N. Blaskovic, T. Bromwich & G. Christian

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
N. BlaskovicFONT Meeting1 Preliminary resolution study results N. Blaskovic.
FONT Meeting1 Calibrations over IP LO power scan N. Blaskovic.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Wrap Up o Control and Monitoring o DDAQ o Interface between DDAQ and MCM o Infrastructure Jean-Sebastien.
FONT Meeting1 Waveforms with and without BPFs N. Blaskovic.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
D. R. BettFONT Meeting 5 th May Current DAQ State D. R. Bett.
N. BlaskovicFONT Meeting1 ATF February-March 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
N. BlaskovicFONT Meeting1 FONT5 board #2 DAC tests N. Blaskovic.
Feedback on Nanosecond Timescales (FONT) - Review of Feedback Prototype Tests at ATF(KEK) Glenn Christian John Adams Institute, Oxford for FONT collaboration.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
Installation and checkout of QBPM system Hardware to be installed –Install hardware in racks –Install CPU /SIS digitizers/VMIC 3122 analog digitizers/Digital.
FJPPL-FKPPL Workshop on ATF21 FONT digitisation studies of IP BPMs D. Bett, N. Blaskovic, P. Burrows, G. Christian, M. Davis, Y. I. Kim, C. Perry John.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
Requirements concerning the interface linking the BPM to the quadrupole M. Wendt, S. Zorzetti.
IP BPM Shift Report FONT Meeting: 22 December 2014 Talitha Bromwich.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
FONT Meeting1 Charge normalisation and IP LO power scan N. Blaskovic.
1Ben ConstanceFONT Meeting 1st August 2008 ATF2 digital feedback board 9 channel board with replaceable daughter board (RS232 etc.) − Board will log data.
N. BlaskovicFONT Meeting1 ATF October 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
IPBPM issues (Limitation of resolution) Siwon Jang (KNU)
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Low-Q IP-BPM Schedule Siwon Jang KNU. IP-BPM Schedule IP BPM schedule –Reference cavity (middle of October) Frequency tuning parts –Electronics (middle.
Superfast BPM Processor Scheme and First Results Stephen Molloy, QMUL 2 nd Mini-Workshop for Nano-Project at ATF.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
FONT Meeting1 3-BPM resolution with digital filtering N. Blaskovic.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
Philip Burrows ATF2 project meeting 1/07/101 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
Jitter Monitor – Overview and Status Report Glenn Christian, Alexander Kalinin 30 May 2005.
FONT GROUP MEETING ATF JUNE SUMMARY Neven & Talitha Talitha Bromwich - Friday, 26 June 2015.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
1 ATF2 Q-BPM Magnet Movers & 1 st Pulse Calibration Progress from May 7-11 J. May, D. McCormick, T.Smith (SLAC) S. Boogert (RH)
Overview of progress at FONT Neven Blaskovic TMD technologies CASE student John Adams Institute Oxford University.
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
ATF Meeting1 IP BPM studies with Honda’s electronics Neven Blaskovic with Wunghoa Park Oscar Blanco Alexis Gamelin N. Blaskovic.
1/33Mikey Davis24 January 2013 Review of 23 rd of January Shift.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
FONT Oxford FONT REPORT NOVEMBER Neven Blaskovic Kraljevic and Talitha Bromwich Friday, 27 November
Report on the progress of the 40MHz SEU Test System based on DE2 Board 20 Jan in CPPM Zhao Lei.
Superfast BPM Processor Scheme Stephen Molloy, QMUL Nano-Project Mini-Workshop at ATF.
D. BettATF Operations Meeting - 15 June IP C. Perry G. Christian Y. Kim D. Bett N. Blaskovic Kraljevic.
N. Blaskovic, T. Bromwich, R. Ramjiawan
Roundup of Week at ATF Mikey Davis 19 April /26.
Siwon Jang Hoyeong Jeong Glenn Christian Talitha Bromwich
N. Blaskovic, T. Bromwich, P. Burrows, G. Christian, C. Perry, R
In collaboration with P. N. Burrows, A. Latina and D. Schulte
Feedforward runs N. Blaskovic N. Blaskovic FONT Meeting.
Monitoring glitches in the frequency divider
ATF cable plan N. Blaskovic N. Blaskovic FONT Meeting.
FONT Meeting 10th February 2011
ATF Shift Plans Rebecca, Talitha 08/09/2017 Friday, 08 September 2017
March Trip Plan Mikey Davis 01 March /7.
Revised ATF Shift Plans
Progress towards nanometre beam stabilisation at ATF2
Intra-Pulse Beam-Beam Scans at the NLC IP
Progress towards nanometre level beam stabilisation
Head-Tail monitor Benoit, with the help of Christian Boccard and Ralph Steinhagen (BE/BI-QP)
Towards a ground motion orbit feed-forward at ATF2
Feed forward orbit corrections for the CLIC RTML
FONT stripline BPM resolution
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
VELA BPMs Alex Brynes.
Presentation transcript:

N. Blaskovic, T. Bromwich & G. Christian ATF to-do list N. Blaskovic, T. Bromwich & G. Christian N. Blaskovic FONT Meeting

Contents On-shift to-do list Multi-board data synchronisation Hardware and cable wish list N. Blaskovic FONT Meeting

To-do list Introduce delay cables after cavity to see if static erratic feature changes Diagnose IP BPM phase sensitivity Vary incoming LO phase Synchronously digitise bunch phase measured at stripline BPMs Once available, do IPC beamline tests N. Blaskovic FONT Meeting

Board synchronisation: option 1 Use FONT5 + FONT5A boards Run Doug’s ATF 2-board DAQ Observations: Empirically approximately synchronous Readbacks not available for FONT5A board SIS digitiser and ATF GUI not used N. Blaskovic FONT Meeting

Board synchronisation: option 2 Use FONT5A board + SIS digitiser Run standalone DAQ for FONT5A board Issue synchronisation signal upstream Observations: Integrates SIS digitiser operation Board synchronisation ensured Requires synchronisation signal to be sent to the IP and readback issued to Epics (Doug?) Requires ATF to save FONT Epics data N. Blaskovic FONT Meeting

Wish list 2 ZPULs (to replace broken ones) Mechanical LO phase shifter (slide 3) BNC-BNC cables 3 meter long SMA-SMA cables Long cables to delay cavity signals (slide 3) SMA-BNC connectors N. Blaskovic FONT Meeting