2012 Operating Experience for Feedwater and Related Systems

Slides:



Advertisements
Similar presentations
Generic Pressurized Water Reactor (PWR): Safety Systems Overview
Advertisements

BeginningNext SlideBack End Program AVADAL 1 of 21 SK-1 Roller Apron Segment Overview.
Institute of Nuclear Power Operations 2011 Operating Experience for Feedwater and related Systems Mike Ballard – INPO ER Group © 2011 Institute of Nuclear.
Automation I. Introduction. transmitter actuator Structure of control system Process or plant Material flow sensorstransducers actuating units actuating.
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
Calvert Cliffs A Case for Change Thomas Trepanier Constellation Energy Nuclear Group Plant General Manager, Calvert Cliffs Nuclear Power Plant.
ACADs (08-006) Covered Keywords Pressurized Water Reactor (PWR), Boiling Water Reactor (BWR), primary loop, reactivity, reactivity control, reactivity.
Summer Co-op Experience: OPG Aditi Garg. Darlington Nuclear G.S Located in Bowmanville, ON.
NRC Perspective of Recent Configuration Management Issues Tom Farnholtz Chief, Engineering Branch 1 Division of Reactor Safety, Region IV June 2014 CMBG.
KLINGE’S NMR 262 Two Independent Systems Integrated into one Unit This Requires Special Features:  Total Redundancy of Refrigeration Components  Total.
LFR plant assessment against a Fukushima-like scenario Technical Workshop to Review Safety and Design Aspects of European LFR Demonstrator (ALFRED), European.
Walter G Bischoff Brunswick station Duke Energy
1 Oil oxidation impact on Feed pump and turbine performance Presenter: Walter Bischoff.
January 24, SA12-PE-04 Purpose and Scope The purpose of this self assessment is to conduct a multi-discipline team review (deep dive) of the Feedwater.
Introduction to Hydraulics ClassAct SRS enabled. In this presentation you will: identify the fundamental parts of a hydraulic system and safety issues.
W Reliability Centered Maintenance w Day II w Salih O. Duffuaa.
NEIL Requirements for Testing of FWH Electrical Equipment and AOV’s.
Oconee RPS/ESPS Digital Upgrade Presented by: Michael Bailey June 3,
HP/LP BYPASS SYSTEM FUNCTION:
Troubleshooting Electric Control Devices
Cook Nuclear Power Plant
CHAPTER 4 CPB 20004: Plant Utility n Maintenance
1st Qtr Results and Outlook/ / Confidential KGM / 1 Improving Feedwater Regulation Performance Using a System Based Approach FW Systems User’s.
Eric Backus FW System Engineer Exelon - LaSalle Station FSRUG Executive Board Member.
DECEMBER 2010 ISTOG MEETING NEW Q & A CARD DISCUSSION.
FSRUG Presentation – January 2014 Tennessee Valley Authority Browns Ferry Nuclear Plant Unit 3 Reactor Feed Water (FW) Clean Up Piping Break.
Feedwater System Reliability Users Group – 2012 Meeting Power Uprates & Feedwater Heaters 1.
TVA Sequoyah and Watts Bar Nuclear Plants
IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN.
ACADs (08-006) Covered Keywords Containment Isolation, actuation logic, Description Supporting Material
A smart signalling system for Indian railways Smart signalling system – user’s view Full capacity realisation Flexibility of movements Easy to operate.
MSR Effects Upon Secondary Cycle. ## # 666 Heater Drain Pump Main Steam Main Turbine #6 FWH MSR #5 FWH #4 FWH MOV Drain Tank Manual Valve AOV Note: Most.
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
Harris Plant - Heater Drain System Transients INPO ICES # HNP Root Cause Evaluation
Harris Plant – Loss of Main Feed Pump Lube Oil INPO ICES # HNP Root Cause Evaluation
System Monitoring at the DAEC SysMon SMART Teaming up to get the most out of System Monitoring!
"... To design the control system that effectively matches the plant requires an understanding of the plant rivaling that of the plant's designers, operators,
IAEA International Atomic Energy Agency INTRODUCTION Module 2.
IAEA International Atomic Energy Agency AGEING MANAGEMENT ASSESSMENT Module 9 Session 9 Resource document: AMAT Guidelines, Reference document for Ageing.
Failure Modes, Effects and Criticality Analysis
Intelligent Maintenance Program
Reliability and Performance of the SNS Machine Protection System Doug Curry 2013.
Version 1.0, May 2015 BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study This material was prepared by the IAEA and co-funded by.
Temperature Test Allows monitoring of temperature changes.
Unit 13 Oil-Burning Equipment
EP4P03 Nuclear Power Plant Systems and Operation
EP4P03 Nuclear Plant Systems and Operation
Defense-in-Depth and Mitigative Measures
TURBINE CRANES NEA36 Turbine Crane.
DCPP Performance Based on NRC Performance Indicators
Professor Robert L. Heider, PE
Mild Environment Qualification and Maintenance
How SCADA Systems Work?.
INTRODUCTION TO ELECTRONIC INSTRUMENTATION
Embry-Riddle Aeronautical University
NRC CM Pilot Inspections Methodology and Results
Fans & Heaters technical seminar
Fuel Supply System Service
Automation Topics: Elements of an Automated System
ENTERGY FLEET FEEDWATER SYSTEM VULNERABILITY REVIEW
Leveraging Glass Panel Simulator Usage
Charge 2. Equipment Protection 3. Definition and Documentation
EQUIPMENT RELIABILITY AT KOEBERG
HAZOP Guidewords Base Set
Unit I Module 3 - RCM Terminology and Concepts
BASIC PROFESSIONAL TRAINING COURSE Module VII Probabilistic Safety Assessment Case Studies Version 1.0, July 2015 This material was prepared.
BASIC PROFESSIONAL TRAINING COURSE Module XX Regulatory control Case Study Version 1.0, May 2015 This material was prepared by the IAEA and.
Mikael Olsson Control Engineer
Presentation transcript:

2012 Operating Experience for Feedwater and Related Systems Discuss WANO Indicator – Based on Auto only per 7000 hrs. This data is ALL Unplanned While Critical Mike Ballard – INPO ER Group © 2013 Institute of Nuclear Power Operations

© 2013 Institute of Nuclear Power Operations

© 2013 Institute of Nuclear Power Operations

© 2013 Institute of Nuclear Power Operations

© 2013 Institute of Nuclear Power Operations

© 2013 Institute of Nuclear Power Operations

General Comments on 2012 Scrams Tied 2011 for fewest scrams But equipment scrams significantly increased from 40 to 53 (fewer scrams by external causes and Hu error) BWR scrams increased in 2012 from 20 to 29  PWRs continued the 3 year decline from the peak in 2010  © 2013 Institute of Nuclear Power Operations

2012 FW Scrams 13 FW in 2012 (compared to 9 in 2011 and 15 in 2010) Five scrams were from SPVs not mitigated or with bridging strategies. Most were known SPVs. Four attributed to problems with FRVs. Nine occurred below 100 percent power. Three Scrams attributed to gaps in maintenance and work instructions. © 2013 Institute of Nuclear Power Operations

2012 FW Scrams Half the scrams had previous industry OE. One scram attributed to operations error. One scram caused by no PM strategy. One scram from a longstanding problem not corrected in a timely manner. © 2013 Institute of Nuclear Power Operations

SPV FW Scrams Contaminated shuttle valve in positioner housing for FRV (SPV? – some stations have dual positioners) Three element circuit card and FWP control loop malfunction (SPV?) 7300 card failed. Digital FW control system project delayed with no mitigating strategy. Degraded resistance film transducer on postioner feedback mechanism - replaced with noncontact positioner FWPT control SPV not mitigated in timely manner - project delays © 2013 Institute of Nuclear Power Operations

Maintenance related FW Scrams Three Scrams attributed to gaps in MA and work instructions Instrument air to an AOV fitting failure Inexperienced MA technicians performing ST and inadequate procedure Inadequate FW pump turbine rebuild and gaps in work instructions © 2013 Institute of Nuclear Power Operations

Feed Reg Valve related scrams Degraded instrument air quality Actuator malfunction Degraded resistance film transducer on postioner feedback mechanism - replaced with noncontact positioner Maintenance related HU error © 2013 Institute of Nuclear Power Operations

PM related FW Scram FRV malfunction caused by high contact resistance on FW control channel selector switch resulted in the loss of feed water flow signal for a short duration. This switch had been in service for over 40 years. The cause was the failure to recognize the need for PM for low voltage control switches based on the PM Basis template. © 2013 Institute of Nuclear Power Operations

Other Notable 2012 FW OE The 2A and 2B Feedwater Heaters (FWH) shells were had through-wall failures during outage inspections. Trending of FWH levels and control valve position did not show any indications of an adverse trend in either FWH. No changes in thermal performance occurred in either FWH. Failures were found along the heater underside. Based on the wear profile along the internal surface of the FWH shells, the primary cause of failure has been attributed to Flow Accelerated Corrosion (FAC) wear. © 2013 Institute of Nuclear Power Operations

Other Notable 2012 FW OE During surveillance testing, a feedwater check valve failed to stroke fully closed as evidenced by low differential pressure across the valve. The valve was declared inoperable and the required to be in Mode 4 within 18 hours was subsequently met. The cause was mechanical binding. A  previous 8Y PM had been mistakenly retired and was not identified by engineering © 2013 Institute of Nuclear Power Operations

Other Notable 2012 FW OE UNUSUAL EVENT DECLARED when a fire was detected at one of the running feedwater pumps. Reactor power was lowered to 62. The fire appeared to have started from oil soaked lagging. © 2013 Institute of Nuclear Power Operations

Other Notable 2012 FW OE BOP AOVs High level in a feedwater heater caused the FWH string to isolate. Power was reduced to 89%. The cause was a faulty level indicating controller. Min flow recirc valve spuriously opened causing low FW pump suction alarms and tripped a pump, and power reduction to 55%. A rapid load reduction occurred when a heater drain tank level control valve began controlling erratically and failing closed. Severe internal damage was found from misalignment. PMs did not include replacement of the upper and lower stem bushings © 2013 Institute of Nuclear Power Operations

Equipment Reliability Process Top Level Diagram Performance Monitoring Scoping & Identification of Critical Components PM Implementation Corrective Action Life Cycle Management Continuing Equipment Reliability Improvement Equipment Reliability Process Top Level Diagram © 2013 Institute of Nuclear Power Operations

Gaps in AP913 Implementation contributing to the events Life cycle management – single point vulnerabilities not mitigated – Engineers can be advocates for identifying and driving resolution in assigned systems PM implementation – system engineers ensure components are accurately classified and own the PM basis for critical components © 2013 Institute of Nuclear Power Operations

Gaps in AP913 Implementation contributing to the events Corrective Action (CA) – Many of the FW events occurred previously. System engineer’s role is key to: Learn from OE and implement timely CAs. Find direct and underlying causes and implement solutions that address the causes [go beyond creating new PMs when possible] Prioritize equipment problem resolution © 2013 Institute of Nuclear Power Operations

Gaps in AP913 Implementation contributing to the events Performance monitoring – this includes Effective system walkdowns Long-term trending of important parameters [not just reviewing the current data against the action limit] Trend equipment failures within the system, across system boundaries, and compared to other stations © 2013 Institute of Nuclear Power Operations

But I am only the system engineer….. So was the engineer that knew about the Challenger problems. If the issue is one that impacts nuclear safety or plant reliability then be an advocate and go to the next level. System engineers need to overcome barriers and not stop at the first “no” Use CAP, health reports, plant health committee Find alternative solutions © 2013 Institute of Nuclear Power Operations

Questions? © 2013 Institute of Nuclear Power Operations