Solar Orbiter Instrument Testing by MOC-SOC

Slides:



Advertisements
Similar presentations
CAVIAR – Continuum Absorption by Visible and Infrared Radiation and its Atmospheric Relevance How on schedule are we? Keith Shine Department of Meteorology,
Advertisements

June 26, 2002; Page: 1 ESOC (TOS-OGR) European Space Operations Centre Manfred Warhaut Ground Segment Manager TOS-OGR ROSETTA Ground Segment.
Mars Climate Orbiter Team Magna Corp: Tim Toba Mohamed Sahil Nyema Johnson Abner Yemaneab University of Minnesota.
Michel Denis, ExoMars Ground Segment Manager, HSO-OPM
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
LLRV Timeline. June 1961Dryden Committee Formed June 1961Dryden Committee Formed Dec. 1961Bell contacted NASA HQ Dec. 1961Bell contacted NASA HQ Jan.
09 May 2014page 1 ROCC to PPL ICD Initial Definition ExoMars Rover Operations Control Center ROCC.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
SOLAR ORBITER SOC Test Plans Nana Bach SOWG#7 – 6-9 July 2015.
EMC Quiet Planning During Science Operations Andrew Walsh & Chris Watson Solar Orbiter SOC, ESAC, Madrid EMC Working Group #12, Imperial College,
Effective Methods for Software and Systems Integration
RSOC System Testing Status - 1 RSOC System Test Concept –Covered in RO-EST-PL-5013 –Status to be presented at key system reviews (GSRR) Connectivity Tests.
Senior Design 1 Project PBoT Zone Surveillance Team –Steve Beyer –Carolyn Farris –Emily McKaig University of Portland School of Engineering Advisor Dr.
FGM report 9 th Cross calibration workshop Elizabeth Lucek, Patrick Brown, Paul French, Chris Carr, Tim Oddy, André Balogh I mperial College London March.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
# - 1 E. Andrews LAT Software Schedule  Key FSW Milestone Dates –PAST: Jan ‘02 / Jul ‘02 – Preliminary Design Review / Delta PDR May ’03 – Critical Design.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
GLAST Science Support CenterAugust 9, 2004 Users’ Committee Meeting GSSC USER SUPPORT David Band – GSSC.
DEX Publication Project OASIS PLCS Telecon 27 November 2007 Trine Hansen.
1/15/02Bowman/Harch1 CONTOUR Science Ops Update Ann Harch Cornell University (607) Alice Bowman Applied Physics.
PACS SVR38/9 Nov 2007 System Testing1 Tests on Satellite Level H. Feuchtgruber.
PACS SVR22/23 June 2006 Warm Electronics1 Warm Electronics: Components/Subsystems Test Results B. Voss PACS SVR.
Solar System Division DVK, 10 Jul 2001 Rosetta Science Operations Experimenter to RSOC interfaces Detlef Koschny Space Science Department ESA/ESTEC
K. Mercier, Shanghai meeting, 19th-22 May 2014 CNES, 5 th June 2014 Karine MERCIER EUSO Balloon Key Point Flight Acceptance Organisation.
MOIMS MO & Nav Functions, Services & Interfaces CCSDS Ref Arch Discussion 20 Oct 2015.
ESA UNCLASSIFIED – For Official Use HSO-OP - Solar and Planetary Missions Division Solar Orbiter Instrument Operations, Data Handling and FDIR Ignacio.
ISWG 25 Jan 2016 Report to SOWG 26 Jan 2016 Burst mode planning ESAC analysis of EPD close/far data taking strategy; probably ok Implies we can be a bit.
ESOC | Chris Watson | ESA/ESOC | Page 1 SOC-Instrument Team interfaces CHRIS WATSON ESAC.
SSC Preflight Status Tested during Sim #3: –Telemetry ingest –Beacon processing –Science planning –Archiving of MOC data products, including level-0 telemetry.
1 Single Entry Model (SEM) Go-Live TAC Update May 7, 2009.
The road to the first E2E tests
Instrument Teams to SOC Test Specifications
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
Jan 2016 Solar Lunar Data.
SPF MAG Quarterly Report – Feb 2015
Richard Carr, ESAC, January 2015
Project Management W. J. Foyt
I&T&C Organization Chart
SOC-Instrument Team interfaces
Solar Probe Plus FIELDS
Detlef Koschny Research and Scientific Support Department ESA/ESTEC
Recommendation of Texas Test Plan Team to RMS
RLGS Status / LCC B. Pätz, DLR/MUSC.
GLAST Large Area Telescope:
IOR and E_FECS ICDs CHRIS WATSON ESAC.
THEMIS INSTRUMENT SUITE
Ulysses Nutation anomaly in
Solo mission operations
Current SOC-Ground System Integration Schedule (Jan )
Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun
Yearly Maintenance Process (for existing messages)
Jim Aloise System Programmer
Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun
NCR-MD FY19 (1) VERA/VSIP Timeline
Status of DS Procurement
DSC ChMC CSS Consequential Update 13th March 2019
Safety Group Program Timeline
NEMSIS V3.5.0 Timeline developed at NEMSIS Annual Meeting 2017
Month 43: June 2016 – Month 50: January 2017 Remaining Deliverables
2017 Advantage Program Timeline Guide
Integration & Test Instrument Operations Coordination
Safety Group Program Timeline
2012 Safety Group Advantage Program Timeline
2012 Safety Group Advantage Program Timeline
2013 Safety Group Advantage Program Timeline
XRN 4954 – MiR Drop 5 - Status Update
XRN 4927 – MiR Drop 4 - Status Update
LIU Wirescanners software
Presentation transcript:

Solar Orbiter Instrument Testing by MOC-SOC Ignacio Tanco, Sylvain Lodiot SOWG#9, ESAC 25/Jan/2017

Outline Overall MOC-SOC Testing approach Instrument Test Campaign Inputs Required Conclusions

Overall Testing Approach by MOC Objective: demonstrate MOC can support operations Test campaign from L-3 yrs to L-5 months. Increasing scope and complexity Engineering Acceptance-> SW Acceptance -> Interface Tests -> Operations Validation Instruments tests will be part of Interface Test Campaign (SVTs) and Operations Validation.

Operation Validation Campaign Tests In the SOV campaign involving Instruments: Date Test Objective L – 10 months DDS Test Test Instrument TM & Command Request transfer capability L – 9 months MOC Interface Test Systematic verification of all file exchange (PDOR, MDOR) L – 6 months In-Situ Operations E2E Processing of a realistic Cruise STP data set. Instruments submit to SOC, and SOC to MOC. Checkout Window E2E Same as above, but including RS operations for a checkout window.

SVT Campaign SVT Tests are run on the PFM, including Instrument FMs. Emphasis during SVTs is on verifying HW commands and functionality as far as possible. Tests In the SVT campaign involving Instruments: Date Test Objective Jan/2018 SVT 1a Systematic test of the Instruments’ FOP procedures (adapted for running on ground). June/2018 SVT 2 Re-test of any anomalies found during SVT-1a

Inputs Required Due Date Test Instrument input Jan/2017 SVT First Instrument FOP inputs for Flight. Oct/2017 Final Instrument FOP inputs for Flight. ??/2017 IOR w/ SOC IORs for SOC delivery Dec/2017 DDS Test w/ MOC Data Retrievals from EDDS Jan/2018 Command Test w/ MOC PDORs and MDORs Feb-Mar/2018 IS E2E In-situ consistent IORs set for STP Checkout Window E2E Remote-sensing consistent checkout IORs for STP

Conclusion ESOC is awaiting FOP inputs as agreed at Instrument Commanding Workshop in Sept/2016. So far, a grand total of 0 procedures by 0 Instrument Teams has been received. We seem to be running behind schedule.

Q&A ESOC is always happy to help and support! (On-line and off-line) Any Questions?