Particle Measurement Programme - Report

Slides:



Advertisements
Similar presentations
PMP Progress Since GRPE 55 GRPE 54 agreed a Roadmap of work to address concerns with ECE/TRANS/WP.29/GRPE/2007/8 ( adding particle number measurement to.
Advertisements

23 nm PN Key Messages (draft) Draft discussion document for PMP meeting 08 Jan 2014 PMP
PMP: SUB 23 NM MEASUREMENT RECOMMENDATIONS B. Giechaskiel, G. Martini Institute for Energy and Transport Joint Research Centre 3 April 2014.
Institute for Energy and Transport B. Giechaskiel, G. Martini
Revisions To Heavy Duty Validation Report General Numerous clarifications to text as requested at December meeting Partial flow systems referred to consistently.
Particle Measurement Programme (PMP) Progress update
GRPE 70th session PMP INFORMAL GROUP progress report TO GRPE
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans 4 th DTP Meeting Geneva 12 th January 2011 Chris Parkin.
1 The Result of Japan’s Round Robin Engine Test: Measurement of PM and PN 3/30/2009 PMP Informal Meeting National Traffic Safety and Environmental Laboratory.
PMPN Report to WLTP DTP 16 Jan 2013 Prepared by Caro Hosier Post 14 and 15th WLTP PMPN Meetings audio / web conferences.
REGENERATION ISSUES Institute for Energy and Transport Joint Research Centre B. Giechaskiel, J. Andersson, G. Martini 3 April 2014.
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans 7 th DTP Meeting Bern 12 th – 14 th September 2011 Chris Parkin.
PMP Progress Report Activities since GRPE 58 Heavy Duty Validation testing Exercise completed in October Draft report and draft proposal to insert PN measurement.
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans 5 th DTP Meeting Dubendorf 12 th – 14 th April 2011 Chris Parkin.
Laboratories included in the database  AVL  EMPA  MTC  TUG  Volvo  VTT  LAT  Shell  IFP  FFA.
Summary of the latest PMP related activities Giorgio Martini, Athanasios Mamakos* Institute for Energy and Transport Joint Research Centre * Southwest.
PMP: SUB 23 NM REVIEW B. Giechaskiel, G. Martini Institute for Energy and Transport Joint Research Centre 8 January 2014 GRPE-PMP
GRPE 71 ST SESSION PMP INFORMAL GROUP PROGRESS REPORT TO GRPE 8 Jan 2015 Informal document GRPE st GRPE, 8-12 June 2015,
Progress report from VTF Validation Phase 2 and Next Steps DTP-12, 16th January 2013, Geneva
Deliverable 10 Contents  Vehicles/engines  Diesel passenger cars  Gasoline (PFI-DISI) passenger cars  Diesel heavy duty vehicles  Diesel heavy duty.
37 TH PMP MEETING Institute for Energy and Transport Joint Research Centre B. Giechaskiel, G. Martini 7 Oct 2015.
PM and PN Emissions from Two Scania Euro V Engines Hua Lu Karlsson
Joint Research Centre the European Commission's in-house science service JRC Science Hub: ec.europa.eu/jrc 38th UNECE IWG PMP MEETING Exhaust emissions.
JRC 30 March Particle Measurement Programme Exploratory work & Validation Exercise (JRC) First Validation Exercise comparisons B. Giechaskiel, G.
Joint Research Centre the European Commission's in-house science service JRC Science Hub: ec.europa.eu/jrc 72th UNECE GRPE session PMP IWG Progress Report.
RDE PN-PEMS programme Progress Update F. Riccobono, B. Giechaskiel, P. Bonnel STU, IET, JRC, European Commission.
Joint Research Centre the European Commission's in-house science service NON-EXHAUST PARTICLE EMISSIONS.
WLTP - Validation Phase 2 (acceptability of the new test procedure)
PMP IWG Progress Report
PMP IWG Progress Report
43rd PMP-Meeting Rosa Delgado IDIADA 15/03/ /03/2017 TITLE
PMP IWG Progress Report
Electric Vehicles and the Environment (EVE IWG)
PMP IWG Progress Report
Laboratories included in the database
PMP Heavy Duty Validation Exercise
Technologies for low emission light duty powertrains
Institute for Energy and Transport B. Giechaskiel, G. Martini
Preliminary results of the OEMs HDV PN-PEMS validation study
76th UNECE GRPE session PMP IWG Progress Report
76th UNECE GRPE session PMP IWG Progress Report
Exhaust Emissions Light Duty-PMP-2017/2018 Sub23nm Round Robin
Light Duty-PMP-2017/2018 Sub23nm Round Robin
WLTP DTP PM-PN Subgroup Activity Report
PMP IWG Progress Report
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Additional evaluations at AVL
HD ENGINE RAW PN MEASUREMENT
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans
Report of 6th DTP Meeting to GRPE 9th June 2011 UNECE, Geneva (CH)
Exhaust Emissions Light Duty-PMP-2017/2018 Sub23nm Round Robin
Report of 6th DTP Meeting to GRPE 9th June 2011 UNECE, Geneva (CH)
The SAT will be given at ECHS on the dates below!
The SAT will be given at ECHS on the dates below!
McDonald’s Kalender 2009.
Inter-Laboratory Comparison Exercise CPC CALIBRATION
WLTP-DTP Subgroup Additional Pollutants VP2 Results
2300 (11PM) September 21 Blue line is meridian..
PMP – PN sub 23nm Route to transfer from ‘in case of urgent need’ into planned delivery into regulations PMP-48 Presentation from Technical Secretary.
WLTP-DTP Subgroup Additional Pollutants VP2 Results & Open Issues
Francesco Riccobono, Barouch Giechaskiel, Pierre Bonnel
McDonald’s calendar 2007.
PN Counting from Raw Exhaust via Fixed Dilution and PMP Round Robin Project JRC and ACEA.
Current status All European laboratories (except 3rd JRC measurement) have conducted their measurements Equipment finally returned to JRC US, Japanese.
McDonald’s calendar 2007.
PMP INFORMAL GROUP Exhaust particle emissions – progress report
ACEA and JRC PMP meeting 7/11/2018
PNC and VPR Validation PMP Meeting 30th March 2009
2015 January February March April May June July August September
Presentation transcript:

Particle Measurement Programme - Report GRPE-63-26 Particle Measurement Programme - Report Chris Parkin PMP Chairman

Current Status Following the conclusion of work on developing PN measurement procedures for Regulations 49 & 83, the PMP Informal Group was kept open for discussion of experience with the PN measurement procedures. Two active measurement programmes continue to run in the background Heavy Duty Round Robin programme Industry led, labs’ own PNMS, no Golden Engineer Volatile Particle Remover calibration Round Robin Investigating effects of aerosol material, aerosol generation method and test set-up on PCRF measurement

26th PMP Informal Meeting Held at JRC on 6th December Issues discussed were; VPR Calibration Round Robin progress and experience of 2 participating labs PNC Calibration & stability: JRC study, AVL and Scania experience European Metrology Research Programme Measurement of sub 23nm particles: UCR, TTM and JRC studies Heavy Duty Round Robin status

26th PMP Informal Meeting VPR Round Robin progress Lab Test Date Status JRC August 2010 Complete & data submitted LAT October 2010 AVL January 2011 HORIBA February 2011 EMPA April 2011 MATTER May 2011 Complete NPL September 2011 AEA October 2011 VW December 2011 MAHA February 2012

26th PMP Meeting PNC Calibration Experience AVL experience of calibrating 40+ PNCs: some non-linearity, but <+/-3% loss of counting efficiency found in some PNCs, restored by changing wick Scania experience: 4 PNCs failed calibration due to loss of counting efficiency, now instituting routine wick changes JRC study: investigated extending calibration v electrometer down to 300cm-3 by using double charged aerosol and increased flow rates Found counting efficiency dependency on aerosol even above D90

26th PMP Meeting European Metrology Research Project Work Package 1: developing standard aerosols (materials & generation methods) for PNC and VPR calibration. Delivering recommendations on; PNC linearity calibration aerosol, May 2012 (VPR pcrf) temperature resistant 30nm, 50nm & 100nm aerosols, November 2012 (PNC D50) Soot-like aerosols, May 2013 National standards, November 2013 PNC calibration Round Robin, May 2014

26th PMP Meeting Sub 23nm Measurement URC studies with range of pre-treatment and D50 PNCs on DPF diesel found: No 10-23nm particles post-VPR Significant 2.5-10nm particle concentrations post-VPR Initially, no 2.5-10nm particles post Catalytic Stripper, but, at high load, some appear over time Lab experiments showed Catalytic Stripper to be substantially more effective than a Thermodenuder at removing heavy HCs and Sulphuric Acid, plus some evidence sub 23nm solid particles can be formed in Thermodenuder TTM studies found significant sub 30nm, metallic particle formation on diesels & petrols. DPF c.99% efficient at removing these. JRC study with a range of D50 PNCs post VPR found: NEDC: 10-20% (GDI), 35-56% (PFI), 26-45% (DPF) [probably volatile?] in 10-23nm range. Few sub 10nm particles CADC: similar percentages in 10-23nm range. Also significant 4.5-10nm particles, but reduced at higher pcrf Further measurements including use of Catalytic Stripper in WLTP Validation 2 Summary: excluding volatiles below sub-23nm may challenge capability of current VPR, measurement below 10nm may not be possible. DPFs appear to effectively remove sub 23nm particles, but sub 23nm may be of interest for GDI and PFI.

26th PMP Meeting Heavy Duty Round Robin status Lab Status TUV Complete Ricardo NTSEL JARI NIER Volvo UTAC VTT Scania Environment Canada JRC Start of test mid-late January

Next Steps Next (possibly 2 day) meeting April/May 2012 Discuss VPR Round Robin results Discuss HD Round Robin results Update on ISO & EMRP Calibration Work GRPE view on sub 23nm particle measurement? PMP to act as forum for discussion of further studies? PMP to investigate potential measurement procedures? Improving calibration procedures Under consideration in WLTP-DTP-PMPN also. EMRP and ISO both active in this area. Discuss improvements to calibration procedures in joint PMP/PM-PN subgroup to meetings.