Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
Friday March 4 th LHC morning report the short story: from a global point of view we had basically only one access !!!
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
:30 meetingEBH 1  No beam during the morning:  4:15 – 9: V distributor: Recovery after electrical interruption  access for TI services.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 24 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Week 12 Beam Commissioning
Summary of week 7 Hardware Commissioning:
Saturday 30th June - Sunday: Rocky !
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Thursday morning – optics correction
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Summary of Week 16 G. Arduini, J. Wenninger
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Wed :40 Lost S78 - QPS controller.
Friday 31st August & night
Thursday 10th May - morning
Wednesday 8th August & night
Tuesday 20 March 2012.
Week 35 – Technical Stop and Restart
Monday February 28th 8h00: Injection
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Planning at 5 o’clock meeting Friday
Friday morning 10:30 Optics measurements and corrections.
Friday Morning 7:30 injection for fill 2908
Yesterday morning Held 1647 for a while – SPS kicker problem
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Friday 23rd March 08:00 Access
Summary Thursday h21: Stable beams fill #1303.
Aims for the week Recover from technical stop and precycle at 10A/s
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Sat morning Until 12:40: Loss maps at injection
MD Planning Fri – Sat (1. – 2.7.)
Summary for LPC (March 7th, Ralph Assmann)
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
LHC Morning Meeting - G. Arduini
Sat 18/3 - Ramp to 4 TeV Again glitch on the safe beam flag for beam 2. Cause identified: noise on BCT2B giving values above the safe beam limit (2.4×1010.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Thursday 22nd March 00:20 – 02:40 on longer squeeze function, orbit and chroma correction at 4 TeV 2:40 – 5:30 second cycle with long squeeze 5:46 – 7:00.
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Thursday
Thursday Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting.
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Thursday Morning/Afternoon
Wednesday 26 October 2011.
Tuesday
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Wednesday 21 March 2012

Wednesday 7:45 – 8:15 test longer squeeze functions 9:00 start collimation set-up at 450 GeV During the morning and afternoon: Several unavailabilities of beam from the injectors due to PS POPS problems, TI2 converter faults, 40MHz cavity trips in the PS, and ISOLDE DSO tests (6 out of 16 hours in total, but LHC program could partly continue) 10:00 MPS test by creating a beam dump via switching off the MKB (diluter dump kicker) generator FIDEL problem: ‘network unavailability glitch’ for cfv-ccr-ctmlhcgw 22:57 after a QPS trip, lost the circuits of RCD.A34B1 and RCO.A34B1 (beam stayed in the machine) 23:48 Collimator set-up at injection finished

Collimator set-up All 86 collimators set up, took on average 7 minutes per collimator. B1: new setup algorithm (Hz movement and BLM data) B2 in parallel on a different console (1 Hz). Fast 8Hz BLM signals can presently only be extracted at one console simultaneously Fast setup algorithm showed significant increases in setup speed. Automatic pattern recognition and threshold adjustment worked for the 1 Hz data. Fast BLM data did not show the loss spikes on all collimators. Also sometimes noisy with false spikes. A few collimators had to be re-aligned using the 1Hz movement, when unrealistically large beam size ratios were found. After set-up: preliminary loss maps ADT, worked only in the vertical plane. Used resonance crossing in the horizontal plane. No apparent hierarchy violation was found although a detailed offline analysis is required.

Collimator settings

Thursday 0:20 start with “Squeeze function stretch and orbit at 4 TeV” 1:05 Fidel server crashed again Chromaticity in the ramp measured, corrected back to +2 and incorporated into the ramp settings. 2:42 End of squeeze set-up. MPS test for FMCM: tripping the D1 LR1 (with probe beam at 0.6 m beta*) WIC (warm magnet interlock system) triggered first. No visible orbit change. Losses on the TCT in IR1 from the dump as the TCDQ is not set. 1 hour no beam from PSB

Summary of new long squeeze (Joerg, Matteo, Verena, Giulia) The PCs are tracking pretty well, still one is slightly late when arriving at 0.7 m (RQ6.L1B1), but the current error is small and should be OK. Orbit was fine all along (only one correction on the way) In the ramp we have no NOMINAL separation and no Xing angles up to the flat top.  The next step is to switch on the Xing angles and separation all along the squeeze, and to join the collision beam process including the rotation of the Xing plane. The settings for collision beam processes are prepared, including beat-beating corrections etc (could be done Thursday PM). Problems: Bad data quality for tune measurement and QFB switching off most of the time (with chirp on) Bad beam lifetime (longitudinal blow-up together with the dp/p modulation for the chromaticity measurement?)  recommend to switch off the longitudinal blowup for the next ramps with pilots

zoom on RQ6.L1B1/2 at the matching point at 0.7m B2 arrives slightly later than B1 but it should be fine now

Second cycle with stretched squeeze (2:40 – 5:30) Longitudinal blow-up off Very good tune signal Chromaticity measurement through the ramp and squeeze. Feedbacks never switched off. Chromaticity was corrected again through the squeeze Coupling was already good. Chromaticity through the ramp Chromaticity through the squeeze

5:46 – 7:00 TI8 stability check, bunches onto TED (new MKE delay) 7:26 Fidel calculations and trims not working

Plan - details under discussion Thu 08:00 – 13:00 K-mod check 4 TeV Thu 13:00 – 14:00 Splashes Atlas (5 – 10) Thu 14:00 – 20:00 Energy feedback, Crossing etc throughout the squeeze, LHCb special Thu 20:00 – 7:30 Injection protection set-up (including TCDQ) Fri 7:30 – 8:00 prepare access Fri 08:00 – 11:00 Access – FGC release (access IP4 tunnel only till 9:00) Fri 11:00 – 23:00 Aperture at 0.6 m – check with Daniel for ADT at 4 TeV Fri 23:00 – Sat 8:00 With new collimator ramp functions. Full LHC cycle with 1 probe bunch per beam (chroma measurements during the ramp) squeeze, collision, MPS test (switch D1 etc off) and repeat as often as possible Sat 08:00 – 23:00 1 nominal bunch to 4 TeV and Collimation at flat top Sat 23:00 – Su 4:00 Loss maps at 450 GeV and async dump test Sun 4:00 – 11:00 FIDEL measurements at 450 GeV; Full LHC cycle with 1 probe bunch per beam (croma measurements during the ramp) squeeze, collision, MPS test (switch D1 (etc – create list of magnets) off) and repeat as often as possible Sun 11:00 – 15:00 Coarse TCT set-up for squeeze and collision settings Sun 15:00 – 23:00 Injection and beam dump Sun 23:00 – Mo PM Tbd. Mo  afternoon 2-3 nominal bunches to flat top and through the squeeze (after collimator set-up)

Please fill in IMPACT! Access requests LHCb 1 hour Atlas 2 hours CMS 2 hours ALICE 3 hours BPMS point 6 1 hour (?) FMCM RD34.LR7 1 hour Suspected electrical problem on a fire detection unit in UX85. Access required at the next occasion RF UX45 1 hour BIS PC piquet: RQX.R2 and UA.87 BPMSW.1L1.B1 and B2 Diamond BLM UA87 HT monitor cable extension 6R4 Collimator LVDT position sensor IP3 BCTFRA UA47 Please fill in IMPACT!

To be sorted out – mostly scheduled for Friday During Friday morning: SBF glitches: Use 1 second (or more?) moving average DCBCT data transmitted at 10Hz to the SMP system or increase SBF limit… BCTFR needs frequent reboot FGC adapting the functions when they cannot be played Polarity of BPMSW.1L5.B1/2 – V plane access BPMD (dump line BPMs) for B1 shows often many bunches in the machine (50+), even when there is only one in the machine access IP6 interlock BPMs access Other: Squeeze length TCTVA.L2 out at injection as it shadows TDI orbit feedback switched off in H both beams during the step to 2m. When checking the reference, found plan H at zero both beams FIDEL