N. Blaskovic, T. Bromwich & G. Christian ATF to-do list N. Blaskovic, T. Bromwich & G. Christian N. Blaskovic FONT Meeting
Contents On-shift to-do list Multi-board data synchronisation Hardware and cable wish list N. Blaskovic FONT Meeting
To-do list Introduce delay cables after cavity to see if static erratic feature changes Diagnose IP BPM phase sensitivity Vary incoming LO phase Synchronously digitise bunch phase measured at stripline BPMs Once available, do IPC beamline tests N. Blaskovic FONT Meeting
Board synchronisation: option 1 Use FONT5 + FONT5A boards Run Doug’s ATF 2-board DAQ Observations: Empirically approximately synchronous Readbacks not available for FONT5A board SIS digitiser and ATF GUI not used N. Blaskovic FONT Meeting
Board synchronisation: option 2 Use FONT5A board + SIS digitiser Run standalone DAQ for FONT5A board Issue synchronisation signal upstream Observations: Integrates SIS digitiser operation Board synchronisation ensured Requires synchronisation signal to be sent to the IP and readback issued to Epics (Doug?) Requires ATF to save FONT Epics data N. Blaskovic FONT Meeting
Wish list 2 ZPULs (to replace broken ones) Mechanical LO phase shifter (slide 3) BNC-BNC cables 3 meter long SMA-SMA cables Long cables to delay cavity signals (slide 3) SMA-BNC connectors N. Blaskovic FONT Meeting