Implementation of Connection Network Codes The French process

Slides:



Advertisements
Similar presentations
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
Advertisements

KEY CONSULTATIONS an overview Louise Masters InnogyOne, Innogy UK Offshore Wind 2003.
Joint Grid Code Review Panel POR Working Group Meeting 2 27 th March 2015 Chairperson : Michael Preston.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Generation & Trading CIST REGIONAL ENERGY MARKET IN SOUTH EAST EUROPE (REM) Athens – 27 th of October 2004.
Tahir Kapetanovic ENM TF Co-Chair XIX Florence Forum, December 2010 Draft Pilot FG for Electricity Grid Connection.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
State of implementation of the decision III/6f regarding Ukraine (MOP 2, June, , 2008, Riga, Latvia)
1 Vienna Economic Forum –VEF- ERE AND THE REGULATORY FRAMEWORK FOR THE PRIVATISATION OF DSO Bujar Nepravishta Chairman of ERE Tirana-8 th and 9 th June.
Development of System Operation Network Codes ACER Workshop 24 August 2011 Ole Jan Olesen, Convenor ENTSO-E Working Group on European Operational Standards.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
European Commission 1 Interoperability of Air Traffic Management systems for the Single European Sky.
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
GC0104 – Demand Connection Code (DCC)
Gas Regional Initiative South South-East
GRI SSE Work Plan Project proposal of HEA
Compliance with the RfG
Agenda TSOG 8th November
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
Transposition of European Network Codes
Demand Connection Code
GC0102 – System Management & Compliance
EU Tariffs Code Update Based on Refined Draft as of 30th October
INTERCONNECTION GUIDELINES
20th April 2016 Teleconference
Grid Code What is the Standard Modification Process? Panel
Transmission Planning Code – Draft Document
Implementation of Connection Codes in Norway
NWE Day-Ahead Price Coupling
Code Governance Review UNC Modification Proposals
Grid Code Review Panel 16th August 2017
Transmission Planning Code
37th IG Meeting South Gas Regional Initiative
KORRR INFORMAL STAKEHOLDER WORKSHOP
Storage Connection requirements
- GDP 2011 versus 2010 – increase by 5.5%
Topic Operational Information Exchange
WG Belgian Grid Implementation Network Codes.
Setting Actuarial Standards
20th April 2016 Teleconference
Implementation of Connection Codes in Norway
Update on European Network Codes
Implementation of Connection Network Codes The French process
37th IG Meeting South Gas Regional Initiative
LITGRID AB Implementation of EU Connection Network Codes
Regulatory Framework and NC implementation in Finland
EU Netcode Emergency & Restoration
GRI SSE Work Plan Project proposal of HEA
Andrius Šimkus │ Energy Community Secretariat Tbilisi, 5 October 2018
20th April 2016 Teleconference
Gas Quality & TSO – LSO Coordination
37th IG Meeting South Gas Regional Initiative
Vanda Nunes de Lima 18th June 2009
Implementation Network Codes: status update
An Update of COSO’s Internal Control–Integrated Framework
Gas Regional Initiative South South-East
Connection Codes Implementation
Jill Michielssen European Commission, DG Environment
Proposer: Debbie Brace Panel Date: 20th March 2014
Item 8 Revision of the European Statistics Code of Practice
GRI SSE Work Plan Project proposal of HEA
Review of the 1958 Agreement
Open Letter - Summary of Responses
Item 4.2 – Towards the 2016 AES Philippe Lombardo Eurostat-F5
Implementation of Connection Codes in Norway
LITGRID AB Implementation of EU Connection Network Codes
Outline Mandate Working methods Timetable
Gas Regional Initiative South South-East
Presentation transcript:

Implementation of Connection Network Codes The French process Energy Community /ENTSOE external Workshop Vienna 25.02.2016 Stéphanie Bieth – RTE French TSO

Topics Organisation and schedule Impact on the national documents Roles of the involved parties

Topics Organisation and schedule Impact on the national documents Roles of the involved parties

Launch of the national implementation of connection Network Codes A « pilot working group » was put in place in October 2014 by the Ministry, in cooperation with the French Regulator (CRE), in order : To assess the impact of RfG on the existing texts governing the connection of generators to the grid To list the subjects that have to be discussed with stakeholders and identify their importance for the stakeholders To define in which framework the consultation should take place. A report was presented to the Ministry and the Regulator in March 2015. Organization and schedule

A specific committee for discussion and proposals The report concluded that a specific committee should be put in place to discuss and make proposals on the implementation of RfG on a national level. This committee only addresses the implementation of RfG. It started in July 2015. Feedback on this experience should enable us to decide on the process for following codes. These principles should be consistent. A committee on DCC implementation was put in place in December 2015 A third one on NC HVDC is expected in March 2016 Organization and schedule

Key principles The committee makes proposals on non-exhaustive and non mandatory requirements as well as proposals on methodologies identified by the « pilot working group ». Based on these proposals, it will then be up to the Ministry and/or the Regulator to decide on these requirements and methodologies. Organization and schedule

Choice of type B, C, D thresholds Implementation schedule March 2018 Implementation ends March 2019 applicability March 2016? Entry into Force T0: ECBC vote Sept. 2016 Dec. 2016 March 2017 26/06/15 3 2 regulatory framework modifications Sept. 2018: Declaration of existing facilities Technical requirements 1 Choice of type B, C, D thresholds A B C D Grid codes modifications (TSO and DSOs) 4 Some of the elements of step 3 and 4 can start before the end of step 2 and 2’ 2’ Operationnal notifications and Compliance process Zoom 5 Cost Benefit Analysis Derogations 6 7 Application to existing facilities Organization and schedule

Implementation schedule -Zoom March 2017 Dec 2016 March 2016 2 Types B,C,D FRT capability (SPGM, PPM) fast fault current injection PPM Reconnection after fault Control and protections Informations exchanges Active power recovery (SPGM, PPM) Types C,D LFSM-U FSM Reactive power capability (PQ diagram ) Voltage control (PPM) P control Tripping to houseload, black-start, island operation Instrumentation, models Ramps Synthetic inertia PPM Types D FRTvoltage ranges Voltage control Synchronization Automatic disconnection Types A,B,C,D Time period in the frequency ranges ROCOF threshold LFSM-O Admissible active power reduction Type A Logic interface Automatic reconnection Offshore UQ Diagram at Pmax Voltage ranges Type B reactive power capability Logic interface for P control Operationnal Notification Type A 2’ Operationnal Notification + Compliance process B,C Operationnal Notification + compliance process Type D et offshore Organization and schedule

Topics Organisation and schedule Impact on the national documents Roles of the involved parties

NRA Decisions on connection procedures Existing framework concerning technical requirements for connection Decrees Arrêtés (Orders) Energy Code TSO and DSOs Grid Codes Directive 2009/72/CE European Law National Law Regulatory Framework General provisions on technical requirements for connection and their scopes Detailed requirements such as reactive power requirements, FRT capability, compliance monitoring, etc. are defined by Orders SOs describe the regulatory, technical and contractual conditions to connect facilities to their network. They may also specify technical solutions allowing compliance with the regulatory aspects NRA Decisions on connection procedures Impact on the national documents

Impact of the RfG NC on Decree Today, France has one Decree related to the connection of generators. This decree must be revised. For the sake of clarity, an option under discussion is to keep one “all-encompassing Decree”. Option under discussion  A “all-encompassing Decree” which could : Include the existing provisions still applicable and take into account new provisions from the RfG Network Code. Define which national authority is competent to approve, when needed, requirements from the RfG NC and create the link between provisions which will be defined in Orders, NRA Decisions and Grid Codes. Impact on the national documents

Impact of the RfG NC on Orders and Grid Codes Arrêtés (Orders) Today, France has Orders defining the technical requirements and compliance monitoring measures per voltage level A deep revision will be needed in order to take into account the new provisions from the RfG Network Code (Yet to be determined during Implementation Committee) TSO and DSOs Grid Codes System Operators Grid Codes bringing together a large number of regulatory, technical and contract conditions will be strongly impacted A deep revision should be conducted by each System Operator The Grid Codes should gather RfG NC and national regulations provisions in order to inform customers of all applicable provisions. Impact on the national documents

Topics Organisation and schedule Impact on the national documents Roles of the involved parties

The Involved Parties Stakeholders : generators, associations of generators, manufacturers Network operators: the DSOs association, RTE the French Energy Ministry and the Regulator. All are involved through the specific Implementation Committee Roles of the involved parties

The Implementation Committee Decision and Validation Authorities (NRA / French Ministry) Implementation Committee (Convenors: RTE / DSOs Association) Ad-hoc working groups Transmission specific issues Distribution specific issues Common issues Proposals of changes in the regulatory framework Or Principles to include in the network operator grid codes Roles of the involved parties

How does the commitee work? Proposal (s) Discussions Topic identified by the Implementation Committee or ad hoc WG Stakeholders written proposals, comments, analysis CONSENSUS When applicable NO Consultation (art.10) Written position of the Stakeholders on each proposal YES Report of the consultation Report of the consultation Final Proposal Proposal & consultation report Report validation by the Implementation Committee or the ad hoc WG Ministry or NRA approval Ministry or NRA approval Decision to send the report Formal decision from Ministry or NRA NO YES Roles of the involved parties

Thank you for your attention!