Reaction fixture: What is working and not working

Slides:



Advertisements
Similar presentations
PLANT HVAC SYSTEMS DU-109-PP PLANT HVAC SYSTEMS.
Advertisements

©2012 Fluke Corporation SPRT Health 1 Health Monitoring of SPRTs.
MQXFS Coil Impregnation Procedure and Discussion 11/13/2014.
Engineer Presentation
Industrial Ventilation - A major control measure Dr. AA, UTM.
Raúl Morón Ballester TE-MSC-LMF
AW Rayment & TW Clyne Department of Materials Science & Metallurgy University of Cambridge, UK Design and Commissioning of a Chamber for Controlled Atmosphere.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 28 July 2003 Sam Burke UCSB HEP Group.
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
2013 NATEF Task Area A-7 Heating, Ventilation, and A/C A. A/C System Diagnosis & Repair B. Refrigeration System Component D & R C. Heating, Ventilation.
Learning, our way Examples of bad installation. CONTENT Installation related examples Installation related examples Application related examples Application.
Iouri Ivaniouchenkov RAL Safety considerations at RAL July 9, RAL MICE Collaboration Meeting 1.
The DUCTZ Experience. A Brief Overview of how DUCTZ Cleans a Heating and Cooling System.
Windows and Doors. Typically once the roofing material has been installed/completed the windows and doors are installed. It’s important to install these.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
Heat Exchange Ventilation Heat Exchange Ventilation.
INTRODUCTION. Function of Chillers Remove Cool Control Support.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
SQXF reaction cycle analysis Coils 001 and 101 N.Bourcey 07/11/2014.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O Pincot, X. Sarasola
Pressure-Enthalpy and the Variable Refrigerant Cycle
EGA Technical World Leaders in Combustion Management Solutions Mk7 EGA.
EGA Technical World Leaders in Combustion Management Solutions Mk7 EGA.
World Leaders in Combustion Management Solutions Module Gas Setup Introduction The Mk7 E.G.A Cell Status Further Information.
New Product Developments World Leaders in Combustion Management Solutions C.E.M.S., MCERTs & E.P.A. Exhaust Gas Analysers C.E.M.S., MCERTs.
Large Tonnage Chiller AC Screw. Content Mechanical System Key Components Control Logic Application 2.
Solar Cells need a top side conductor to collect the current generated They also need a conductive film on the backside.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Installation of the T600 at Fermilab CSN2, September 22,
Can we change a magnet without warming-up a full arc ? Serge Claudet, With help from P. Cruikshank & J-P. Tock (Chamonix Jan’10)
3.0 Comprehensive Performance Audit Fossil Fuel Appliances Health & Safety 3.2.
Day 2 Part 2 Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – August 2010 eere.energy.gov Duct Sealing and Insulation TRAIN THE TRAINER WEATHERIZATION.
7 A/C System Components, Operation, and Service.
Warm Girder UHV Components John Heckman Anthony DiPette Vacuum Group 2/29/2016.
SPS High Energy LSS5 Thermal contact & cooling aspects
Liverpool March 09 Irradiation Meeting. Graham Beck (QMUL) 1 Dissipated Power: Sensor (at -10C, 200V bias, after protons/cm 2 ) ~ 1W (×3 for.
Long coil manufacturing plan and QC at CERN F. Lackner, P. Ferracin, H. Prin, M. Duret, F. Savary, L. Favier, S. Triquet, S. Luzieux, R. Principe, C. Scheuerlein,
Mike Andrews January 31, Weeks Activities Target Pile Fan Upgrades Install piping for new cooling coil units Install controls for new coil.
Solar Cells need a top side conductor to collect the current generated They also need a conductive film on the backside.
AIR COOLING & PROFILOMETRY OXFORD SYSTEM IMPLEMENTATION P.A. COE – OXFORD THURS 08 SEPT 2016 AIR COOLING & PROFILOMETRY.
Automotive Heating And Air Conditioning
Part 4 Technician’s Guide & Workbook for Duct Diagnostics and Repair
CONFINED SPACE ENTRY TRAINING PROGRAM
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
14 Refrigerant Recovery, Recycling, and Recharging.
protoDUNE – single-phase Instrumentation - Gas Analyzers
1.3-GHz Cavity Vacuum Furnace at IB4
Overview – Nb3Sn Furnace
Operating SRF systems reliably in a “dirty” accelerator
FCC 16 T dipole 4578 dipoles + 5 % spares : 4807 dipole magnets
Functional specification for the consolidated LHC dipole diode insulation system and consolidation strategy C. Scheuerlein on behalf of the LHC dipole.
Internal review of the 11T dipole reaction fixture and impregnation mould Outcome of the meeting F. Savary 19 October CERN.
It can be as easy as turning down a thermostat.
The 11T cryo-assembly: summary of design and integration aspects
AC Repair & Furnace Repair - Tips To Consider
Insertable B Layer Cooling System
Recirculating CO2 System
Nabertherm P 300 HT Oven Classification: Internal © Statoil ASA
______________ Combustion Engine
Ventilation Measurement Tracer Gas Decay Testing
Rajan Bhandari Senior Lecturer
CONFINE SPACE.
HAZOP Guidewords Base Set
SAFETY, TOOLS & EQUIPMENT, SHOP PRACTICES
Instructions: Adding refrigerant fluid to system
Presentation transcript:

Reaction fixture: What is working and not working Placing coils on baseplate - working Placing of outer layers - tricky, especially seal foil Placing of blocks – mixed (easy with Cu-coil; seal foil moving) VAMAS sample placed loose Interference of mandrel overhang with splicing tool – okay Argon guide: Current setup likely only mildly (throughput only in short cut) To edit speaker name go to Insert > Header & Footer and apply to all slides except title page

Furnace: What is working and not working + Fan design was improved from previous design for more robustness and improved cooling - Cooling traps were increased, however the degazing has damaged the Metrotec sensors Research for adequate filtering methods is ongoing New Ar piping foreseen on the door entrance, implemented and tested in 927 - No vacuum furnace / no evacuation at RT Calibration of TCs during next service intervention when switching to type N TCs TC feedthrough on retort door with improved sealing, implemented and tested in 927 Cooling chiller already connected to the CERN emergency power line, planned for control system and fan Improving Ar flow by replacing U-beams or implementing holes on these girders …

F. Lackner & P. Revilak, RHT / internal review

Ventilation: F. Lackner & P. Revilak, RHT / internal review

F. Meuter, C. Scheuerlein, 19. Oct. 2016 Measurement of the oxygen content in the Ar inert gas during Nb3Sn coil reaction heat treatment in the GERO GLO750KE furnace F. Meuter, C. Scheuerlein, 19. Oct. 2016

Mobile oxygen analyser Metrotec GSM-touch and calibration gas system ZrO2 solid electrolyte sensor. Can only be connected when the gas is “clean” (before starting the HT) Calibration gases with 10 ppm and 500 ppm are available.

O2 content evolution during Ar purging of the retort of the GERO GLO750KE furnace measured with the GSM-touch O2 content was measured during purging of the GLO750KE retort (V=4.15 m3) with an Ar flow rate of 11000 l/h. First Ar purge started 15.9.2016 with ambient air in the retort. Second Ar purge continued the 19.9.2016 with 50400 ppm O2. With a flow rare of 11000 l/h one retort gas volume is exchanged every 23 minutes. The dashed line shows the expected O2 evolution, assuming that O2 content is reduced by a factor after each gas exchange.

ZrO2 solid electrolyte sensor contamination problem The presently installed condensation traps are not efficient in removing the contamination released during the coil reaction HT. Additional filters need be installed to protect the sensors (to be tested).

The sensors installed at the GERO GLO750KE furnace The Metrotec A15E sensors have been shipped to Metrotec. Waiting for an offer to repair or replace them. After repair they will be used to continuously monitor the oxygen content at the gas exit of the retort and of the reaction fixture exit. A more robust sensor type (thermal conductivity analyser) will be added as an interlock.