Teamcenter for CAD data management

Slides:



Advertisements
Similar presentations
SolidWorks Enterprise PDM Data Loading Strategies
Advertisements

Math Data Validation and Auto-Correction at GM using NX Check-Mate
ENOVIA SmarTeam Data Loading Strategies
Confidential Agenda sparesFinder introduction Key Issues Master data harmonisation – Cleansing process Item Management & Governance – Governance Issues.
Using Autodesk® Vault for Collaboration Between Purchaser and Suppliers Driss Yammouri Senior Consultant / MFG / Autodesk Consulting.
Safe Harbor The following is intended to outline our general product direction and cannot be incorporated into any contract. It.
Data Management in SolidWorks Sriram Uthaya Kumar Matrikel no: SS Data Management for Engineering Application.
© 2012 Autodesk MA5938-V Integrating Autodesk® Inventor® with SAP and Utilizing Model Structure for Production Planning Alexander Crane CIDEON consultant.
T-Systems PLM Products
Siemens PLM Software Overview 28 th of May 2008 Bulgaria Colin Johnson.
Product Lifecycle Management: Meeting the Needs of Collaboration
© Siemens Product Lifecycle Management Software Inc. All rights reserved Siemens PLM Software Translator Overview Joe Lackner Siemens Product Management.
CAD services for mechanical integration of large experiments Tatiana KLIOUTCHNIKOVA Introduction to a discussion aiming to collect comments and.
New Product Development Management NPDM 11 Mohsen SADEGHI
By A + B Solutions and LC Consulting Services ®. How to Integrate Production in to T EAMCENTER by LC Consulting Services 8 Denison Parkway East Corning,
University of Puerto Rico at Mayagüez Department of Mechanical Engineering Introduction to NX 6.0 Software Overview Modified by (2011): Dr. Vijay K. Goyal.
Teamcenter Update May 2012 Agenda  What is Teamcenter  Benefits  Status  Planned Next Steps.
Newmont Data Cleansing Project Overview ECCMA International Cataloging Conference October 26, 2006.
Unclassified U.S. ARMY TANK AUTOMOTIVE RESEARCH, DEVELOPMENT AND ENGINEERING CENTER Reverse Engineering Re-defined Requirements TARDEC 25 AUG Presented.
Presented by: Beau Keyte, LEI Faculty APICS Greater Jacksonville Seminar December 5, 2002 Value Stream Mapping and Management.
Product Lifecycle Management © 2003 IBM Corporation Customer Background  DBM Reflex is the world’s leading manufacturer of electroforms used to create.
1 Developing Custom Modeling Tools at GM with embedded Validation James A. Bullard General Motors.
Document Management System Designing & Managing the Supply Chain Term Paper – Proposal & Progress Jay Kang.
Reuse of Legacy Data for Vehicle Support within the US Army Dr. Raj Iyer US Army Tank Automotive Research Development & Engineering Center (TARDEC) Warren,
Siemens NX Overview.
Obsolescence Impact on Configuration Management
Health eDecisions Use Case 2: CDS Guidance Service Strawman of Core Concepts Use Case 2 1.
ATUL PATANKAR [ ASUG INSTALLATION MEMBER MEMBER SINCE: 2000 LINDA WILSON [ ASUG INSTALLATION MEMBER MEMBER SINCE: 1999 JUERGEN LINDNER [ SAP POINT OF CONTACT.
Maximizing the Value of Investments in Tax Administration Terry Lutes Principal, M Group.
CATDUA V5 Automation UPDATE.
Product Lifecycle Management – R12 Overview Manish Modi Vice President, Discrete Manufacturing, PLM & PIM Ravi Polisetty Director, Product Management,
INFSO-RI Enabling Grids for E-sciencE NA2 Dissemination and Outreach Jeroen Houben, Senior Webmaster, TERENA Secretariat EGEE All.
Pragati Automation Company: –Pragati is a well known manufacturer of machine tool accessories particularly for CNC Machines Associate Companies –ACE DESIGNERS.
Copyright © 2007, Oracle. All rights reserved. Product Lifecycle Management Overview.
New Product Development 1. Objectives  What are the various stages of the product development process?  What does concurrent engineering mean?  To.
PLM WG News CATIA Forum 2013 March 28th Stephane Bally on behalf of the PLM WG 1.
Copyright © 2007, Oracle. All rights reserved. Using the Product Workbench.
Industry Knowledge for Business Advantage © 2013 Cambashi Limited ALM and PLM grow closer Peter Thorne Managing Director, Cambashi 1 COFES.
Can you do this in SmarTeam?
Overview of Basic 3D Experience (Enovia V6) Concepts
PLM-documentation management plans & status Henrik Lindblad Group Leader PLM & Process support Oct 16, 2014.
Engineering Documentation
ISO STEP AP242 “Managed Model Based 3D Engineering” Roadmap for T-Systems STEP applications Paris, the 26 th of March 2014.
Import existing part with drawing
The New Generation of CAD Tools
Upturn Consulting 27, March 2017.
Background - Business Vision
ECAD HIGH TECH 27-Nov-17 © Copyright 2002 Parametric Technology Corporation.
REGIONAL USERS GROUP MEETING
Engineering into Nonin
Environment Variables…
Yogesh Khanzode Senior Manager, GTEC-GIS GPO Whirlpool Corporation
Theorem CADverter for STEP AP242
PLM, Document and Workflow Management
CATIA V5 and SMARTEAM help MASCHIO harvest big cycle savings
Welded assembly General methodologie
Assembly Design & Documentation
Workshop: Materials Use
Oracle AP/PO In the Shared Services Environment
PLM(Product Lifecycle Management) in
Raytheon Parts Management
ITSLMS - Teamcenter Sprint 3 Demo November 6, 2018
Electrical wiring harness interoperability: functionalities of AP242 ed2; preparation of the STEP 'electrical' Implementer Forum By Sophie Hérail (CIMPA.
Integrating MBSE and PLM
<Course name> <Lesson number>-1
Document Management Don Mitchell March 15, 2019.
Solidworks PDM EML4502- Senior Design 3.
T-FLEX DOCs PLM, Document and Workflow Management.
DOE Review of the LCLS Project 7-9 February 2006
Presentation transcript:

Teamcenter for CAD data management

PLM overview Big decisions Challenges CAD Integrations Agenda PLM overview Big decisions Challenges CAD Integrations

Decided onTeamcenter for PLM How did we get here? Today Vision CAD+VPM+PDM CAD+VPM CAD Decided onTeamcenter for PLM

Painpoints Data Management Systems Not 2 3 4 1 5 VPM/EPIC Integration Process Duplicate Effort in Separate Systems 75% of help desk issues are VPM/EPIC related Revision and Update of Parts and Products Time Consuming, Non-Value Add Process Reuse, Collaboration and Complex Processes CPP/CoC to CBU, NA / EU / AP Data Management Systems Not Transparent to Engineering VPM, CATIA, EPIC, JCDX & DDX Manual VPM Functionality Check-In / Check-Out Cannot save Kinematics, KBE, Powercopies, etc.

Manufacturing and Purchasing Design and Engineering Vision Prototype Validation Manufacturing and Purchasing Requirements Concept Design and Engineering Enterprise Integration Global SDT Collaboration Customer Collaboration Supplier Collaboration

1 Design for each CATIA dataset (CATPart, CATDrawing, CATProduct) Big Decisions Part - Design Model 1 Design for each CATIA dataset (CATPart, CATDrawing, CATProduct) Standard Naming OEM environments NX differences Precise CAD BOM Change objects

Data Migration VPM to Tc Time to migrate Adoption of Decisions Challenges Data Migration VPM to Tc No CATProduct from VPM Links Time to migrate Adoption of Decisions Design/Part Change objects NX strategy

OEM Setting/Templates OEM Tools/Applications CAD Environments OEM environments OEM Setting/Templates OEM Tools/Applications OEM quality check profiles Protect overwrite in different environments

Design Types

CATIA data import tools CATIA Integration CATIA data import tools Manage Assembly Utilities Check in/out Titleblock automation Purg (clean temp)

Direct access to Teamcenter NX Integration Direct access to Teamcenter Search Teamcenter Manage Assembly

Part – Design model Part Object Owner: Engineer Consumer: Manufacturing Design Object Owner: Design Engineer Consumer: Engineering

Design Revision Content BVR - Assembly Related Part Rev Related Design Revs Related Drawing Related Secondary Design Revs

Teamcenter CATIA Assembly

Teamcenter NX Assembly

Quality Check Automation

Design Status (change object) Workflow Process more than 1 revision Impact analysis Readiness check Provide report for failed readiness check