News from Projects Lau Gatignon / EN-EA Input from F.Butin, Q.Bouirek

Slides:



Advertisements
Similar presentations
14 June 2007VELOEddy Jans 0 Recent VELO-installation++ activities June 14, 2007 Potmeter calibration Bake-out Cabling & Commissioning.
Advertisements

Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
ITS Subsystems Availability MACS Week, June 2011 E. Sargsyan PP a-ESA_ITS_MACS_Week_June2011.pptm E. Sargsyan ITS Subsystems Availability 1.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson 17 September 2015.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
East Area, M2, K12 Lau Gatignon / EN-MEF, EATM
AWAKE E. Gschwendtner, EATM, 1 July Highlights Since April 2015 Cabling, piping and rack installation campaign for the AWAKE facility has started.
ASTA Accelerator Directorate Review Project Plan and ES&H Carsten Hast May 20, 2014.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
ELENA EXTRACTION LINES W. Bartmann, D. Barna, M. Fraser, J. Jentzsch, R. Ostojic ELENA Commissioning discussion, 23th November, 2015.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
EHN1 – EN/EL Progress update J. Devine G. Gross 11/02/16.
EHN1 – EN/EL Planning Lighting _ Containment_ Cabling J. Devine G. Gross 11/02/16.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
EHN1 – EN/EL Progress update J. Devine 25/02/16. Integration – Jura Substation Position updated to avoid clash with door. Meeting next week for Civil.
Xbox and Structure testing news N. Catalan Lasheras, R. DeGiovanni, J. Giner-Navarro, G. Mcmonagle, I. Syratchev, B. Wooley, X. Wu
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
GIF in EHN1 - Vision 112/02/2014A. Fabich, EN-MEF-LE.
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
ELENA installation progress F. Butin / ELENA collaboration.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
POPS-B Project Update 07 June 2016 POPS-B: Project update and Feedback from POPS Experience LIU-PSB Meeting June 2016 Fulvio Boattini TE/EPC 2.
Report Technical Director Storage-Ring-Installation Completed
Areal RF Station A. Vardanyan
Report Technical Director Storage-Ring-Installation Completed
CC LLRF SM18 test plan and BA6 infrastructure
MEDICIS Safety Alarms Systems
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
Neutrino Platform Proximity Cryogenics 72th EHN1 Cryogenics Integration TE-CRG
Update on the Critical Path of the PS Booster Schedule for the EYETS
ODH Risk Assessment underground gallery B887-EHN1
Neutrino Platform Overall Protodune Risk Mitigation Plan O
Francois and Lau EATM 17 July 2012
EYETS David Hay EN-OSS.
EHN1 Extension planning
Dielectric Oil Installations
ELENA installation and commissioning status
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
LIU – EVM status and next steps
AD consolidation activities in LS2
Budget specification EHN1 Extension: Infrastructure (WG2)
on behalf of the RF group
EN-CV Progress EHN1 Extension Project
CE Status: Activities executed until 03/08 and ongoing
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
The ELENA Safety Documentation «time to prepare the safety clearance»
SPS Planning for the EYETS Meeting 8 (07/12/2016)
B245 Modifications & Cabling Update
EHN1 Neutrino Installation Plans
Status with crucial LSS5 kicker transmission line cables
Status of the cryogenic system for B180
Alexander Herlert, CERN (PH-SME-IS)
EYETS septa status Septa activities TE/ABT Thierry Masson
Teleconference ACS – FREIA 20th February 2018
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
ThomX – Commissioning Meeting – 25/01/2018
Tuesday 20 September 2011.
UPPSALA UNIVERSITY_GERSEMI PROJECT
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

News from Projects Lau Gatignon / EN-EA Input from F.Butin, Q.Bouirek EATM, 11 April 2017

ELENA (from F.Butin) The ion source is now operated at 85 kV (instead of 100 kV nominal), in the hope to keep some margin and save the HV transformer. Still with H- ions. Stable operation. The parameters of the injection line and septum + kicker  have been adjusted to improve injection parameters. The RF cavity voltage loop has been turned on, phase and amplitude are acting as programmed through LLRF and bunched beam is circulating, see attached. The tune measurement is not operating yet. The SEM monitor installed (readout not final) is behaving erratically, and not giving useful measurements yet. Out of the 3 other SEM’s present at CERN, 1 is leaking and needs to be repaired, 1 is in vacuum acceptance test, the other is waiting for this test.   We have 10 other tanks waiting but corresponding detectors are still in Japan. They are experiencing leaks with feedthroughs. There are no news regarding the e-cooler delivery schedule (expected in May-June ?). The 2 damaged LPU’s are being repaired at main workshop, expected back in May-June. The  installation of e-.cooler / LPU’s and SEM should ideally be synchronized to minimize down time, dates to be adjusted depending on availability ! EATM - News from Projects, 11-04-2017 Wobbling

Beam in ELENA: EATM - News from Projects, 11-04-2017 Wobbling

Overview EHN1_NP – from Q.Bouirek 3-March-2017 100% Overview 3-March-2017 EATM - News from Projects, 11-04-2017 Wobbling Gerard Cumer EN-ACE

EHN1 NP status EN/CV: Installation of the AHU on their platforms is done. Piping, air ducts, cabling and commissioning are following (April, May) EN/EA: XTDV tables are installed, beamline areas upfront of the pits are closed SMB: Structural follow up of the building (25/04/17) EP: Clean room metallic structure will arrive on the 12/04/17 Need to un-install some of the yellow fences, will be done from the 23/04/17 EP: Fire safety matrix et risk assessment will be on EDMS approbation soon EN/CV: Fire fighting network to be commissioned with firefighters EP, EN/EA: Cleaning campaign has to be realized at the end of the EYETS (preparation ongoing) SMB/SE: Access stairs to NP04 EATM - News from Projects, 11-04-2017 Wobbling

EN/EL May cabling campaign EN/EL : May cabling campaign contain: ODH in the clean rooms DI clean room NP02 Door top Cryostat [2] + building separation Evacuation + Alarm system Removal of the temporary alarm cables CV control AUG Lightning G. Gros needs the missing informations (DIC/DIR) as soon as possible EATM - News from Projects, 11-04-2017 Wobbling