area – (RO-WS1, RO-WS2) 2 Phase Pipe welding + tests (VT, LT, PT, RT) Temperature sensors, magnetic shields, 4K & 70K assembly Tuner systems assembly + RF controls Cold Mass positioning and hooking Alignment Area – (AL-WS1, AL-WS2) Alignment of the cavities/Qpole with the cold mass (~ 100µm) 8mm pipe welding + tests (VT, LT, PT) Electrical tests (Tuners & piezo systems) Current leads welding Thermalization

ALSYOM mission Integration process organized in 7 workstations Cantilever Area – (CA-WS) 4K & 70K shells welding Cables positioning and thermalisation Introduction inside the vacuum vessel ; fixing Alignment Cold Mass / vacuum vessel Coupler Area – (C0-WS1, CO-WS2) Coupler warm part assembly + Leak test Coupler Pumping Line assembly + Leak test T° sensors and Motors cabling Current lead connection + Electrical tests Current lead welding on the vacuum vessel + Leak Tests Cavity string pumping + final Leak test & RGA Shipment Area – (SH-WS1, SH-WS2) End caps positioning on the vacuum vessel Pumping and Nitrogen flushing RF controls, Motors controls Connection of the vacuum recording box for transportation Loading on truck

ALSYOM mission Integration process organized in 7 workstations

ALSYOM mission ALSYOM industrial team Production activities Up to 33 people Management and Quality Integrator in clean room Welder and coordinator RF, laser tracker, vacuum test technician Logistician Production activities Supply Chain Production Flow management Technical event management : from the problem to the solution Transverse activities Quality management Documentation management Configuration management

RESULTS Complete production cycle for ONE Cryomodule : 7 weeks Schedule and production rate 4 years divided in 3 Phases Training and Process definition (3 prototypes) Ramp Up to reach the rate of 5 days Series Production (100 cryomodules) with rate acceleration up to 4 days Complete production cycle for ONE Cryomodule : 7 weeks Up to ONE Cryomodule every for 4 days, ready for delivery

RESULTS Schedule and production rate achieved Performance achieved for the 100 Cryomodules

X-FEL inauguration in Hamburg

Welcome in the South West of France Thank you for your attention Thierry HOVSEPIAN Managing Director Eric GIGUET Commercial and Development Director ALSYOM 17 Bis Avenue des Forges CS 20125 65 001 Tarbes Cedex - France Tel.: +33 (0)562 446 700 Fax: +33 (0)562 446 701 www.alsyom-alcen.com Welcome in the South West of France