International Civil Aviation Organization

Slides:



Advertisements
Similar presentations
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 14th MEETING OF WORKING.
Advertisements

F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N Next Generation Air/Ground Communications System.
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 13th MEETING OF WORKING.
International Civil Aviation Organization
FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
NextGen and Its Impact on Performance Worldwide Symposium on Performance of the Air Navigation System ICAO Montreal, Quebec, Canada March 26-30, 2007 Victoria.
Data Communications Program
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
NextGen GA Fund, LLC A Fund to Accelerate NextGen Equipage Benefits for the General Aviation Operator Community.
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
SESAR and ASAS Opportunity
Federal Aviation Administration Presented to: Network Centric Demonstrations and Prototypes Technical Interchange By: Deborah Young Date: November 4, 2009.
The Next Generation Air Transportation System “The Near Term and Beyond” Presented by Charles Leader, Director Joint Planning and Development Office.
ATN2001 Rev New Kent Fisher, Program Manager Boeing Air Traffic Management Kent Fisher, Program Manager Boeing Air Traffic Management.
Next Generation Air/Ground Communications (NEXCOM) Presented to ATN 2002 London, England 25 September 2002 James H. Williams Communications Integrated.
. Center TRACON Automation System (CTAS) Traffic Management Advisor (TMA) Transportation authorities around the globe are working to keep air traffic moving.
SESAR Single European Sky Air traffic management Research
Data Link Communications
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
FAA System-Wide Information Management Program Overview for SWIM-SUIT Public Lauch Donald Ward Program Manager FAA SWIM Program April 2007.
Federal Aviation Administration System Wide Information Management Segment 2 JRC Progress Presented to: Demonstrations and Prototypes TIM 5 Presented by:
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
Federal Aviation Administration AP23 : a snapshot on Package2 ASAS-TN2 Seminar 14 April Paris By Dragos Tonea, Eurocontrol Roberta Massiah, FAA.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT En Route Services Survey Results A Review 5/8/2013.
Presented to:GMU System-Wide Modeling Workshop By: Joseph Post, ATO NextGen & Ops Planning Date: 10 December 2008 Federal Aviation Administration FAA System-Wide.
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
FAA NextGen Data Comm Tower Service: CPDLC DCL New Operator Introduction.
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
WORKING GROUP I (WG-I) AEEC IPS Update
Larry Ley | Digital Aviation | Boeing Commercial Airplanes
International Civil Aviation Organization
FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/19
Presented by United Arab Emirates
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
NextGen and Its Impact on Performance
International Civil Aviation Organization
Workshop on preparations for ANConf/12 − ASBU methodology
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Ground System implication for ASAS implementation
International Civil Aviation Organization
ANConf/12 – Agenda H. Sudarshan
Data Communications Program
Future Communications Infrastructure – An update
NEXCOM by Bruce Eckstein FAA.
15-19 Nov 2010 Rockville, MD – Lockheed Martin
Workshop on preparations for ANConf/12 − ASBU methodology
ANConf/12 – Agenda H. Sudarshan
NEXCOM Next Generation Air/Ground Communications Briefing Presented to
Workshop on preparations for ANConf/12 − ASBU methodology
DATA LINK IMPLEMENTATION IN EUROPE
FAA and JPDO ASAS Activities
Workshop on preparations for ANConf/12 − ASBU methodology
FAA Data Communications Program System Engineering
International Civil Aviation Organization
ERAU NextGen Florida Test Bed (FTB)
Presentation transcript:

International Civil Aviation Organization INFORMATION PAPER ACP-WGM13/IP-02 18 November 2008 AERONAUTICAL COMMUNICATIONS PANEL (ACP) 13th MEETING OF WORKING GROUP M Montreal, Canada 18 – 21 November 2008 Agenda Item: 1(a) Data Communications Program Status (Presented by: Peter Muraca) SUMMARY This information paper is intended to provide status of on going activities within the FAA for the implementation of the Data Communications Program.

Topics Program Update Current Program Activities Avionics Standards Development Air-Ground Communications System Acquisition Specifications Development Next Steps (towards Final Investment Analysis) Economic Analysis SIR Development Equipage Strategy Prototype and Test Implementation Strategy Planning 2

Program Update Successfully completed Initial Investment Decision – July 2008 Entering Final Investment Analysis phase 3

SC-214/WG-78 Standards Development WWW.FAA.GOV/GO/SC214 WP1 Draft WP2 Draft WP1 + WP2 Standards Publication 2008 2009 2010 2011

Air / Ground Communications System Acquisition Conducted bilateral meetings with potential vendors throughout Summer 2008 Released Request for Comment 30 Oct 08 Summarizes FAA's Data Communications operation environment Continue to communicate with industry on the details of the service acquisition Developing draft acquisition strategy paper to be released to industry for comment The exact scope of the service and contract are still under development 5

Specifications Development Specifications development activities En Route SSD Tower SSD Communications Service Provider SSD Infrastructure SSD Maintenance, Monitoring and Control CONOPs/SSD 6

Final Investment Analysis – Activities Economic Analysis Cost estimation development for software development, hardware procurement, air-ground network acquisition, equipage incentivization, etc. Develop understanding of system benefits to include operational scenarios SIR Development Create acquisition documents for air-ground network Release of Request for Proposal to industry Proposal evaluation 7

Final Investment Analysis – Activities (cont.) Equipage Strategy Incentivization strategy Avionics targets Rulemaking strategy Coordination with overall NextGen rulemaking plan Prototype and Test Services Validation Security, HF Aircraft / Flight test capabilities Interoperability Communication Infrastructure Demonstrations Foundation for formal T&E process Implementation Strategy Planning Target ARTCCs to maximize benefit Early stages – roll out plan / trade space analysis 8

BACK-UP 9

Program Timeline 2008 10 12 14 18 20 22 2027 Key Sites: Investment Analysis Readiness Decision Initial Investment Decision En Route Equipage/ Airspace Requirements Tower TRACON Final investment Decision Deployment Complete Major Milestones 2008 10 12 14 18 20 22 2027 Near Term Activities Develop and Release SIR - Receive and Evaluate proposals - Develop Interface Requirements Mid-term Human Factors and Standards - Finalize Business Case Analyses - Complete JRC 2B, Final Investment Decision Contract Awards Complete Service Level Agreements Complete Safety Assessments Complete Initial Requirement Documents Complete Initial Cost Benefit Analysis Develop Initial Equipage Strategy Complete JRC 2A, Initial Investment Decision

System Scope Program Scope FAA System Scope User System Scope 1.0 Ground 2.0 Ground 3.0 Ground 4.0 Air- 5.0 6.0 7.0 User Data Message Ground Airborne Airborne Airborne Interface Processing Delivery Message Message Data User (GUI) (GDP) (GMD) Delivery Delivery Processing Interface Controller (AGMD) (AMD) (ADP) (AUI) Flight Crew FAA System Scope Program funds enhancements required to perform data communications in: Ground User Interface (e.g. ERAM/DSR display software) Ground Data Processing (e.g. application software to create clearances) Ground Data Delivery (e.g. wide area networking between ground facilities) Ground components of A/G Message Delivery (e.g. radio, ground antenna) User System Scope Users fund enhancements required to perform data communications in: Airborne components of A/G Message Delivery (e.g. aircraft radio, antenna) Airborne Message Delivery (e.g. aircraft networking) Airborne Data Processing (e.g. app s/w in comm & flight management units) Airborne User Interface (e.g. cockpit displays & s/w) 11

Data Comm Capabilities – Globally Harmonized 2010 2015 2020 2025 Aircraft Equipage Existing Aircraft Capabilities (FANS 1/A+, ATN CPDLC, … Avionics Standards Avionics Available SC214 Equipage Segment 1 Segment 2 Segment 3 DC In Tower DC In En Route DC In TRACON Rule Operational Capabilities Original;/Revised Departure Clearances, D-ATIS Conformance Management Initial Trajectory Based Ops Operational Terminal Info Service NAS Status / Delays / Constraints / Sequencing & Hazardous WX TRACON Data Comm Including Routine Clearances, Comm Mgmt, 4-D TAP/CDA & Time Based Metering Initial 4-D = Tailored Arrival Procedures (TAP) / Continuous Descent Approaches (CDA) to OEP Airports Clearances Comm Mgmt TFM Reroutes Time Based Metering Widespread Delegated Separation = Merging & Spacing (M&S), Crossing and Passing (C&P), In-Trail Procedures (ITP), Paired Approaches (PAIRAPP) Widespread 4-D Agreements Red = Terminal Function Black = En Route Function Purple = Cross Domain Function Conformance Management Complex Clearances Widespread M&S / C&P / ITP / PAIRAPP Widespread 4-D Agreements “NextLink” / SESAR Forward Fit Rule A/C Retrofit Rule All Europe Ground System Taxi-Out & In; Terminal Info European Deployment Comm Mgmt ATC Microphone Check LINK 2K+ SESAR TAP/CDA’s Implementation Package 1 Initial TAP/CDA’s Implementation Package 3 Implementation Package 2 En Route ATC Clearances 12