Electronics Pool Technical Advisory Board

Slides:



Advertisements
Similar presentations
Chapter 28 Promotion and Place Name 12 SAM.
Advertisements

Electronic Systems Support LV PS Procurement - Status February 28, 2005.
MBA (Trimester) Term V Module Title : Project Finance and Management
EAB2, 11/10/2001CERN EP-Electronics Pool1 The CERN-EP Electronics Pool: Current Status Jean-Pierre Vanuxem EP-ESS.
Electronic Systems Support The CERN Electronics Pool The current review Long term issues C. Parkman EP-ESS Electronics Advisory Board 23 May 2003.
Module five: Session Two M5S21. Training objective To review the various financing options available to road contractors M5S22.
CERN IT Department CH-1211 Genève 23 Switzerland t Options for Expanding CERN’s Computing Capacity Without A New Building Medium term plans.
IAS 16 PROPERTY, PLANT AND EQUIPMENT
SELECT A TYPE OF OWNERSHIP
Computerized Networking of HIV Providers Networking Fundamentals Presented by: Tom Lang – LCG Technologies Corp. May 8, 2003.
Professional Issues Slide 1 The Structure of Organisations & Finance Costs and Prices.
Financial Management How Can I Spend Award Dollars.
Expense Reduction: the timing has never been better! Lycia Rettig, Director Expense Reduction Analysts
Chapter 4 Getting Paid. Objectives Understand electronic payment systems Know why you need a merchant account Know how to get a merchant account Explain.
Markus Joos, EP-ESS 1 “DAQ” at the El. Pool Aim and preconditions Hardware Operating system support Low level software Middle level software High level.
15/12/10FV 1 Common DCS hardware. General ideas Centralized system: o Common computers. Detector dedicated computers (with detector participation) only.
Session 3: Project Development Agenda The Voice of a Technologist Utility Project Development Reliability Concepts Residential Project Development Homework.
Communication campaign Most common issues identified: - Indirect Costs Thanos BATSILAS FCH JU Financial Officer.
Electronic Systems Support Electronics Pool Status & Evolution Chris Parkman, November 7, 2002.
UNIVERSITY OF ECONOMICS IN BRATISLAVA, SLOVAK REPUBLIC 6. Contract negotiations.
Exercises for channel of distribution
W-Ie-Ne-R Visit to Wiener 10 th February 2003 –Primary aim: to finalise acceptance of VME64x prototypes. –Additionally: To establish whether Wiener is.
Ph. Farthouat EPTAB August Pool: ATLAS needs u Current ATLAS use u Proposals made a year ago u Future needs u Summary.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
27 August cp EPTAB5 1. Electronic Systems Support EPTAB 5 27 August 2003 News & Information Chris Parkman Catherine Moine.
LECC 2005, Heidelberg Markus Joos, CERN-PH/ESS 1 The VMEbus processor hardware and software infrastructure in ATLAS Markus Joos, CERN-PH/ESS 11th Workshop.
Reuse and Recycling Sean Nicholson. Reuse – the forgotten R ReduceReuseRecycle In contrast with many home appliances, life cycle energy use of a computer.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
ISEG HV power supplies for NA62 R. Fantechi 6/4/2011.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
COMMUNITY SURVEY 2011 CONDUCTED BY THE PROVOST BUSINESS COMMUNITY WITH THE ASSISTANCE OF PROVOST ECONOMIC DEVELOPMENT.
8 May cp EPTAB May cp EPTAB4 2 News BAAN400 – move underway June? Destocking continuing The pool has many low-rental items with high.
Electronic Systems Support EPTAB 7 Electronics Pool Status Report 6 December 2004 Chris Parkman Catherine Moine.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
Electronic Systems Support EPTAB 6 23 April 2003 News & Information Chris Parkman Catherine Moine.
Eldercare Financial Plan Prepared for: John & Jane December 15, 2015.
Legal framework of telework – practical solutions for employers Dr. Jacek Męcina.
BY AMAR P. NARKHEDE MAINTENANCE PLANNING. PLANNED PROGRAMME FOR MAINTENANCE Phase I 1. Prepare a list of all machines and equipments to be covered and.
Electronic Systems Support EPTAB Electronics Pool - Status Report 3 May 2006 Catherine Moine.
- Special Education Needs (SEN) Network Administrative and Financial Aspects.
Logistics Engineering and Management Hank Okraski 26 October 2013 Refer Unit 11, M&S Curriculum.
16/05/03Climatic Chamber & Testbench - Sophie Baron 1 Climatic Chamber & Testbench.
09/09/10FV 1 NA62 common crate project. Crates survey result VF2 09/09/10 VME High populated TELL1 High populated TELL1 (Spare) Low populated TELL1 Low.
CHORI Purchasing Flow Chart
STATEMENT OF CASH FLOWS Prepared by James R. Reap
Principles of Accounting
SMB Service Status 113th ACCU Meeting
International Accounting Standard 16 Property, Plant and Equipment
Barrhead Housing Association Ltd
Management Principles and Human Resources
PCard Update May 11, 2017 BSAG Meeting.
GUIDE TO GREEN SUSTAINABLE PROCUREMENT
SLC5 VME ROD based test system for Pixel DAQ: Outlook for Spring 2014
CHAPTER 5 TECHNICAL ANALYSIS.
Coherent sets of equipment Magnus Hansen
Business Markets and Business Buying Behavior
IT-4328: Technical Specification
Construction Approach and Productivity Issues
Operation Management
Operation Management
STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE
Strategy for long-term support of the TTC system
Southern Utah University
SELECT A TYPE OF OWNERSHIP
The E-Rate Program Eligible Services Fall 2011 Applicant Trainings.
Buying CERN-Standard Crates
#. shop now P1080P · /' '
Principles of Marketing
Digitization in Procurement – A Success Story Amit Bhowmik
Functional Information Systems
Presentation transcript:

Electronics Pool Technical Advisory Board EPTAB Electronics Pool Technical Advisory Board December 12 2002 Chris Parkman

Agenda cp 12 Dec. 2002 EPTAB 2

Pool News

General Personnel Stock reduction Gueorgui Antchev as Project Associate Test procedures, pool profile Stock reduction Incomplete and economically unrepairable equipment sent for recuperation Obsolete but functional equipment for disposal – list in preparation cp 12 Dec. 2002 EPTAB 2

General NA49 – shut-down “Buyer’s Guide” Pool premises Agreement to freeze account during 2003 in case restart with ions Overheads covered Precedent for 2005? “Buyer’s Guide” Help with the choice of equipment Characteristics, applications, etc. Pool premises Refurbishment of the reception “Shop Window” cp 12 Dec. 2002 EPTAB 2

Non-Pool Items in Eq. Catalogue Attempt made Underwhelming response (2) Problems raised by F.Formenti Strong encouragement from D.Schlatter cp 12 Dec. 2002 EPTAB 2

LECS (5% Surcharge) Formally terminated by D.Schlatter cp 12 Dec. 2002 EPTAB 2

Newsletter Send to Electronics Pool mailing list cern-electronics cp 12 Dec. 2002 EPTAB 2

Pool Income cp 12 Dec. 2002 EPTAB 2

Pool accounting - 2001 CHF % of total income Income from Rental 2’506’138 Other income 147’560 Total income 2’653’698 Maintenance -283’622 10.7% Manpower -192’925 7.2% Total direct overheads -476’547 17.9% Disposable income 2’177’151 cp 12 Dec. 2002 EPTAB 2

Pool accounting – 2002 (Dec estd.) CHF % of total income Change wrt 2001 Income from Rental 2’400’000 Other income 60’000 Total income 2’460’000 Maintenance -300’000 12.2% +1.5% Manpower -192’925 7.8% +0.6% Total direct overheads -492’925 20.0% +2.1% Disposable income 1’758’660 -418’000 cp 12 Dec. 2002 EPTAB 2

Pool Economics cp 12 Dec. 2002 EPTAB 2

Present Rental Scheme 0.75*Pp/Lifetime + 1.4%Pp < Lifetime 0.75*Pp/Lifetime + 1.4%Pp - 10%Pp/year > Lifetime, minimum 20%Pp cp 12 Dec. 2002 Lifetime=5 years EPTAB 2

Economic Rental Scheme cp 12 Dec. 2002 Rental fee – 25.4% of purchase price (Occupancy – 60%) Amortisation in lifetime (7 years) EPTAB 2

Equipment purchases

LHC VME64x Crates Weiner 6U – local 1kW power supply Unit price: ~6’500CHF Qty: 10 Weiner 9U – 2.5kW remote power supply Unit price: ~11’000CHF cp 12 Dec. 2002 EPTAB 2

VMEbus SBC Concurrent Technologies VP110 Unit price: ~4’700CHF Qty: 3 256 Mbytes 800MHz Pentium III 2 PMC sites ServerWorks PCI bridge Universe II VMEbus bridge Unit price: ~4’700CHF Qty: 3 Disk or network booting cp 12 Dec. 2002 EPTAB 2

PCI-CAN Interface Kvaser PCIcan-Quad Unit price: ~500CHF Qty: 20 4 channel CAN-PCI interface CAN controllers: 4×SJA1000 Unit price: ~500CHF Qty: 20 JCOP selected cp 12 Dec. 2002 EPTAB 2