Jan Uythoven For discussion

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

1 Commissioning ABT Equipment in the LHC Jan Uythoven ABT TCM 13/01/2015.
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
R.Giachino / M.Albert Be/op 5 April 2015 LHC Machine check out 1v1.
SECTOR TEST PREPARATION W. Bartmann, C. Bracco, J. Uythoven LIBD Meeting, 10-Feb-2015.
Mystery unable to inject: timing, BIS, SIS… 8:15 to 12: 30 Injection/LBDS studies  Fine delay adjustment of injection kickers  Synchronization of MKI.
Day ● 09:00-14:00: Collimation setup 3.5 TeV – Slowed down by losses induced by tune hump. – 48 collimators set up. – Beam dumped by ATLAS during.
Monday 4 th to Friday 8 th Technical stop  Coordination: Katy Foraz  Machine back to Operations Friday evening on schedule Major cryogenics intervention.
1 MKBH Erratic Jan Uythoven On behalf of the ABT team (Viliam, Nicolas M., Etienne, Laurent, Francesco etc…..) MPP meeting 8/5/2015.
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
The LHC injection systems located in points 2 and 8 are comprised of several elements common to the LHC ring and the downstream ends of the TI 2 and TI.
What will we do for Beam Preparation: Injection and Beam Dump Jan Uythoven Thanks to M.Barnes, E.Carlier, L.Ducimetière, B.Goddard, R.Jones, Y.Kadi, V.Kain,
1 Beam Dumping System MPP review 12/06/2015 Jan Uythoven for the ABT team.
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
LMC 27 November 2013 Status of LBDS LS1 activities and plans for 2014 reliability run Jan Uythoven for the many, many people working on the mentioned equipment.
Scrubbing Run: TDI, MKI and MKE interlocks Chiara Bracco, Jan Uythoven ABT/BTP Acknowledgments: T. Baer, M. Barnes, E. Carlier.
18 July Reminder Dilution kicker system MKB is staged (2H, 2V) –Limits extracted intensity at 7 TeV to 50% of nominal –For 25ns spacing, this is.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
Transfer Line Test preparation meeting V. Kain, R. Alemany.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
Commissioning / Reliability Runs / Dry runs 1 Jan Uythoven, LIBD meeting on LBDS Reliability Run 04/02/2014 Nov – Dec 2013 Commissioning individual MKDs.
R.Giachino / M.Albert Be/op 30 th March 2015 LHC Machine check out 1v1.
HL-LHC WP14 2 nd meeting: Intercepting devices and failure cases to be studied Anton Lechner, Jan Uythoven.
Session 8: What we will do for beam preparation in 2009 G. Arduini, R. Giachino 1Session 8 – Summary - GA24/02/2009.
Aperture measurements during LHC commissioning 2017
C. Bracco, R. Bruce, B. Goddard, C. Wiesner, A. Lechner, M. Frankl
LHC Beam Commissioning Meeting V. Kain & R. Alemany
The TV Beam Observation system - BTV
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Dependability Requirements of the LBDS and their Design Implications
Beam dump XPOC analysis
1st LHC MD Period Started
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
The LHC Beam Dumping System
Introduction: FCC beam dumping system
LINAC4 50 MeV phase BIS STATUS
MKD Waveform Measurements
SPS extraction, transfer lines, injection
LHC Beam Dumping System Reliability Run Summary
Injection BIS – next iteration
Chamonix 2009 – LHC Performance Workshop
LHC Risk Review: Kicker Magnet Reliability
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
A/N 26 16:00 Access finished problem with the BLM test. one crate is failing the beam permit test. Fixed. Access required in sector 78 for QPS to fix a.
Monday 11/07: Recovery Plenty of accesses.
Thursday morning – optics correction
Remote setting of LHC BLM thresholds?
LHC Injection and Dump Protection
Beam Dumping System and Abort Gap
Dry Run 0 Week 13: BI test of...everything circulating beam: all fixed displays and BI applications OP directories for 2009, concentrators running Need.
Saturday 2/4/ :00-09:00 Problems with SPS:
Week 35 – Technical Stop and Restart
Chamonix 2006 – LHC Project Workshop
Yesterday morning Held 1647 for a while – SPS kicker problem
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Can operation put the MPS in a unsafe state?
Jan Uythoven For the LBDS Team
Plan for 1 m b* J. Uythoven & J. Wenninger
Thursday 22nd March 00:20 – 02:40 on longer squeeze function, orbit and chroma correction at 4 TeV 2:40 – 5:30 second cycle with long squeeze 5:46 – 7:00.
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
HI2011 Commissioning Status
Presentation transcript:

Jan Uythoven For discussion LHC TL and Sector test meeting 9/10/2014 BETS tests for MSI, TDI and TCDQ Jan Uythoven For discussion

Beam Energy Tracking System BETS already existed during Run I on beam dumping system Main Bends, 4 sectors MKD, MKB and MSD (dump and dilution kickers, dump septum) Q4 quadrupole L/R 6 Run II: add similar system on MSI (injection septum) RMSI power converter has become an LHC type pc  ramp down These functions need to be defined as well together with OP, including degauss cycle to be applied TDI (Injection absorber) TCDQ (dump absorber) See also MPP meeting 19/7/2013: http://lhc-mpwg.web.cern.ch/lhc-mpwg/MPP-Meetings/No79-19-07-2013/NVoumard_BETS%20on%20MSI%20TDI%20and%20TCDQ_v2.pptx LHC TL & Sector tests, 9/10/2014 Jan Uythoven

BETS transfer function for MSI Change of transfer function to be done locally in the tunnel Transfer function to be checked by MCS Arming sequence for BETS on MSI not needed (standalone) LHC TL & Sector tests, 9/10/2014 Jan Uythoven

BETS on MSI Description Proposed procedure / actions: Works on absolute current Maskable interlock, connected to injection BIC Proposed tolerance 7 rad  1 sigma oscillation = 5e-4 tolerance on the MSI current Proposed procedure / actions: Preparation: Contact EPC and ask for current stability measurements (Hugues Thiesen) Set BETS transfer function to +/- 5e-4 relative error (Nicolas Voumard) Check we have rights to move the MSI current outside the above window MCS rights & trim rights Test: Close Injection BIS loop with MSI at nominal current. Move current of MSI outside tolerance window both ways and check each time the BETS stops injection permit Change BETSIM to 452 GeV and check injection BETS stops injection permit Check if MCS reference not correct, cannot arm injection BIS LHC TL & Sector tests, 9/10/2014 Jan Uythoven

BETS transfer function for TDI Change of transfer function to be done locally in the tunnel Transfer function to be checked by MCS Arming sequence for BETS on TDI not needed (standalone) LHC TL & Sector tests, 9/10/2014 Jan Uythoven

BETS on TDI Description Proposed procedure / actions: Works on gap between the two jaws To start with LVDT, 2016 on interferometry if all goes well Maskable interlock, connected to injection BIC Proposed tolerance ±1 sigma, about ± 0.6 mm Proposed procedure / actions: Preparation: Check stability of LVDT / interferometry gap measurement Set new BETS interlock window +/- 0.6 mm (Nicolas Voumard) Check energy limit used (+/- 1 GeV) Check we have rights to move the TDI (collimator role & MCS for BETS) Test: Close Injection BIS loop with TDI at nominal position. Move current TDI position outside tolerance window by moving first one jaw and then repeat with other jaw, check each time the BETS stops injection permit Set BETSIM to 452 GeV and check one cannot inject Check if MCS reference not correct, cannot arm injection BIS LHC TL & Sector tests, 9/10/2014 Jan Uythoven

TCDQ transfer function Change of transfer function to be done locally in the tunnel Transfer function to be placed in MCS BETS on TCDQ needed during the arming sequence of the LBDS LHC TL & Sector tests, 9/10/2014 Jan Uythoven

BETS on TCDQ Description Proposed procedure / actions: Works on absolute position of upstream and downstream side of jaw To start with LVDT, 2016 on interferometry Maskable interlock to BIS in point 6 Proposed tolerance ±1 sigma, about ± 0.XXX mm  to be determined Proposed procedure / actions: Preparation: Check stability position readings up and downstream Set new BETS interlock function +/- 0.XXX mm around ‘random’ reference function for up and downstream position (Nicolas Voumard) Check we have rights to move the TCDQ (collimator role & MCS for BETS) Test: At injection energy move TCDQ upstream outside tolerance window and check that interlock is generated. Repeat for downstream part of jaw. Repeat for both jaws at 6.5 TeV beam energy (real or BETSIM) Modify TCDQ ramp function so that requested position of one jaw is 2 x tolerance at 3 TeV, perform energy ramp (with nominal machine if available or with BETSIM) and check interlock is generated. Check if MCS reference not correct, cannot close BIS LHC TL & Sector tests, 9/10/2014 Jan Uythoven