Bids ranged from $992,264 to $1,999,305 JO-SH General Engineering was apparent low bidder Lash Construction 2 nd $1,156,453 Construction to start.
Tank Inspection and Maintenance Leo Yuskus, Senior VP Haley and Ward, Inc. WHY IS THIS IMPORTANT.
AWARD OF CONTRACT FOR CONSTRUCTION OF MASTER DRAINAGE FACILITY LINES D & D1 CIP NO City Council Meeting December 20, 2011.
1 Construction Cost Impacts Florida DOT Experience Greg Davis State Estimates Engineer Florida Department of Transportation Greg Davis State Estimates.
Presented to: 32 nd Annual Airport Conference – Hershey, PA By: Jeff Gagnon, P.E. Manager AJP-6312 Date: March 4, 2009 Federal Aviation Administration.
2015 CONAWAY CONFERENCE Consultant Inspection & Prequalification Lyle Flower Administrator Office of Consultant Services.
Approaches to Historic Bridge Rehabilitation Case Study #4
Department of Public Works Arroyo Seco Casting Pond Renovations Contract Award to Mallcraft, Inc.
Informational Meeting. The mortar joints have started to break down and shift Minor re-pointing was done in 2001, major re-pointing in 1985, work prior.
2014 construction bond planning Needs assessment- what are we missing Site visits- in and out of district Safety concerns Life cycle evaluations- where.
Professional Engineering Procurement Services Division Solicitation No. 15-5RFP5004 Donella Drive Improvements Project Status Presented By: Kyle Gass,
C-4 Canal Bank Improvements Belen Phase 2 Flood Protection Berm & Wall John Mitnik, P.E. Engineering & Construction Bureau Chief John Mitnik, P.E. Engineering.
Keith Roberts, P.E. Project Implementation Engineer IDOT – District 9.
EASTERN MUNICIPAL WATER DISTRICT County Water Company Consolidation Project Greg Kowalski, P.E. Senior Civil Engineer April 1, EXHIBIT.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Regional Water Reclamation Facility 23-MGD Expansion Project Joe Mouawad, P.E. Senior Director.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
SEWER TRUNK LINE REHABILITATION PROJECT (Alexandria Place, Black Oak and Navy Drive) COUNCIL AGENDA ITEM 14.1.
1 EASTERN MUNICIPAL WATER DISTRICT Cactus II Feeder Transmission Pipeline Joe Mouawad, PE Sr. Director of Engineering September 2, 2015.
1 | emwd.org MV 2060 Pressure Zone Potable Water Storage Tank and Transmission Pipeline Joe Mouawad April 6, 2016.
1 EASTERN MUNICIPAL WATER DISTRICT Quail Valley Sewer Improvements Sub-Area 9, Phase 1 Joe Mouawad, P.E. Sr. Director of Engineering October.
The Housing Rehabilitation and Reconstruction Monitoring Reviews… How to Successfully Pass.
Newport Beach City Council Meeting January 22, 2013 Agenda Item No. 16.
1 | emwd.org AquaSel Brine Concentration Demonstration Project Khos Ghaderi, P.E. May 18, 2016.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
PORT OF TACOMA. Agreement Lincoln Avenue Grade Separation – Utility Relocation Request authorization for the Executive Director to Execute an Agreement.
1 | emwd.org Indirect Potable Reuse (IPR) Public Outreach and Preliminary Design Services Joe Mouawad, P.E. and Jolene Walsh August 11, 2016.
1 EASTERN MUNICIPAL WATER DISTRICT Public Access Areas Renovation Project Debbie Hoffman, PE Civil Engineer II, Project Engineer July 1, 2015.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Reject all bids for Citywide Tree Trimming Services and authorize increases to Contracts No. 21,628 and No. 21,629 with George Salinas Tree Preservation,
Procurement & Strategic Sourcing
TVRWRF 23 MGD Expansion Disinfection System Conversion
Water Booster Station Improvement Study
Holly Street Bridge Retrofit and Rehabilitation Project
Procurement & Strategic Sourcing
Sun City Lift Station Odor Control Improvements
City of San Jacinto 7th Street Pavement Repairs
CSM Buildings Modernization DESIGN-BUILD QUALIFICATION CONFERENCE
Light Rail Transit Project
Quail Valley Subarea 9, Phase 1 Sewer Award of Construction Contracts
State Lobbyist Services
Cottonwood Recycled Water Pipeline (West)
Winchester Lift Station Odor Control Project
Analysis and Calibration of Sewer Flow Tenant Type Factors
Audie Murphy Road Sewage Lift Station Award of Construction Contracts
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
Procurement & Strategic Sourcing Charter Bus Transportation Services
Perris Water Filtration Plant Membrane Upgrade – Phase I
U.S. Air Force Cooperative Agreement for Perfluorinated Compounds Response Activities, Phase 2 (ESCA II) Jayne Joy, P.E. July 18, 2017.
RECLAMATION Power O&M Program Great Plains Region
District-Wide Well Maintenance, Rehabilitation, and Repair
Memorandum of Understanding with GE Osmonics, Inc
SJVRWRF Dewatering Building Corrosion Remediation
Voice Radio System Replacement Project
Phase 3 Solar Feasibility Study Findings and Recommendations
Cost of Service Analysis & Rate Design
Mountain Avenue West Recharge Basin Project
Phase 3 Solar Renewable Energy Initiative - Site Improvements
Reach 4 Air Valve Replacements Award of Construction Contracts
Santa Ana River Conservation and Conjunctive Use Program: Program Development Phase Costs Brian Powell, P.E. 8/17/2016.
City-wide LED Street Light Conversion Program
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Wimberley Wastewater Treatment Plant Project
25th Avenue Grade Separation
25th Avenue Grade Separation
ApprenticeshipNC Regional Collaboration and Expansion Project
Ward Park Restroom Timeline
Authorizing ED to Reject Bid for Contract P01005C10
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
Procurement & Strategic Sourcing
Presentation transcript:

College II Tank Interior Recoating Award of Construction Contracts Marc Serna, P.E. September 20, 2017

Background College II Tank No recoating in the past 25 years 6 MG, Welded Steel Serves 1680 Pressure Zone Constructed in 1991 No recoating in the past 25 years College II Tank

Condition Assessment – Tank Rehab Study College II Tank – Corrosion at Center Column College II Tank – Corrosion Damage at Overflow College II Tank – Corrosion Damage to ceiling

Recommended Improvements and Schedule Scope: Recoat Tank Interior Remove Interior Ladder Install New Perimeter Vents Install Safety Grating at Roof Hatch Roof Joints Sealant and Caulking at Footing Perimeter Guard Railing Cathodic Protection System Schedule: Tank Shutdown: October 2, 2017 thru March 2, 2017 Construction Contract Start Date: September 27, 2017 Completion: March 31, 2017

Bid Results August 8, 2017 - only one responsive bid in amount of $1,442,000 was received. August 14, 2017 – Bid documents revised and rebids Solicited from: Cor-Ray Painting Company; West Coast Industrial Coatings, Inc. Paso Robles Tank, Inc. Spiess Construction, Co. September 6, 2017 – Four Bids Received Advanced Industrial Services, Inc. $960,900 West Coast Industrial Coatings, Inc. $1,081,084 J. Colon Coatings, Inc. $1,100,198 Cor-Ray Painting Co. $1,340,000 Engineer’s Estimate: $1,385,000 J. Colon Coatings, Inc. Pacific Tan & Construction, Inc. Advanced Industrial Services, Inc. Superior Tank Co., Inc. SCW Contracting Corp.

Recommendations Execution by the General Manager, or his designee, of the District’s standard form of contract with the lowest responsive bidder, Advanced Industrial Services, Inc., in the amount of $960,900; Rejection of all other bids received under Specification 1317W - Rebid, except the second lowest responsive bid; Execution by the General Manager, or his designee, of the District’s standard form of contract with Kennedy/Jenks Consultants of Temecula, CA in amount of $27,046; Administrative Award and Execution by the General Manager, or his designee, of the District’s standard form of contracts with the necessary consultants, contractors, and suppliers for construction of College II Tank Interior Recoating; and Appropriation of $1,371,800 to fund project construction implementation.

Contact Information Marc Serna, P.E. Director of Engineering (951) 928-3777 Ext. 4461 Email: sernam@emwd.org