FRESNO COUNTY WEST ANNEX JAIL
Project Site – Looking South
Aerial of Vehicle Sallyport Cooling Tower Emergency Generator Utility Trench
Central Plant – Water and Condenser Pumps
Central Plant – Chiller
Central Plant – Existing Systems above Chiller to be Demolished.
Central Plant – Existing Boilers.
Central Plant – Existing Boilers, Tank and Piping.
Central Plant – Boiler Room Electrical.
Central Plant – Existing Boiler Control Panel.
Central Plant – Existing Heating Supply Piping, Pumps and Controls.
Central Plant – 2nd Floor Landing (Looking North)
Central Plant – Existing Cooling Towers (West Elevation)
Central Plant – Existing 2nd Floor Electrical Room
Site – Southwest Elevation of Central Plant looking North
Central Plant – SW Corner @ Area for New Diesel Fuel Tank
Site – Lifts/Canopy at Loading Area SW Corner of Existing North Jail
Site – Existing Trash Area near Vehicle Sallyport (SW Corner of North Jail)
Site – Existing Vehicle Sallyport Existing Fuel Tank