Kloe plans for 500 pb-1 Since now up to mid/end 2003

Slides:



Advertisements
Similar presentations
KLOE GM Capri May 2003 K charged status report DE/Dx development vs PiD (next talk by E.De Lucia) →K e3 studies: initial design of efficiency measurement.
Advertisements

14 Sept 2004 D.Dedovich Tau041 Measurement of Tau hadronic branching ratios in DELPHI experiment at LEP Dima Dedovich (Dubna) DELPHI Collaboration E.Phys.J.
July 2001 Snowmass A New Measurement of  from KTeV Introduction The KTeV Detector  Analysis of 1997 Data Update of Previous Result Conclusions.
Debora Leone Institut für Experimetelle Kernphysik Universität Karlsruhe on behalf of KLOE collaboration Measurement of the hadronic cross section at KLOE.
Notes on offline data handling M. Moulson Frascati, 29 March 2006.
KLOE Offline Status Report Data Reconstruction MonteCarlo updates MonteCarlo production Computing Farm C.Bloise – May 28th 2003.
25/07/2002G.Unal, ICHEP02 Amsterdam1 Final measurement of  ’/  by NA48 Direct CP violation in neutral kaon decays History of the  ’/  measurement by.
MC/Offline Planning M. Moulson Frascati, 21 March 2005 MC status Reconstruction coverage and data quality Running time estimates MC & reprocessing production.
KLOE Computing Update Paolo Santangelo INFN LNF KLOE General Meeting University of Rome 2, Tor Vergata 2002, December
STATUS OF KLOE F. Bossi Capri, May KLOE SHUTDOWN ACTIVITIES  New interaction region  QCAL upgrades  New computing resources  Monte Carlo.
FNAL Users’ Meeting, 06/02/03, p. 1 Top and Electroweak Results from CDF Igor Volobouev LBNL for the CDF Collaboration.
K  group activities K + K - retracking features New vs Old : resolution future planning. Conclusion and outlook K + K - retracking features New vs Old.
Update on MC-04(05) –New interaction region –Attenuation lengths vs endcap module numbers –Regeneration and nuclear interaction –EMC time resolution –
Status of the KLOE experiment M. Moulson, for the KLOE collaboration LNF Scientific Committee 23 May 2002 Data taking in 2001 and 2002 Hardware and startup.
The KLOE computing environment Nuclear Science Symposium Portland, Oregon, USA 20 October 2003 M. Moulson – INFN/Frascati for the KLOE Collaboration.
Offline meeting Outcome of Scientific Committee Status of MC04 Proposal for a minimum bias EvCl sample Other offline activies: –Reprocessing –Dead wires.
Hadronic results from KLOE E. Santovetti (INFN – Roma II) for the KLOE Collaboration European Physical Society International Europhysics Conference on.
 0  5  Outline Event selection & analysis Background rejection Efficiencies Mass spectrum Comparison data-MC Branching ratio evaluation Systematics.
Electroweak and Related Physics at CDF Tim Nelson Fermilab on behalf of the CDF Collaboration DIS 2003 St. Petersburg April 2003.
M. Muniruzzaman University of California Riverside For PHENIX Collaboration Reconstruction of  Mesons in K + K - Channel for Au-Au Collisions at  s NN.
Offline Status Report A. Antonelli Summary presentation for KLOE General Meeting Outline: Reprocessing status DST production Data Quality MC production.
Semileptonic D Decays from CLEO and BELLE Yongsheng Gao Southern Methodist University (CLEO Collaboration) ICHEP04, Beijing, Aug. 16 ─ 23, 2004.
Progress on F  with the KLOE experiment (untagged) Federico Nguyen Università Roma TRE February 27 th 2006.
Status report of the KLOE offline G. Venanzoni – LNF LNF Scientific Committee Frascati, 9 November 2004.
Jet Tagging Studies at TeV LC Tomáš Laštovička, University of Oxford Linear Collider Physics/Detector Meeting 14/9/2009 CERN.
Status of the hadronic cross section (small angle) Federico Nguyen February 22 nd 2005  the 2002 data sample and available MC sets  trigger efficiency.
5 June 2003Alan Norton / Focus / EP Topics1 Other EP Topics Some 2003 Running Experiments - NA48/2 (Flavio Marchetto) - Compass (Benigno Gobbo) - NA60.
Computing Resources for ILD Akiya Miyamoto, KEK with a help by Vincent, Mark, Junping, Frank 9 September 2014 ILD Oshu City a report on work.
MC sign-off and running plans M. Moulson, 1 March 2004 Offline discussion Outline: Results of tests on new MC files Sign-off on production version What.
First results from CMD-3 detector at VEPP-2000 collider Budker Institute of Nuclear Physics, SB RAS, Novosibirsk, Russia September 2011 E.Solodov (for.
European Physical Society International Europhysics Conference on High Energy Physics EPS July 17th-23rd 2003 Aachen, Germany Camilla Di Donato INFN Napoli.
Status report on analysis of BR(K S  p + p - p 0 ) A. Antonelli, M. Moulson, Second KLOE Physics Workshop, Otranto, June 2002.
Paolo Massarotti Kaon meeting March 2007  ±  X    X  Time measurement use neutral vertex only in order to obtain a completely independent.
KLOE general meeting December 2002 Tor Vergata K charged status report DST production status New analysis items:  K + K - cross section/  line.
M. Martemianov, ITEP, October 2003 Analysis of ratio BR(K     0 )/BR(K    ) M. Martemianov V. Kulikov Motivation Selection and cuts Trigger efficiency.
Status Report on Data Reconstruction May 2002 C.Bloise Results of the study of the reconstructed events in year 2001 Data Reprocessing in Y2002 DST production.
Biagio Di Micco  mass measurement Systematics on   mass measurement Biagio Di Micco.
MINERνA Overview  MINERνA is studying neutrino interactions in unprecedented detail on a variety of different nuclei  Low Energy (LE) Beam Goals: t Study.
Biagio Di Micco  mass measurement   mass measurement blessing of the final result Biagio Di Micco.
Roberto Versaci Heavy Quarks and Leptons '06 – München / 26 1 New results from KLOE Roberto Versaci on behalf of the KLOE collaboration.
KLOE Results and Prospects for KS Physics
Update on the false-dead DC wire problem
KLOE at DAFNE The DAFNE facility Physics at a f-factory
KLOE offline & computing: Status report
Electroweak Physics Towards the CDR
the charged kaon lifetime
Status Report Fenfen An
Tracking performances & b-tagging commissioning
Status report on   f0  00
MC ’04-’05 objectives                                                       
Observation of a “cusp” in the decay K±  p±pp
KTeV Results on Chiral Perturbation Theory
Status of KLOE Status of the detector The y2000 data taking
M. Palutan, T. Spadaro, P. Valente Laboratori Nazionali di Frascati
Preliminary results on Ks  3p0 search......
G. Venanzoni-LNF KGM Frascati, 19 Dec 2006
KLOE General Meeting - LNF March,
Scalar mesons and d0-d2 at KLOE
Results from KLOE (1) First published papers (2) Analyses in progress
 Results from KTeV Introduction The KTeV Detector
The shad measurement at DAFNE collider
p0 life time analysis: general method, updates and preliminary result
VEPP-2000 plans for the study of the nucleon form factors
Hadronic results from KLOE
Experimental Measurement
Barva Maura - Università Roma Tre On behalf of the KLOE Collaboration
Update on LHCb Level-1 trigger
Prospects for quarkonium studies at LHCb
Physics with KLOE at DAFNE phase 2
Recent BESII Hot Topics
Presentation transcript:

Kloe plans for 500 pb-1 Since now up to mid/end 2003 (before restart of data taking) elements for a discussion G. Capon 11-Oct-2002

Items list 2002 milestones for GR1 analyse 2001 data for results : produce some (preliminary) results with full 2001+2002 statistics produce results on hot/advertised topics : sigma-hadronic, Vus, …. understand background effects on various analysises (think to next data taking, also to Dafne2 at high luminosity) Measure F branching ratios ( K+K-, KSKL, r p, h g ) and sF show use of dr. ch. ADC in some analysises give a measurement of e’/e at 10-3 precision KS  p e n F  r p F  P,S + g KS  p+p-/KSp0p0 KL p0 p0, p+p- sigma-hadr K+ m+ n/K+p+p0 Preliminary

Tasks and Options finish DST production for each physics stream WHICH DATA SAMPLE ? as a general rule full 2001+2002 statistics should be used ( analysis is faster now with DST) however some analyses could not want to use full statistics because : (AND increase of data does not help to reduce syst) the analysis is systematic limited 2002 sample has less background time constraint to reach a result for a presentation different data taking conditions (cosmic veto  T3 filter)

if full stat is used by everybody it would be convenient to define a data set common to all streams (with associated L at 1% precision) Denig  Nguyen all streams will be equally affected by machine backgd and one could have a unique MC simulation with background levels properly weighted to this corresponds the proposal to have a single very large (500 M evts) MC generation of Phi -->all OR define two different data sets for 2001 and 2002 respectively Preliminary studies of machine background effects : KSp+p-/KSp0p0 appears constant vs endcap hot rate also a0g2C 5g and h’2C 3g seem unaffected by machine background

offline software Datarec issues : Produce DST for charged kaon stream (  1 month) ad-hoc momentum corrections for charge asymmetry ( F  r p ) ? dr. ch. ADC analysis MonteCarlo issues : Define a DST format for MC events (banks for MC truth) add different background levels to generated events calorim thresholds simulation (available but not standard) New generators ( gg  p+p-, gg  m+m-……..) …… improve description of geometry, materials, wires sagitta, resolution tails drift chamber ADC simulation , pion/kaon interactions in calorimeter Analysis tools : direct use of ROOT (no n-tuples) ??

Hardware resources New hardware to be purchased (delivered by end year ??) : tape library drives upgrade : 40GB  60 GB (per cassette) 400 cassettes 3 TeraBytes of disk space (order to be sent) CPU resources seem adequate (?) if no reprocessing is needed Disk space : now could be limited next 3 Tbytes ordered should made life reasonable Tape library : compactification of  5100 cassettes is a big job (1-2 months…?)

Offline computing resources IBM 7026-B80 4-way 375 MHz MC & DST PRODUCTION 32 Sun CPU’s Sun Enterprise 450 4-way 400 MHz RECONSTRUCTION 84 IBM CPU’s ANALYSIS 8 Sun + 8 IBM CPU’s Tape/disk servers Local online disks: 1.4 TB Data acquisition Calibration work afs cell: 2.0 TB User areas Analysis/working groups Managed disk space: 3.0 TB 1.2 TB: Input/output staging Reconstruction MC/DST production 1.4 TB: Cache for data on tape DST’s maintained on disk Tape library: 220 TB 5500 40GB slots 12 Magstar drives 14 MB/sec each Planned upgrade to 60GB/cassette

Organization issues coordination : avoid duplication of work (etrigger, evtx, MC samples,…) Set priorities : ?? Work follow-up: WG meetings : 1-2 per month WG conveners and referees should follow closely the analysis (push for completion, react if man power is lacking) each analysis should produce a memo : only one, not too long or time expensive (less 20 pages) give enough details to allow a critical evaluation of the analysis if analysis approved : memo --> kloe note draft of publication paper can be prepared in the same time

Next conferences new topics (different from 2001 ones) should be presented : Aks, shadr, interferf+regen, K0 mass,KLgg, G(Fee,mm) ……. and significant upgrades of published analyses KS  p e n ; KSp+p-/KS  p0p0 (going on) each single B.R. F  f0 g (syst limited ?) ; F  a0 g F  h g, h’ g (including 2c 7g) Winter conferences (LaThuile, Moriond) Aks, interferf+regen, K0 mass, KLgg final result on F r p (2000 data) preliminary shadr at 2% precision ? , G(Fee,mm) Summer conferences branching ratio’s : KSp+p- , p0p0 , K+  p+ p0, m+ n, p+p0 p0 Final full stat results on shadr ? h decays, we must ask a presentation and specify the content

Summary of analyses - 2002 milestones today memo Paper draft Comments/goals Ksp e n 90 pb-1 (2001) 4 Dec Separate : p+e- n ‘; p-e+n ; Aks Ksp+p(g) /Ksp0p0 Syst reduced 0.7  0.2 % get sF ; no g spectrum F r p 16 pb-1 (2000) km274 Jan03 16pb-1 End03 full stat Study ISR effects – Br(wpp) Momentum bias F  h’g h’ 2C 7g (2000) km268 jan03 more MC, systematics evaluation, use part of 2002 F p0p0g F p+p-g F h0p0g Mid03 Full stat F p0p0g no man power: merge with F h0p0g ? KLp+p- Tag or vtx method KL 2p0 Ratio KL2p0/3p0 hadronic cross section 73 pb-1 (2001) Jan03 Small qg sample  ds(eepp(g))/dQ2 K+m+n/K+p+p0 mid03

Summary of analyses – others (not milestones) today memo Draft Comments/goals K0(K+) mass tracking pbs for K+ km271 4 Nov K0 mass only KLgg / KL 3p0 150pb-1 (2001) km272 Add 150 pb-1 2002 filtered KL regeneration interferometry 16 pb-1 280 pb-1 18 dec Merge the 2 topics.. Also t KL h  3g upper limit 140 pb-1 (2001) km267 jan03 Jan03 Br <  2 10-5 Xball < 1.8 10-5 unpublished h  p+p-p0 h  3p0 , p0 g g 16 pb-1 (2000) End03 Full stat - Dalitz plot parameters Charge asymmetry G(Fee,mm) 2002 scan Dec K+ cross section DST Prod (1 month) K+ e+np0 (Vus) Mid03 K+p+p0p0 , e+np0p0 Ventura Phd Thesis