Hon’ble Commission has issued Interim order dated 19/ directing :

Slides:



Advertisements
Similar presentations
ENQUIRY BY SRLDC TO VERIFY THE DETAILS OF DC & AG BY NTPC AND NLC STATIONS PETITION NO:- 67/2003 (suo motto) & PETITION NO:- 90/2005 (TNEB) CERC HEARING.
Advertisements

Line Efficiency     Percentage Month Today’s Date
RRF Mechanism ENERGY ACCOUNTING Western Regional Power Committee
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
FREQUENCY PATTERN DURING JAN 2007 Freq Profile 1-11 Freq Profile Freq Profile
CMD VISIT ON 16-JAN-03 DAILY FREQ COMPARISION JAN-02 & JAN DAYS FREQ COMPARISION JAN-02 & JAN DAYS FREQ JAN DAYS FREQ JAN-02 TYPICAL.
Load Forecast T SRINIVAS MANAGER SRLD C. LINKS PREAMBLE GENERATION ANALYSIS GROWTH OF I/C GROWTH OF I/C Vs DEMAND PHYSICAL INTERPRETATION ELECTRIC CONSUMPTION.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
W E L C O M E Power Grid Corporation of India Limited.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.
UI IN SR (FROM 01/01/03 TO 13/05/07) TOTAL UI TURNOVER :- 13,831 MU TOTAL UI AMOUNT DISBURSED:- 3,177 CR AVG WEEKLY TRANSACTION:- 61 MU AVG WEEKLY UI AMOUNT.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
CONFIRMATION OF MINUTES (AMENDED PARA) Director (Transmission ), KPTCL stated that on account of DC current entering the neutrals of various transformers.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
SYSTEM OPERATION AVG, MAX & MIN DRAWAL SHARE ALLOCATION INTER-REGIONAL IMPORTS 3D FREQ OCT-03 3D SR DEMAND FREQ COMPARISION OCT-02 & OCT-03 GENERATION.
FREQUENCY EVENTS NTPC (INJECTION - DC) ISSUES NLY – II STAGE 1 (INJECTION - DC) NLY – II STAGE 2 (INJECTION - DC) NLY TPS I (Exp) (INJECTION - DC) ULDC.
1 ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps ABOUT MW OF CAPACITY IS BELOW 300 Ps CUM. INS. CAP.
Issues for discussion ON INTERTRIP SCHEME AT TALCHER II Present Scheme has worked satisfactorily as per the Logic designed On number of occasions unit(s)
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND – % OF TIME NORMAL VOLTAGES THROUGH OUT THE GRID SYSTEM STRENGTHENING –GAZUWAKA.
LINKS ACHIEVEMENT SELF STARTING STATIONS SYNCHRONISING SUB-STATIONS SYNCHRONISING SUB-STATIONS.
Issue of Declared Capacity (DC), and Actual Generation (AG) by Generating Stations Hon’ble Commission has issued Interim order dated 19/ directing.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
UI IN SR (FROM 01/01/03 TO 12/08/07) TOTAL UI TURNOVER :- 14,596 MU TOTAL UI AMOUNT DISBURSED:- 3,434 CR AVG WEEKLY TRANSACTION:- 61 MU AVG WEEKLY UI AMOUNT.
INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058.
Southern Regional Power Committee Central Electricity Authority.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
OPEN ACCESS IN INTER STATE TRANSMISSION 29 TH MARCH TH MARCH 2004.
LOAD FLOW STUDIES TO DURING THE ABOVE PERIOD FOR EACH YEAR AND EACH QUARTER IN EACH YEAR MAXIMUM AND MINIMUM FREQUENCY OF A DAY.
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
Queries raised by Director (Tariff) on ARR and BSP Application of GRIDCO for FY on
Experience of R & M from Regulatory Perspective
SPOUSE LEADERSHIP DEVELOPMENT COURSE (SLDC) CLASS 68
Jan 2016 Solar Lunar Data.
Scheduling of Collective Transactions Through Power Exchange
Power Supply Scenario in the State of Himachal Pradesh
The Genie is Not Back in the Bottle
NARROWING OF FREQUENCY BAND – IMPLICATIONS THEREOF
Congestion regulations
Queries raised by Director (Tariff) on ARR and Tariff Application of CESU for FY on
Average Monthly Temperature and Rainfall
ABT & Frequency.

GRID STATUS – PRE - ABT Very wide Frequency fluctuations

Calendar Year 2009 Insure Oklahoma Total & Projected Enrollment
MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
National Institute of Wind Energy(NIWE)
Presentation transcript:

Issue of Declared Capacity (DC), and Actual Generation (AG) by Generating Stations Hon’ble Commission has issued Interim order dated 19/26.10.2005. directing : SRLDC to conduct an enquiry to verify the details of declared capacity (DC), actual generation (AG) in respect of the generating stations belonging to NTPC and NLC, during the period 28.2.2005 to 24.4.2005 and submit a report to the Commission latest by 10.11.2005.

Declaration of Higher DC Enhancement in the DC in case of Ramagundam STPS is there in the range of 30 – 60 MW with details as follows. MONTH AVERAGE NORMATIVE DC ( IN MW) AVERAGE ACTUAL DC ( IN MW) AVERAGE ADDITIONAL MAX. ADDITIONAL EXTRA AVAILABLE ENERGY TO CONSTITUENTS Dec-04 1817.87 1823.46 6 30 4.163 Jan-05 1934.00 1976.59 43 76 31.689 Feb-05 1984.60 51 34.001 Mar-05 1922.23 1983.50 61 45.591 Apr-05 1878.49 1910.26 32 56 22.873 May-05 1895.89 1937.95 42 31.287 Jun-05 1878.05 1914.04 36 25.918 Subsequent to the persuasion by SRLDC similar trend is being followed by Talcher STPS and enhancement of DC in case of Talcher STPS is in the range of 20-50 MW. Enhancing the availability at the pit head generating stations is a step in the direction of achieving maximum economy and efficiency.

Details of Actual Generation (AG) and Declared Capacity (DC ) The day-wise details of the AG and DC by the NTPC and NLC stations during the relevant period of 56 days ( i.e. from 28.02.2005 to 24.04.2005) . (i) No. of days when the generation level increased beyond 101% of DC in a day. (out of total 56 number of days) STATION RSTPS TALCHER ST2 NLCTPS2 (STAGE1) NLCTPS2 (STAGE2) NLCTPS1 (EXPANSION) No. Of days when AG > DC by 101% 37 (66.07%) 47 (83.93%) 2 (3.57%) 1 (1.79%) 16 (28.57%)

The Range and average of the daily actual generation over DC. No. of blocks when the generation level was more than 105% of DC . (out of total 5376 number of blocks) STATION RSTPS TALCHER ST2 NLCTPS2 (STAGE1) NLCTPS2 (STAGE2) NLCTPS1 (EXPANSION) No. Of blocks when AG > DC by 105% 3 (0.06%) 79 (1.47%) 8 (0.15%) 2 (0.04%) 161 (2.99%) The Range and average of the daily actual generation over DC. (During 28-02-2005 to 24-04-2005) STATION RSTPS TALCHER ST2 NLCTPS2 (STAGE1) NLCTPS2 (STAGE2) NLCTPS1 (EXPANSION) Range of AG over DC 98.66 - 101.78 97.59 - 101.42 99.21 - 101.05 97.69 - 95.13 - 102.81 Average generation over DC 101.00 101.01 100.73 100.33 100.67

Whether there was willful under-declaration by the Generating Stations Clause 2 of Regulations 24 on Terms and Conditions of Tariff 2004 wherein it is stated that for higher generation beyond prescribed limits the RLDCs shall investigate so as to ascertain that there is no ‘gaming’. Clause 29(1) of the Electricity Act which assigns to RLDCs the responsibility of achieving overall economy and efficiency in the region.

UI injection during the relevant period along with UI Rate STATION RSTPS (UNIT 1-6) NLCTPSII (STAGE1) NLCTPSII (STAGE2) NLCTPS1 (EXPANSION) TALCHER (STAGE2) EXPORT TO WR/ER IMPORT FROM UI Energy (MU) 42.37 9.14 30.00 4.04 17.54* 139 64 UI Rate (Paisa/Unit) 254 278 229 256 362 292** 225** * direct export to the WR/ER constituents under UI ** the UI Rate arrived is after accruing the interregional benefit. Average UI Rate IN SR = 238 Paisa (49.74 Hz.) Average UI Rate IN ER/WR = 302 Paisa (49.60 Hz.) Frequency Profile in SR : < 49.5 Hz. = 11.53%; < 50.0 Hz. = 91.12%; 49.0 to 50.5 Hz. = 99.84%

Ways and Means to tap extra generation The Hon’ble Commission during hearing on 6.10.05 on the above issue had intended that it is desirable that such extra generation must be tapped and any commercial issues/implications related to this can be brought to the notice of commission.