MICE Introduction.

Slides:



Advertisements
Similar presentations
The US 5 Year Muon Acceleration R&D Program To Boldly Go… MICE Collaboration Meeting Harbin January, 2009.
Advertisements

Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
Changing the absorbers: how does it fit in the MICE experimental programme? Besides the requirement that the amount of multiple scattering material be.
MUTAC Fermilab Alain Blondel 16 March Status of MICE MUTAC March 2006 at FERMILAB.
CHIPP Sept 2005Jean-Sébastien GraulichSlide 1 What is MICE  Muon Ionisation Cooling Experiment  What is Ionisation Cooling ? Cooling = Reduction of Beam.
Alain Blondel MICE: Constraints on the solenoids 2.Field Homogeneity: or ? this will be dictated by the detector requirements. TPG will be.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
MICE collaboration meeting Alain Blondel June MICE challenges organization global funding situation.
MICE Project Board Alain Blondel 1 MICE running Preamble ISIS running Step I Step(s) IV Step V (and VI)
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
MICE CMPB 3-Feb-2006 Alain Blondel 1 Status of MICE.
MICE Project Board MPB-I Alain Blondel 1 MICE Introduction Scientific Goals and How MICE operates.
MICE beam line review Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
MICE Funding agency committee meeting Alain Blondel 1 MICE: challenges, organization, global funding situation.
DPNC Sept 2007Jean-Sébastien Graulich MICE The international Muon Ionization Cooling Experiment o o Introduction o o Beam Line o o Cooling Channel o o.
MANX meeting 15 July 2008 Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment MICE in 2011.
CMPB Alain Blondel 14 April STATUS OF MICE.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
17 March 2005Edda Gschwendtner1 MICE Cooling Channel: Can we predict cooling to ? Edda Gschwendtner Challenge Systematics Cooling Channel Beam Line.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
CM37 Alain Blondel step IV physics success 1 « STEP IV operations : Physics »
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
Goals and Status of MICE The International Muon Ionization Cooling Experiment J.S. Graulich.
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
Particle Production in the MICE Beam Line Particle Accelerator Conference, May 2009, Vancouver, Canada Particle Production in the MICE Beam Line Jean-Sebastien.
MICE collaboration meeting Alain Blondel 27 – Welcome to the 10th MICE collaboration meeting. 1.Global neutrino factory situation 2.Possible.
MICE: The International Muon Ionization Cooling Experiment Ulisse Bravar University of Oxford ICHEP ‘04 1 MICE: The International Muon Ionization Cooling.
Paul Soler University of Glasgow MICE as a Step towards Cool Muon Beams for Particle Physics MICE Celebration Event RAL, 25 June 2015.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
MICE : the Muon Ionization Cooling Experiment M. Yoshida (Osaka Univ.) for the MICE Collaboration Osaka - Overview and Status -
Alain Blondel – introduction MICE CM Collaboration meeting June 2007 at RAL Complete review of the project Organization of efforts towards.
ICHEP 2012 Melbourne, 7 July 2012 Paul Soler on behalf of the MICE Collaboration The MICE Beam Line Instrumentation (Trackers and PID) for precise Emittance.
MICE collaboration meeting Alain Blondel october MICE collaboration meeting 13 at RAL News The international context Goals of the meeting.
Takashi Matsushita Imperial College T. Matsushita 1 MICE Status Excerpt from talks at MuTAC review:
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
MICE RF Workshop Alain Blondel MICE = critical R&D for neutrino factory and muon collider 1 neutrino factory: accelerate muons and store to produce.
MICE CC visit at CERN Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
MICE: The International Muon Ionisation Cooling Experiment MOPLT106 Abstract The provision of intense stored muon beams would allow the properties of neutrinos.
MICE CMPB Alain Blondel 1 Highlights on MICE.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
29 September 2006M.Sakuda NuFact06 Asian Regional Outlook (Japan) -by Y.Kuno (Osaka) (1) SuperBeam (T2K) (2) J-PARC current upgrade plan (3) T2HK or T2KK.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
CHIPP Aug 2010J.S. GraulichSlide 1 MICE and the Neutrino Factory Jean-Sebastien Graulich, Geneva.
- MICE - The Muon Ionization Cooling Experiment Jean-Sebastien Graulich, Univ. Genève o Introduction: Aims And Concept o Design o Infrastructure: Hall,
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
MICE RF review Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
MICE CM30 Goals of the Meeting Alain Blondel 1 MICE CM30 – Goals and Status.
CHIPP Oct 2007Jean-Sébastien Graulich Status of MICE Jean-Sebastien Graulich, Univ. Genève o o Introduction o o Beam Line o o Technical Design o o PID.
CARE08 Dec 2008Jean-Sebastien GraulichSlide 1 MICE, a facility for precision beams and muon cooling o MICE in EuCARD o MICE Facility: Beam, Infrastructure.
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
Alain Blondel 4 April  Aspirational MICE Schedule as of April 2008 Febuary-July 2008 STEP I September 2008 November 2008 to summer 2009 STEP II.
1 paul drumm; Date; Title …project report …more comments paul drumm february 2005.
(one of the) Request from MPB
MICE S TEP IV P HYSICS ‘D ELIVERABLES ’ V. Blackmore MAP 2014 Spring Meeting 30 th May, /15 AKA “What will we learn from Step IV?”
K. Long, 28 June, 2016 Introduction to MICE — and the role of the Hydrogen Delivery System.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
P. Dornan, K. Long, 2 October, 2016 MICE, the Neutrino Factory and the Muon Collider.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
Experimental Tests of Cooling: Expectations and Additional Needs
Accelerator R&D for Future Neutrino Projects
MICE CM31 Schedule summary
Alain Blondel 11 October 2010 GDR NEU2012 summary
(Muon Ionization Cooling Experiment)
Presentation transcript:

MICE Introduction

CERN – SPC panel report , SPC meeting, 16.03.2010 Figure 2 A representative compilation of sensitivities of some future long baseline projects. Here the fraction of dCP where CP violation can be observed at 3 standard deviations is plotted as a function of q13. T2KK: T2K 1.66 MW beam to 270 kton fid volume Water Cherenkov detectors in Japan (295km) and in Korea (1050 km); DUSEL: a WBB from Fermilab to a 300 kton WC in Dusel (1300km); SPL 4 GeV, EU-BB and BB+SPL: CERN to Fréjus (130km) project; NF bl is the Neutrino Factory baseline (4000km and 7000km baselines) and NF Py+INO represents the concrete baseline from CERN to Pyhasalmi mine in Finland (2285 km) and to INO in India (7152 km); PS2-Slanic is a preliminary superbeam study at 1500km based on an upgrade of PS2 to 1.66MW and a 100kton Liquid Argon TPC NEUTRINO FACTORY IS ULTIMATE NEUTRINO FACILITY FOR STUDY OF 3X3 OSCILLATIONS -- AND BEYOND -- CERN – SPC panel report , SPC meeting, 16.03.2010

Major challenges tackled by R&D expts High-power target . 4MW . good transmission MERIT experiment (CERN) Fast muon cooling MICE experiment (RAL) Fast, large aperture accelerator (FFAG) EMMA (Daresbury)

IONIZATION COOLING principle: reality (simplified) this will surely work..! reality (simplified) ….maybe… Difficulty: affordable prototype of cooling section only cools beam by 10%, while standard emittance measurements barely achieve this precision. Solution: measure the beam particle-by-particle A delicate technology and integration problem Need to build a realistic prototype and verify that it works (i.e. cools a beam) Can it be built? What performance can one get? state-of-the-art particle physics instrumentation will test state-of-the-art accelerator technology.

Liquid Hydrogen absorbers 1,2,3 measurement of emittance in and out 10% cooling of 200 MeV/c muons requires ~ 20 MV of RF single particle measurements => measurement precision can be as good as D ( e out/e in ) = 10-3 never done before either… Coupling Coils 1&2 Spectrometer solenoid 1 Matching coils 1&2 Matching coils 1&2 Spectrometer solenoid 2 Focus coils 1 Focus coils 2 Focus coils 3 m Beam PID TOF 0 Cherenkov TOF 1 RF cavities 1 RF cavities 2 Downstream particle ID: TOF 2 KL, EMR Variable Diffuser Liquid Hydrogen absorbers 1,2,3 Incoming muon beam Trackers 1 & 2 measurement of emittance in and out

Quantities to be measured in a cooling experiment Measurements of TRANSMISSION EMITTANCE REDUCTION EQUILIBRIUM EMITTANCE for the standard Study II optics are the main deliverables cooling effect at nominal input emittance ~10% STEP I demonstrated that beam line can deliver 3,,6,,10 mm other values can be reached by offline culling or reweighting equilibrium emittance = 2.5 mm curves for 23 MV, 3 full absorbers, particles on crest

Liquid Hydrogen absorbers 1,2,3 MICE Collaboration across the planet Coupling Coils 1&2 Focus coils Spectrometer solenoid 2 Spectrometer solenoid 1 m Beam PID TOF 0, TOF 1 Cherenkovs RF cavities RF power Downstream particle ID: TOF 2, KL EMR Variable Diffuser Liquid Hydrogen absorbers 1,2,3 Incoming muon beam Trackers 1 & 2

THE MICE COLLABORATION -130 collaborators- University of Sofia, Bulgaria The Harbin Institute for Super Conducting Technologies PR China INFN Milano, INFN Napoli, INFN Pavia, INFN Roma III, INFN Trieste, Italy KEK, Kyoto University, Osaka University, Japan NIKHEF, The Netherlands CERN Geneva University, Paul Scherrer Institut Switzerland Brunel, Cockcroft/Lancaster, Glasgow, Liverpool, ICL London, Oxford, Darsbury, RAL, Sheffield, Warwick UK Argonne National Laboratory, Brookhaven National Laboratory, University of Chicago Enrico Fermi Institute, Fermilab, Illinois Institute of Technology, Jefferson Lab, Lawrence Berkeley National Laboratory, UCLA, Northern Illinois University, University of Iowa, University of Mississippi, UC Riverside, Muons Inc. USA THE MICE COLLABORATION -130 collaborators-

Diffuser mechanism (Oxford) EMR plane (Geneva) RF Amplifier (Daresbury) MICE is a fantastic world-wide team effort! absorber windows (Mississippi) LiqH2 absorber (KEK) Coupling coil forged mandrel (Harbin China) RF cavities (Berkeley)

MICE proposal (Jan 2003)

These dates will be revised in this meeting see Andy Nichols talk

MICE Step VI (detectors, cables, couplers, etc… are not shown)

Comments on steps: STEPS were designed as a means to explicit -- the logical scientific steps to achieve the scientific goals -- a possible staging and assembly scenario, which at the time of the proposal made sense so that funding approval could be granted in phases. HOWEVER -- the scientific steps do not require the experiment to be assembled in VI distinct physical stages. For instance -- the physics of step II can be achieved in any of the following steps -- the physics of step III can be achieved in any following steps using empty absorbers and no RF acceleration etc…  Should be decided by the practical considerations  At the October 2010 collaboration meeting we decided that we could go directly to step IV thus skipping installation in step II and III if needed As a consequence step IV physics program is much augmented.  similar arguments could eventually be considered for step V vs stepVI

Where the experiment stands today we have now essentially completed step I (beam commissioning) -- generated beams suited for scientific goals -- performed first measurement of beam emittance with HEP detectors (TOF) -- experiment runs well (online, offline) but perfectible!  need completion of target system with 1+1 target  explore remaining possible rate increase  more ‘professional’ controls, software, etc… 2. the detectors are all built and operational except for EMR under construction will constitute most beam taking activity until summer 2012. 3. experiment has been delayed in various ways since 2007 -- decay solenoid OK now since April 2009 June 2010 -- target OK now since September 2009  step I was achieved between October 2009 and August 2010 -- Now: spectrometer solenoids -- next? IMPORTANCE OF THIS SCHEDULE REVIEW !

Additional information from MPB meeting of September 2010

From the MICE proposal Given that all detectors and parts of the equipment will not be ready at the same time, one can foresee a development of the experiment in time, to allow a number of preparatory stages. Step I The beam can be tuned and characterized using a set of TOF and particle ID detectors. Step II the first spectrometer solenoid allows a first measurement of 6D emittance with high precision and comparison with the beam simulation. This should allow a systematic study of the tracker performance. Step III is fundamental for the understanding of a broad class of systematic errors in MICE. The two spectrometers work together without any cooling device in between and should measure the same emittance value (up to the small predicted bias due to scattering in the spectrometer material). Step IV, with one focusing pair between the two spectrometers, should give a first experience with the operation of the absorber and a precise understanding of energy loss and multiple scattering in it. Several experiments with varying beta-functions and momentum can be performed with observation of cooling in normalized emittance. Starting from Step V, the real goal of MICE, which is to establish the performance of a realistic cooling channel, will be addressed. Only with Step VI will the full power of the experiment be reached and the deliverable delivered.

Other important by products along the way -- at step III, a spool piece allows easy insertion of slabs of solid materials to measure precisely their effect on beam emittance -- will test materials relevant to neutrino factory LiH, Carbon, Aluminum Titanium etc…(and simply plastic) (this could conceivably be done in step IV – will be discussed at CM28) -- at step IV and above, optics in FC can be explored to allow smaller beta functions (down o 5cm at 140 MeV/c) to test flip vs non-flip mode -- at step IV a wedge absorber can be tested in place of a flat piece to study effect of -- at step V and VI can test cavities with LN2 cooling to allow higher gradient (X V2) with same power

The specificities of MICE: MICE is a collaboration of accelerator physicists and particle physics experimenters MICE is international Hardware responsibilities: collaborators pay for what they provide. There exist collaborations for specific items: ex: Tracker is a collaboration between UK, US, Japan absorbers are a US-Japan collaboration EMR is a GVA-Como-Trieste-Fermilab collaboration There are no collaboration-wide shared expenses as could be found in large experimental collaborations and there is no common ‘bank’. Common fund is used to pay for consumables and contribution to MICE Hall personnel A few MOU’s have already been signed -- RF sources from Berkeley -- PSI solenoid A more global MOU is under preparation (M. Bonesini) The software, analysis etc… are freely shared items.

Very few changes of responsibilities since MICE proposal Most notable ones: Spectrometer solenoids were taken up from INFN-Genoa to LBNL in fall 2005 2. EMR was taken up from INFN-Trieste to Geneva in Jan 2009

Status of MICE Steps Color code Ready and operational Funded, under construction and essentially under control Funded, but late or problems/risks involved funded but major technical problem not funded

m STEP I data taking and analysis Apr09|Sep10 Muon beam line responsibility 2 dipoles 9 quads, PS, controls RAL, DL Decay solenoid PSI Decay solenoid cryo and PS, controls RAL Target system Sheffield, DL,RAL Target in ISIS success! New targets under construction – not closed Hall infra., shielding, beam stop detectors TOF0 and TOF1 MIB INFN, GVA CKOV A,B Mississipi KL calorimeter Roma3 INFN Front end electronics, DAQ, trigger GVA, INFN Control room MICE-UK Software MICE collab. Beam monitors FNAL, ICL, GVA Detector cabling and installation

STEP II/III/III.1 infrastructure Trackers Spectrometer SolenoidI&II Apr09|Sep10 Q3-Q4 2011 infrastructure RAL Trackers UK, USA, JP Spectrometer SolenoidI&II LBNL Magnetic measurements Fermilab or CERN-under discussion Magnetic probes NIKHEF TOF2 and TOF shielding INFN MIB, GVA Spool piece GVA Absorbers (LiH…) FNAL Software MICE EMR muon ranger GVA,FNAL, Trieste/Milano prototyped, under construction Power sub-station upgrade RAL, DL under procurement Safety equipment PPS  Sept 2010

STEP IV Liquid Hydrogen infrastructure and controls Focus coil magnet Apr09|Sep10 Liquid Hydrogen infrastructure and controls RAL Focus coil magnet RAL, Oxford FC Magnetic measurements CERN under discussion Liquid hydrogen absorber and instrumentation KEK Liquid Hydrogen and safety windows Mississippi Software MICE

STEP V 2012-2013 Apr09|Sep10 RF in Mag fied R&D MUCOOL NFMCC delayed by CC-0 RF cavities (1+4) LBNL 2 Coupling coils (MUCOOL+ MICE CCI) ICST-HIT, LBNL solution in progress. CCI Magnetic measurements CERN (Discussion) RF Power sources parts 4+4MW CERN, LBNL RF refurbishment 4+4 MW CERN, DL RF infrastructure 4 cavities DL, RAL Layout drawn Liquid Hydrogen infrastructure (II) RAL Focus coil magnet II RAL, Oxford FC Magnetic measurements UK Liquid hydrogen absorber II KEK Liquid Hydrogen and safety windows II Mississippi RF Shield Fermilab construction at FNAL Software, controls MICE (needs to design controls of cooling channel)

STEP VI >2013 Apr09|Sep10 RF cavities (4) LBNL Coupling coil (MICE CCII) ICST-HIT, LBNL CCII Magnetic measurements FNAL/CERN RF infrastructure 4 cavities DL, RAL Liquid Hydrogen infrastructure (III) RAL Focus coil magnet III RAL, Oxford FC Magnetic measurements UK Liquid hydrogen absorber III KEK Liquid Hydrogen and safety windows III Mississippi Software, controls (needs to design controls of cooling chanel)

MICE Organization Technical Board 12 Collaboration board Project manager: A.Nichols (RAL) management of project and Common Fund reports to EB +spokesperson +deputy +software coord. +level 2 WBS coordinators enforces design and safety reviews change control documents exp.design Collaboration board 1 rep/institute elects spokesperson reviews EB activity votes on decisions prepared by EB and CF chair: Alan Bross (FNAL) 3 Executive Board 12 spokesperson: A.Blondel deputy M. Zisman (LBNL) Project manager software coord. analysis coord. reps from UK,US,EU,JP manages collaboration life nominates personels reports to CB 3 collaboration meetings/yr 1 video conf/month Speakers bureau V. Palladino (INFN) Editorial board Dan Kaplan IIT ~3 ~3 Analysis forum Chair J.Cobb (Oxford) 24 controls quality of publications proposes publication policy solicits talks at conferences and proposes speakers

MICE OPERATIONS the MICE Operations Managers (MOM’s) are experienced MICE physicists who take a continuous rota at RAL (3-4 weeks at a time) to supervise MICE operations. delegation of safety from MICE project Manager (Andy Nichols) delegation of physics objectives from Spokesperson (AB) Work intensive and very demanding, during shutdowns and installation phases and even more during running phases. System has been in place since late 2007. For running periods: -- two shifters in the control room -- people in charge of relevant sub-components ensure on-call presence -- beam line expert (BLOC) on call Very nice results in Sept-December 2009 and June-August 2010

(these things have never been done before) Challenges of MICE: (these things have never been done before) 1. Operate RF cavities of relatively low frequency (201 MHz) at high gradient (16 MV/m) in highly inhomogeneous magnetic fields (1-3 T) dark currents (can heat up LH2), breakdowns see A. Bross 2. Hydrogen safety (substantial amounts of LH2 in vicinity of RF cavities) see M. Hills 3. Emittance measurement to relative precision of 10-3 in environment of RF bkg requires low mass and precise tracker low multiple scattering redundancy to fight dark-current-induced background excellent immunity to RF noise complete set of PID detectors And… 4. Obtaining funding and resources for R&D towards a facility that is not (yet) in the plans of a major lab

FUNDING The MICE project is approved and funded for all partners (except Bulgaria) -- Funding is subject to proposals/approvals with finite duration in a number of cases STFC approval/commitment to step VI but yearly review/atributions DOE 5 years plan + yearly attribution NSF: three year approval CH: 2 years proposals INFN review yearly main worry/difficulty across the project is shortage of manpower -- magnet expertise -- control room experts -- scientific/analysis manpower not helped by technical delays

*** leptonic CP violation *** Why MICE? Based on Muon collider ideas and development (Palmer et al, 92->), the Neutrino Factory concept (Geer, 1998) resonated in 1998 with the final demonstration of Atmospheric Neutrino Oscillations by the SuperK Collaboration. International workshops: NUFACT 99 (Lyon, France) NUFACT 00 (Montery, California) NUFACT 01 (Tsukuba, Japan) NUFACT 02 (London, UK) NUFACT 03 (Columbia,NY,USA) ................... NUFACT10 (Mumbai,India) 20Oct10  Neutrino Factory is the ultimate tool for study of Neutrino Oscillations -- unique source of high energy ne --reach/sensitivity better by order(s) of magnitude wrt other techniques (e.g. super-beams) for _ m+  e+ ne nm unique source of high-E ne ‘s * q13 * ** matter effects ** *** leptonic CP violation *** **** ne  nm and nt **** NB : leptonic CP violation is a key ingredient in the leading explanations for the mystery of the baryon-antibaryon asymmetry in our universe

MICE step I in the MICE hall

MICE HALL is all ready for step II-III