The SABRE Crystals Frank Calaprice.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

P.-R. KettleMEG-Review February MEG Beam Line Studies  E5 Z-Branch NOW !!! NOW !!!
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
WP3: R&D on ultra low-level detectors and facilities WP3: R&D on ultra low-level detectors and facilities status and outlook Matthias Laubenstein JRA1.
Downstream PID Review Alan Bross MICE CM 16 October 8, 2006.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Annie Griffith Infrastructure Programme Manager July 2007 UK Link Technology Refresh.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
OPERA bricks LNGS G.Rosa, C.Sirignano Emulsion Workshop, 7-9 December 2006.
Telescope Integration and Tests Tuesday Afternoon.
COUPP 2L Chamber at SNOLAB Jeter Hall Fermilab Center for Particle Astrophysics.
JRA2 - IDEA Zaragoza, Andrea Giuliani University of Insubria (Como) and INFN - Milano.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
DEX Publication Project OASIS PLCS Telecon 27 November 2007 Trine Hansen.
,,,,, The Daya Bay Reactor Neutrino Experiment Liangjian Wen On behalf of the Daya Bay Collaboration Institute of High Energy Physics Daya Bay Detectors.
1 US Cost & Schedule Summary W. R. Edwards US Project Manager CD-2/3a Review January 8, 2008 BNL.
The Daya Bay Reactor Neutrino Experiment R. D. McKeown Caltech On Behalf of the Daya Bay Collaboration CIPANP 2009.
P. Shanahan Nov 15, 2003 Page 1 MINOS WBS 2.3: Electronics, DAQ and Database Status Accomplishments since May review Near Detector Electronics production.
KPS Chonbuk University 2005/10/22 HYUNSU LEE Status of the KIMS dark matter search experiment with CsI(Tl) crystals Hyun Su Lee Seoul National.
CTF at Gran Sasso (overview of the hardware) Richard Ford (SNOLAB) (who has not been in the collaboration since 2004) March 19 th 2010.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Shintake Monitor: Installation and Commissioning Schedule Taikan SUEHARA, The.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
TPC Collaboration Meeting Peter Glassel 1 Reminder on Installation Schedule (ALICE Forum June 2002)  Install Muon magnet directly into experimental.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Emulsion processing at Gran Sasso a brief update The new building Meetings between Company’s management and GS staff to fully define the project ‘Work.
1 Study of 48 Ca Double Beta Decay by CANDLES T. Kishimoto Osaka Univ.
EMCAL Calibration & Assembly at Yale University Mark Heinz, Project Mgr EMCAL Meeting Nantes July 15, 2008.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
NUMI MINOS MINOS Far Detector Installation & Commissioning Jeff Nelson MNHEP DoE Visit September, 2002.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
PyungChang 2006/02/06 HYUNSU LEE CsI(Tl) crystals for WIMP search Hyun Su Lee Seoul National University (For The KIMS Collaboration)
Understanding the Financial Management of Your Cooperative Agreement Quito, Ecuador October 2009.
The Princeton NaI Experiment (SABRE) Frank Calaprice Princeton University Cosmic Frontier Workshop SLAC March
SBN Far Detector Building Conventional Facilities Update Steve Dixon WG3 Workshop 11 September 2014.
1 DarkSide Collaboration APC Paris, France Augustana College, USA Black Hills State University, USA Fermilab, USA IHEP, China INFN Laboratori Nazionali.
TF Fabrication Progress is being made on TF bundle fabrication activities but the schedule remains tight. All 24 outer conductors have been machined but.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
MUSE NSF Review March 24, MUSE Project Management Ronald Ransome Rutgers The State University of New Jersey For the MUSE Collaboration.
1 Cary Kendziora Fermi National Laboratory Cary Kendziora Fermi National Laboratory CEC-ICMC 2013 Anchorage Alaska – June, 2012.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
ELENA installation progress F. Butin / ELENA collaboration.
Mark Vagins Kavli IPMU, University of Tokyo 4 th Open Meeting for the Hyper-Kamiokande Project Kashiwa January 28, 2014 Gd Status.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
IN THIS Slide show YOU WILL LEARN ABOUT ALL VERSIONS OF "MS OFFICE"
HADES collaboration meeting XXX, Lisbon, 7-10 October, 2015,
Beam Dump Hall Volume Beam Dump Meeting at SLAC May S.Ban
SABRE PoP Fluid Handling
BSS Prep work at CERN and Acceptance of Parts
Summary of fiducial volume test at KEK
UK RFD Pre-Series cryomodule
SmartMeterTM Steering Committee Update – September 2012
X-ray Pump-Probe Instrument
Slice Test Planning Schedule(s) and Milestones.
• • • Ge measurements for SuperNEMO
IHEP Cryomodule Status
Second Grade News October November Winter Intercession
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
GANTT CHART can be used for scheduling generic resources as well as project management. They can also be used for scheduling production processes and.
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
LCLS Personnel Protection System and Beam Containment System
Teleconference ACS – FREIA 19th June 2017
Welcome Update on ESS Construction Project
UPPSALA UNIVERSITY_GERSEMI PROJECT
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
XRN Nov 19 Release - Status Update
Polarized 3He target installation
Presentation transcript:

The SABRE Crystals Frank Calaprice

SABRE PoP NaI(Tl) Crystal Producer: Princeton University & RMD Company (Boston) Starting point: Astrograde powder by Sigma Aldrich with 9 ppb natK. In fall 2015 RMD grew a 2-kg crystal (3.5” diameter) with: 9 ppb natK (same as starting powder) < 0.1 ppb 87Rb Measured by ICP-MS: First crystal below DAMA ([K]~13 ppb, [Rb]<0.35 ppb) Research since then focused on: Growing full-scale 5-kg crystal (≈ 4” diameter) improving procedures for crystal growing to reduce background Powder drying, crucible purity, etc. Refined procedure for crystal handling (polishing, crystal mounting and handling inside the enclosure in glove box) Facilities at PU: new glove box installed inside Rn-free clean room Growth setbacks: Impurities in crystal-grade powder- now understood (?) RMD funded by DoE (1 M$) -> extra 50 kg of Astrograde powder 3 ppb in K Test growth of full-scale crystal with Astrograde Powder (AP) August 2017 1st crystal with RMD AP and crucible: Oct 3 2017 (still cooling…) 2nd crystal with PU AP and crucible: Nov. 2017 (starting soon) 2kg test crystal LY SABRE 14 pe/keV LY DAMA 5.5-7.5 pe/keV Glove box @ PU

Princeton SABRE Crystal Group -July 2017

Small Oven System for Crystal Growing Tests.

Small 2-inch Crystal grown in Princeton

SABRE PoP Summary Setbacks in crystal growth, delay of site preparation, and delay in purchase orders, all introduced several months of delay. We passed these problems and expect to good progress now. Growth of 1st 5-kg crystal is expected to finish in early October. A second will come in November. Fluid operations, blocked by laboratory management, can start under new agreement with Regional Authorities. With completed Safety Review, cleaning with fluids and scintillator operations should start soon. Most of the major components are either in LNGS, or ordered for delivery in October or November. The orders include the external shielding, the crystal insertion system, and the crystal enclosure. Provided there are no further delays, we expect to assemble the detector and begin commissioning by the end of 2017.

PoP Milestones Schedule Milestones completion Date Veto vessel dry commissioning (Hall B) July 31st, 2017 Hall C Site available (5 months after Hall C vacated) May 12th Lower Lead shielding July 3rd PRA approval by LNGS Sep 14th CIS delivery to LNGS Sep 20th Crystal enclosure delivery to LNGS Oct 15th PE + SS +catch basin+ water tanks shielding delivery to LNGS Oct 15th PE shielding installation in Hall C Oct 31th Veto vessel cleaning + Lumirror + PMTs installation in Hall C Oct 31th Electronics + DAQ installation in Hall C Oct 31th Crystal insertion system installation inside the veto vessel Nov 10th Fluid handling installation in Hall C Nov 30th 5 kg crystal growth @ RMD Oct 3nd Crystal enclosure delivery to PU Oct 31th Crystal-PMT installation in enclosure in glove box @ PU Nov 15th Crystal shipment to LNGS Nov 30th Crystal installation in the vessel Dec 10th LS preparation (to be done in advance, BX activity) ??? Veto commissioning End 2017 PoP run 2018