Grunenwald Science and Technology Building

Slides:



Advertisements
Similar presentations
DOUG BOSWELL MECHANICAL OPTION APRIL 16, 2008 Temple University Tyler School of Art.
Advertisements

Kevin Edstrom Mechanical Option 2011 Senior Thesis April 12 th, 2011 Georgetown University New Science Center Washington, DC.
Chilled Beam Presentation
STEM Center Delaware County Community College – Media, PA Thesis Final Presentation Dan Saxton Mechanical Option.
1 Condensation Control Experiences in an “historic” Building with Movable Sash ASHRAE Anaheim Seminar 53, 1/28/04 Stanley A. Mumma, Ph.D., P.E. Professor,
West Virginia University Alumni Center Gregory Smithmyer | Mechanical Option | Penn State University | April 15, 2009 | Advisor: Dr. Srebric.
Active beams versus VAV with Reheat Analysis of May 2013 ASHRAE Journal article Ken Loudermilk Vice President, Technology & Developement.
Jacksonville, FL The Pennsylvania State University Department of Architectural Engineering Zachary Polovchik Mechanical Option Advisor – Dustin Eplee Duval.
WESTINGHOUSE ELECTRIC NUCLEAR ENGINEERING HEADQUARTERS DANIEL AUGHENBAUGH - MECHANICAL OPTION Westinghouse Nuclear Engineering Headquarters Daniel Aughenbaugh.
Presentation Outline Introduction CHP Analysis Electrical Analysis Acoustical Analysis Thermal Storage Analysis System Optimization Analysis Conclusion.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
PSU Building Thermal and Mechanical Systems Laboratory Environment A/E Kurt M. Shank, M.S. & Stanley A. Mumma, Ph.D., P.E. College of Engineering Department.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
Saavedra Gehlhausen Architects Title: text size 36 pt. Text size 28 pt. Karl J. Jacobs Center for Science and Math.
North Pocono High School
Technology and Engineering Development (TED) Building Thomas Jefferson National Accelerator Facility Newport News, VA David Blum | Mechanical Option Dustin.
CENTRAL HIGH SCHOOL Central High School MID-ATLANTIC REGION ADAM BROWN MECHANICAL OPTION SPRING 2014 Introduction Existing Mechanical System Thesis Proposal.
Presentation Outline Introduction System Optimization Analysis Acoustical Breadth Conclusion Acknowledgements Questions Thesis Final Presentation Army.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
SENIOR THESIS PRESENTATION
Energy Efficient System Design: Geothermal System Coupled with Chilled Beams and DOAS Montgomery College New Science Center.
City of Hope Amini Medical Center Christopher Bratz Pennsylvania State University Architectural Engineering Mechanical Option Faculty Advisor: Dr. Jelena.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
Brian Ault – Mechanical OptionSpring 2008 Senior ThesisBarshinger Life Science & Philosophy Ann & Richard Barshinger Life Science & Philosophy Building.
Architectural Engineering Mechanical Option Ft. Detrick Defense Medical Logistics Center Building Systems Redesign April 16, 2008 Senior Thesis Presentation.
Ray & Joan Kroc Corps Community Center Mathias Kehoe | Mechanical Option April 09, 2012.
NRUCFC Headquarters Building Sterling, VA Architectural Engineering Senior Thesis Margaret McNamara | Mechanical Option Advisor | Dr. Stephen Treado.
Application and Design for The Charles E. and Mary Parente Life Sciences Building Kings College Wilkes-Barre PA Ryan James Wanko Building Mechanical and.
Hilton Hotel at BWI Airport Nathan Patrick The Pennsylvania State University Architectural Engineering – Mechanical Option.
UNIFIED SCIENCE CENTER THE UNIVERSITY OF SCRANTON SCRANTON, PA DALE E. HOUCK MECHANICAL OPTION.
Des Places Residence Hall Duquesne University Pittsburgh, PA Peter Edwards – Mechanical Option Advisor - Dustin Eplee Des Places Residence Hall Senior.
VIMS Seawater Research Laboratory Dan DiCriscio AE Senior Thesis Mechanical Option 2007.
Bronx School for Law Government & Justice Yulien Wong Mechanical Option 2006 Senior Thesis Bronx, New York.
Tri-Valley Jr./Sr. High School Hegins, PA Senior Thesis, Spring 2004 Studying The Feasibility of a Dedicated Outdoor Air System.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
Spring 2007 Senior Thesis Justin D. Schultz Mechanical Option The Hauptman-Woodward Medical Research Institute Dedicated Outdoor Air Applications at the.
Hilton Baltimore Convention Center Hotel Andrew Rhodes Spring 2007 Faculty Advisor: Dr. Bahnfleth.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
University of Maryland’s Gossett Field House College Park, MD Jason Borowski Architectural Engineering Mechanical Option Pennsylvania State University.
The Sunshine Elementary School Redesign Proposal Pennsylvania State University AE Senior Thesis Nicholas Scheib Mechanical Option- IP.
Jonathon Gridley Senior Thesis – Spring 2007 Mechanical Option Energy Efficient Mechanical System Alternatives South Jefferson High School S OUTH J EFFERSON.
Greenbriar East Elementary School Fairfax, Virginia Michelle L. Siano Mechanical Option Spring 2005 Senior Thesis.
Straumann USA 60 Minuteman Road Andover, MA Kevin Kaufman Mechanical Option The Pennsylvania State University Architectural Engineering.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Flood Athletic Center Woong June Chung Penn State University Mechanical Option Thesis Advisor : DR. Willam Bahnfleth, P.E.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Twin Rivers Elementary/Intermediate of McKeesport Area School District Tessa Bauman Mechanical Option Technical Consultant: Laura Miller 1600 Cornell St.,
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
The regional learning alliance At Cranberry Woods. CAITLIN HANZEL MECHANICAL OPTION THE PENNSYLVANIA STATE UNIVERSITY THE DEPARTMENT OF ARCHITECTURAL ENGINEERING.
The School District of Philadelphia Administration Headquarters Shell and Core Renovations 440 North Broad Street Philadelphia, PA Jayme Antolik Architectural.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
Alexander Radkoff Mechanical Option | Spring 2014 Advisor: Dr. Stephen Treado 123 Alpha Drive Pittsburgh, Pennsylvania
NOLAN JAMES AMOS Dr. William Bahnfleth, Faculty Consultant architectural engineering senior thesis mechanical option PHOENIXVILLE EARLY LEARNING CENTER.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.
Oak Ridge National Laboratory
Harley-Davidson Museum
ENVIROCENTER PHASE II JESSUP, MD
David Anderson Mechanical Option
Eastern Pennsylvania Laboratory Facility
Munters DOAS, Chilled Beams and VRV
Biobehavioral Health Building, University Park, PA
LONGWOOD AT OAKMONT HEALTHCARE CENTER
The Ed Roberts Campus Berkeley, CA Introduction Existing Systems
Lehigh Valley Heritage Center
Virtua Replacement Hospital -Voorhees NJ
Michigan Energy Summit | April 25, 2019
Presentation transcript:

Grunenwald Science and Technology Building Shane Helm Mechanical Option

Presentation Overview Building Overview Existing Mechanical System Geothermal Heat Pump Analysis Sizing Geothermal Wells Construction Breadth Energy Consumption &Payback DOAS with Parallel System Analysis Equipment Selection & Sizing Energy Consumption & Payback Recommendations **Architectural Breadth Covered Only in Final Report Grunenwald Science and Technology Building Shane Helm Mechanical Option

Building Overview Overall Design Goals Sustainability Provide State of the Art Laboratories Allow for Campus Growth with Additional Classrooms and Offices Keep Original Planetarium from Old Pierce Science Center Renovate & Include Large Lecture Hall & Planetarium in New Science and Technology Building Sustainability Achieved LEED Gold Rating Sustainable Design Approach Rainwater Collection Micro Turbine, Waste Heat Used to Pre-treat Outdoor Air Photovoltaic Panels, <1% of Energy Load Owner: Clarion University Building Size: 108,560 sf Function: Educational Facility Laboratories, Classrooms, Offices Construction Period Oct. 2006-June 2009 Delivery Method: Design-Bid-Build Total Cost= $34 million

Existing Mechanical System Overview Chilled Water Chilled Water Produced by (2) Centrifugal Chillers in Series Temperature Entering Coil= 44˚ F (2) 750 gpm Cooling Towers Hot Water (4) Natural Gas Boilers Campus Central Plant (2) Plate and Frame Heat Exchangers Campus Produced Steam Supplies Heat to Water Hot water Leaves at 180˚ F and Enters at 140˚ F Total Mechanical System Cost=$6.25 million 5 VAV Modular Air Handling Units 3 100 % Outdoor Air VAV Units to Serve Laboratories Range in Size From 23,000 to 42,000 CFM Include Energy Recovery Wheels Glycol Runaround Coil to Pre-condition Outdoor Air

Grunenwald Science and Technology Building Goal Improve the Energy Efficiency by Exploring Alternative Mechanical Systems

Geothermal Heat Pump Design Heat Pump Selection Water to Water Floor Mounted Capacity up to 35 tons Operating Conditions Ground Water Loop, 75 gpm per Heat Pump EWT=85˚ F LWT=93.7˚ F Load Water Loop, 90 gpm per Heat Pump LWT=44˚ F EWT=50˚ F Actual Capacity= 259,000Btuh=21.6 tons 17 Heat Pumps Needed to Meet Full Cooling Load Geothermal Heat Pump Design McQuay Heat Pump Model WRA 420 34 in. x 50 in. x 63.125 in. Placed in Mechanical Room In Floor Plan where Chillers Originally Located

Sizing Geothermal For Cooling Only Design Considerations Design Implements Vertical Bore Holes Based on Process Outlined in Chapter 32 of ASHRAE Handbook 2007: HVAC Applications Heating Load met by Campus Natural Gas Boiler Plant Need for More Bore Length when Cooling Only Calculated Total Bore Length= 87,458 ft Ground Temperature Clarion, PA = 51˚ F Designed to Meet Full Cooling Load 4,235,700 Btu/hr 1” HDPE Pipe for Bore Hole Loop 15’x15’ Bore Hole Spacing Grout & Piping Installed after Hole has been Drilled

Construction Breadth-Geothermal System Schedule and Location Optimization Heritage Hall Construction Breadth-Geothermal System Schedule Dependent on the Bore Hole Depth Installation of Pipes & Grout 1 week after Drilling To Prevent Blow Outs Not on Critical Path Total: 15.6 weeks, over Summer Semesters(14 weeks) Location of Wells Lowest Impact on Students North Quad Increased Initial Cost by $ 736,019 Initial Cost Grunenwald Science and Technology Building

Geothermal Heat Pumps vs. Energy Use Comparison Geothermal Heat Pumps vs. Existing VAV Design Total Energy Savings High Efficiency Saves 562,120 kWh each year Saves ~$27,000 Regular Efficiency Saves 516,811 kWh each year Saves ~$25,000 Calculated Simple Payback Periods High Efficiency- 27.23 years Regular Efficiency- 29.67 years Reduction in Energy Cost High Efficiency Saves 19.6% Regular Efficiency Saves 18.1% Added Construction Cost Increase Mechanical System Costs from $6.25 million to $6.98 million Increase of 11.7% in the Initial Mechanical Budget

DOAS Roof Top Unit Selection Dedicated Outdoor Air System Design DOAS Roof Top Unit Selection Sized Based on Ventilation Air Requirement for Each Zone Laboratory Air Handling Units Replaced by DOAS System 1 Sized at 7,450 CFM OA System 2 Sized at 8,800 CFM OA System 3 Sized at 2,100 CFM OA DOAS Unit meets Entire Latent Load and Part of the Sensible Loads Roof Top Unit Contains an Enthalpy Wheel and Sensible Wheel Supply Temperature = 55˚ F Remaining Sensible Load to be met by Parallel System System 1- 336,000 Btu/hr System 2- 432,000 Btu/hr System 3- 47,000 Btu/hr Parallel Systems Implemented Maximum Ceiling Area of ~50% for Each System Radiant Ceiling Panels Active Chilled Beams Passive Chilled Beams

Radiant Ceiling Panels Parallel Systems Active Chilled Beams Passive Chilled Beams Radiant Ceiling Panels Capacity of 3400 Btu/hr for each 12 ft2 unit Required Number of Units to Meet Remaining Sensible Load System 1- 99 units~ 5.8% Ceiling Area < 50% System 2- 128 units~ 9.2% Ceiling Area < 50% System 3- 14 units~ 7.9% Ceiling Area < 50% Therefore, Active Chilled Beams are a Feasible System Modeled using Trace 700 to Calculate Energy Costs Capacity of 1700 Btu/hr for each 12 ft2 unit Required Number of Units to Meet Remaining Sensible Load System 1- 198 units~ 11.6% Ceiling Area < 50% System 2- 255 units~ 18.4% Ceiling Area < 50% System 3- 28 units~ 15.8% Ceiling Area < 50% Therefore, Passive Chilled Beams are a Feasible System Modeled using Trace 700 to Calculate Energy Costs Capacity of 30 Btu/hr*ft2 Required Ceiling Area to Meet Remaining Sensible Load System 1- 54.8% >50% System 2- 86.5% > 50% System 3- 74.2% > 50% Since Required Area’s are Greater than 50% Radiant Ceiling Panels are Not a Feasible System

Energy Use Comparison DOAS vs. Existing VAV Design Total Energy Savings DOAS with Active Chilled Beams Save 217,488 kWh Saves $10,284 each year DOAS with Passive Chilled Beams Save 277,859 kWh Saves $13,177 Calculated Simple Payback Periods DOAS w/ ACB-6.45 years DOAS w/ PCB- 2.48 years Reduction in Energy Cost DOAS w/ ACB Saves 7.2% DOAS w/ PCB Saves 9.3% Added Construction Cost DOAS w/ ACB Increase Mechanical System Costs from $6.25 million to $6.32 million Increase of 1.1% in the Initial Mechanical Budget Added Construction Cost DOAS w/ PCB Increase Mechanical System Costs from $6.25 million to $6.28 million Increase of 0.5% in the Initial Mechanical Budget

Recommendations Alternative Systems Geothermal is Not Feasible Due to High Payback Periods Caused by Large Increase in Initial Cost However, Geothermal System Saves the most Energy Annually DOAS with Parallel System had Reasonable Payback Periods between 2.48 to 6.45 years, for PCB & ACB Best Possible Alternative Design is the DOAS w/ Passive Chilled Beams Payback Period of 2.48 years Initial Cost Increased by $32,000 Recommendations

Grunenwald Science and Technology Building Acknowledgements Brinjac Engineering, Inc. Clarion University BCJ Architects Michael Jacobs, Brinjac Engineering, Senior Mechanical Engineer Chas Cwernar, BCJ Architects, Architect Paul Bylaska, Clarion University, Facility Manager Rachelle Prioleau, Clarion University, Dean College of Arts and Sciences Dr. Jelena Srebric, Thesis Advisor

Grunenwald Science and Technology Building Questions?