8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Injection test? Mike Lamont For initial discussion.
B.Goddard 08/11/04 HHH 2004 Workshop, CERN Beam Dump Brennan GODDARD CERN AB/BT The existing LHC beam dump is described, together with the relevant design.
LHC 30 th and 31 st July :10 Finish scrubbing fill 25 ns trains by operator dump. –No XPOC data … 08:40 Inject for another scrubbing fill 09:09.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Evian LHC BC workshop January LHC Injection and transfer lines Malika Meddahi, Brennan Goddard, Verena Kain, Jörg Wenninger On behalf of all.
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
The LHC injection systems located in points 2 and 8 are comprised of several elements common to the LHC ring and the downstream ends of the TI 2 and TI.
1 Interlock logic for LHC injection: intensity limitations Jörg Wenninger AB-OP-SPS Outcome of the join Machine-Experiments Workshop on Machine Protection.
What will we do for Beam Preparation: Injection and Beam Dump Jan Uythoven Thanks to M.Barnes, E.Carlier, L.Ducimetière, B.Goddard, R.Jones, Y.Kadi, V.Kain,
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
1 Beam Dumping System MPP review 12/06/2015 Jan Uythoven for the ABT team.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
18 July Reminder Dilution kicker system MKB is staged (2H, 2V) –Limits extracted intensity at 7 TeV to 50% of nominal –For 25ns spacing, this is.
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
LHC Injection Sequencing MD 16/23/2009 Injection sequencing / BCM R, Giachino, B. Goddard, (D. Jacquet), V. Kain, M. Meddahi, J. Wenninger.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
MPP Workshop: Injection System C. Bracco on behalf of ABT Acknowledgments: STI, ABP, BI,LHC and SPS OP.
Threading / LTC/ JW1 How difficult is threading at the LHC ? When MADX meets the control system … J. Wenninger AB-OP &
Aperture measurements during LHC commissioning 2017
LHC Beam Commissioning Meeting V. Kain & R. Alemany
Data providers Volume & Type of Analysis Kickers
The TV Beam Observation system - BTV
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Wednesday 8.9 External crossing angles:
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Surviving an Asynchronous Beam Dump?
The LHC Beam Dumping System
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
SPS extraction, transfer lines, injection
LHC Beam Dumping System Reliability Run Summary
MKD/MKB Review Meeting Scope and Definition
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Jan Uythoven For discussion
Saturday 21st April 00:33 Interlock during ramp on BLM HV
LHC Risk Review: Kicker Magnet Reliability
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Summary of week 7 Hardware Commissioning:
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday 14th March Second fill with pilot + 3 nominal bunches
Monday 11/07: Recovery Plenty of accesses.
Thursday morning – optics correction
Machine availability reaching well over 80%
CNGS Primary Beam Results 2010
Yesterday Issue of injection kicker not pulsing:
LHC Injection and Dump Protection
Beam Dumping System and Abort Gap
Dry Run 0 Week 13: BI test of...everything circulating beam: all fixed displays and BI applications OP directories for 2009, concentrators running Need.
Saturday 2/4/ :00-09:00 Problems with SPS:
Week 35 – Technical Stop and Restart
Monday February 28th 8h00: Injection
Planning at 5 o’clock meeting Friday
Chamonix 2006 – LHC Project Workshop
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
LHC dry-runs (BE-BI view)
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Can operation put the MPS in a unsafe state?
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
New page for summary of test status
Thursday Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting.
Thursday 10:00 Fill 1986 in stable beams.
HI2011 Commissioning Status
Presentation transcript:

Chamonix 2009 – LHC Performance Workshop Injection and beam dump B.Goddard TE/ABT On behalf of everyone involved B.Goddard Chamonix 2009 - LHC Performance

Acknowledgement The work described here is that of many people In particular, the following were instrumental in preparing and commissioning the systems, and have also supplied material directly for this talk Etienne and team, Laurent and team, Eric, Ilya, Jan, Jörg, Lars, Malika, Mike, Thomas, Verena The great efforts of the BI, CO and OP groups, together with all the other groups and teams involved at CERN, are also warmly acknowledged B.Goddard B.Goddard Chamonix 2009 - LHC Performance Chamonix 2009 - LHC Performance 2 2

Outline of talk Preamble Beam Injection Beam Dumping Strengths and synchronisation checks Local aperture measurements Injection stability Beam losses on MKI and flashover Beam Dumping Strengths and synchronisation Dump diagnostics SW, sequencing and operational aspects Lessons and changes for 2009 and beyond Conclusions B.Goddard B.Goddard Chamonix 2009 - LHC Performance Chamonix 2009 - LHC Performance 3

Injections – what was done Beam 1 (TI2/P2) Beam 2 (TI8/P8) Transfer line optics OK Still question of dispersion match Injected beam aperture OK (after vac. re-alignment) Kicker synchronisation OK (rough) Injection element strengths Beam instrumentation checks Check injection stability Started (data to evaluate) Interlocks Started Circulating beam aperture To do To do (TDI moved in - OK) Injection steering Started (rough) Kicker waveform measurement Detailed optics matching to LHC Injection protection systems setup Injecting onto Xing/sep bumps Abort gap keeper Maybe 40-50% through initial (pilot) beam commissioning B.Goddard Chamonix 2009 - LHC Performance 4

Injection element strengths and sychronisation MKI kicker strengths look perfect No trims needed at this stage MSI septum strengths look perfect But! Effect of pulsed leakage field found by Ralph S on circulating orbit (0.5 mm) Investigating powering in MSI DC (magnet, PC, controls, interlocks, …) SPS extraction and LHC injection kicker timing-in worked fine Dynamic destination implemented Rough injection kicker timing OK Noise on TL BCT signal made adjustment procedure tricky - upgraded for 2009 MKI kick waveform BCT (beam and kicker noise) B.Goddard Chamonix 2009 - LHC Performance 5

Injection region aperture measurements Single pass measurement using unclosed oscillations at various phases Very useful tools with madx online for preparation and visualisation All as expected, except at one location – VANMF.5L2 between MSI and Q5 Hot-spot with radiation survey (3 mSv/h) - 10 mm vertical realignment made 20/22 mm aperture of MSI protection device / MSI septa confirmed Still to check potential limits in vertical at D1 with MKI off (using RCBYV.4) Still to make circulating beam measurements at MSI & TDI Vertical aperture IR2 Vertical aperture IR8 (before vertical injection steering) B.Goddard Chamonix 2009 - LHC Performance 6

Injection steering and stability First steering done for B2, was initially several mm off in vertical (last slide) Nice convergence of autopilot algorithm To revisit including MSI and MKI strengths, and rechecking apertures Short-term (1 h) stability v. good at injection point (using screens in LHC) P8: measured RMS jitter for B2 of 0.27 / 0.13 nominal s H/V (c.f. ±1.5 spec) Upper limit on MKI kicker instability of about 1.7  10-3 (c.f. 5  10-4 spec) Still to measure MKI waveform with kick delay B.Goddard Chamonix 2009 - LHC Performance 7

MKI flashovers on MKI.C2 and MKI.D2 First flashover during SoftStart, after aperture measurements (MKI off) Pilot beam lost on aperture limit upstream Q5 (total of about 5e10) Subsequently added BLMs directly on MKIs Second flashover during beam passage (MKI on) Different type of incident – no preceding beam loss in the region Injected trajectory showed clear overkick of about 20% (40 mrad or 10 s) Demonstrates perfectly need for TDI….and for SoftStart Breakdown about 60% along magnet consistent with observations Still to decide interlocking strategy with BLMs MKI Frank Zimmermann Breakdown in Magnet D B.Goddard Chamonix 2009 - LHC Performance 8

Chamonix 2009 - LHC Performance Dumps – what was done Beam 1 (TD/UD68) Beam 2 (TD/UD62) Inject and dump setup OK Circulate and dump setup To do Dump region aperture Started (some phases) Detailed kicker synchronisation Extraction element strengths Started (corrected MSD) Beam instrumentation checks Started Interlocks (BPMSA, TCDQ, …) Sweep waveform measurement To do (parasitic looks OK) Dump protection systems setup PM and XPOC Tracking tests Started (2 sectors only) Abort gap keeper Maybe 10-20% through initial (pilot) beam commissioning B.Goddard Chamonix 2009 - LHC Performance 9

Dump element strengths and sychronisation MSD septum strengths looked OK after initial 200 mrad error corrected Required tunnel access to update lookup tables in Energy Tracking System MKD kicker strengths looked OK Extracted first attempts with correctors not MKD – but complexity for TD line BI MKB dilution kicker strengths looked OK parasitic sweep data taken for many dumps TSU locking and arming fine Rough timing in and synch. done - Injection prepulse - TSU RF lock MKD trigger MKD current TSU DPLLs locked to LHC b1 revolution frequency - Beam current - MKD current Inject and dump synchronisation B.Goddard Chamonix 2009 - LHC Performance 10

Dump region aperture measurements Performed first measurements from 00:00 to about 04:00 on 19/10 Did not finish them…problems with arming LBDS…then other problems Only a few phases checked for B1 6.5 s horizontal limit at TCDS to revisit (orbit, bunch timing in kick waveform) No obvious problems so far – and “loss free” extractions performed MKB VDDA TCDS MKD MSD B.Goddard Chamonix 2009 - LHC Performance 11

Dump diagnostics - XPOC Analysis Automatic XPOC analysis for MKD and MKB kickers now mature Throughout 2008 for reliability run, dry runs and commissioning Produced good results, including finding of some disconnected trigger cables Analysis of BI systems started with beam – mainly BTVDD screen Analysis results and references agree well – MKD/MKB strengths look OK Extended and updated for 2009 (see Jan’s talk) Raw data from BTVDD Reference trajectory Processed trace XPOC B.Goddard Chamonix 2009 - LHC Performance 12

Sweep characterisation and “asynchronous” dumps Already an interesting rogues gallery of different dumps Uncaptured beam, sweeps, different parts of kicker waveforms, unstable beams... Used XPOC analysis to check MKB sweep In process of correlating with losses at extraction elements and around LHC Will give experimental data for some of the simulations on failure cases Huge data sets - available tools for browsing logged BLM data are not adequate BTVDD XPOC 12th Sept 02h34 BLMs B.Goddard Chamonix 2009 - LHC Performance 13

Sequencing and special machine modes All sequences developed and tested for injection and dump systems Injection, SoftStart, arming, inject and dump, circulate and dump Improved versions now available (exception handling and error messages) Question of unskippable tasks etc. for MP critical systems to address Need to maintain, load and unload all required timing tables susceptible to error – any way to improve this? Inject and dump mode worked well Could dump both beams on 0th turn OK for bunch 1 in batch 1 – needs testing for other bunch numbers (particularly b2) Conceptual issue to fix on PM suppression (limits to ~20 turns instead of 1000) All implications of RF prepulse to be tested (e.g. rephasing for bucket selection) Circulate and dump mode worked well Dumped with timing event, up any time (in ms) Find better way to adjust injection – dump delay (presently clunky) B.Goddard Chamonix 2009 - LHC Performance 14

Other operational aspects These are complicated systems with a lot of dependencies Injection requires a lot of preparation for OP Injection kicker SoftStart Beam permit loops SPS and LHC modes LBDS arming Beam extraction from SPS Kicker-beam synchronisation check Beam to TED, TDI and into LHC OP frequently stressed or thwarted with SoftStart seconds running out Improved where possible for 2009 (‘better’ SoftStart - shorter, no ‘cheats’, improved arming and sequences, operator training planned) MKI application SW updated Will have first version of injection quality checks for 2009 Checking kickers, BLMs, filling pattern B.Goddard Chamonix 2009 - LHC Performance 15

Preparation in 2009 In 2008 we hit the ground running in Sector Tests and finally on September 10th Need to repeat this in 2009 Changes to systems to be checked and rendered operational Scheduling of TL beam tests already being discussed (June/July?) Dry runs should already be starting – will be late compared to 2008 No reliability run in 2009 – but a lot of updates/modifications/new HW/SW to validate Same people, teams and organisation (at our level…) Formalise interlock testing and/or acceptance? Any proposals for this wrt 2008? Schedule time for critical systems tests (energy tracking, BISLBDS link)? Machine checkout time for this evaporated under the 10/09 floodlights More details in Jan’s talk B.Goddard B.Goddard Chamonix 2009 - LHC Performance Chamonix 2009 - LHC Performance 16 16

Conclusions LHC injection and beam dump systems so far perform as expected Some concern about MKI flashovers with beam – devise strategy for operation Improvements made (sequencing, arming, SW) to make operations’ life easier Full XPOC and Injection quality check deployment needed All HW/SW changes since 2008 need thorough validation Commissioning measurement programs with beam started well To date no major issues found…but a lot of work here still to do Increasing intensity, abort gap cleaning and setting up of protection devices will be some of the main challenges Tools, techniques and teams have performed well Keep essentially same organisation for 2009 Some minor improvements of diagnostic and analysis tools needed TL and injection beam tests in 2009 will speed up ring beam commissioning Get these in schedule now (many dependencies: sort out impact) Systems Integration and Dry Runs being organised and scheduled Presently behind schedule wrt 2008 preparation (shutdown work impact) B.Goddard B.Goddard Chamonix 2009 - LHC Performance Chamonix 2009 - LHC Performance 17 17