LHCb electronics, 12th June 2014

Slides:



Advertisements
Similar presentations
Front-end electronics for the LPTPC Outline of the talk:  System lay out  Mechanics for the front-end electronics  End-cap and panels  Connectors and.
Advertisements

Chubaka Producciones Presenta :.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Template For Building Project Schedule Jazz Presentation.
Ken Wyllie, CERN LHCb electronics, 3rd September LHCb Upgrade Electronics Meetings in 2015 (Thursday, 2pm, ): 8 th October 3 rd December.
F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
Estimated schedule, costs and number of ABC130 needed Tony Affolder.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
1 Installation Logistics Itzhak Tserruya HBD meeting BNL, July 6, 2006.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
WLCG Planning Issues GDB June Harry Renshall, Jamie Shiers.
Ken Wyllie, CERN LHCb electronics, 10th April LHCb Upgrade Electronics Meetings in 2014 (Thursday, 2pm): 12 th June 14 th August 9 th October 11.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
1 MICE PM Report Infrastructure/integration progress Electrical work AFC, diffuser, etc Help with project control & staffing issues Worries & problems.
HF FE Radiation tests at the CHARM facility Tullio Grassi 4 June 2015 Documentation on:
Ken Wyllie, CERN LHCb power supplies, 19th May Does each sub-detector have enough power supplies for the upgrade???? If not, do they need: More.
Ken Wyllie, CERN Tracker ASIC, 5th July Overview of LHCb Upgrade Electronics Thanks for the invitation to Krakow!
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
Transition Alta High School. OBJECTIVES Timeline Planning Registration 9 th grade transition.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Ken Wyllie, CERN LHCb electronics, 8th October LHCb Upgrade Electronics Meetings in 2015 (Thursday, 2pm): 3 rd December
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
BLM System R2E and Availability Workshop, B.Dehning 1 Bernd Dehning CERN BE-BI
Сегодня мы с вами на уроке: Познакомимся с названиями месяцев; Познакомимся с названиями месяцев; Вспомним слова, которые нам помогут при обсуждении темы.
QUARTERLY REPORTS. Quarterly Reports Quarterly Reports are due by the 10 th working day of: January (October, November, December) April (January, February,
ALICE Trigger Upgrade CTP and LTU Design Review ALICE CTP and LTU Upgrade Design Review CERN 27 th January 2016 Budget, time schedule, resources David.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
You must call CIRS at to reserve a spot
TOTEM Electronics Status
Pico-second TDC Schedule & Production
Upgrade activities at Clermont-Ferrand
CSP 25th November 2010 Technical agreement number 3: overview
General aspects: Optical links :
S. Baron - BE/BI-PH-ESE GBT/VL meeting
Collaboration meeting 26 to 28 June 2017
Introduction LOI Hardware activities and GBT Simulations
Period 2.
LHCC referees’ questions, comments, requests
An introduction to outlining in PowerPoint
LHCb electronics, 13th October 2016
Calendar 2017.
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
Pine cove pit time lapse drone photos
Potential Use of PEP-II Magnets by Project X
Calendar of 2012 ESL Lesson on Months.
Math Management Binder ©
Logo Calendar – January 2012 TO DO LIST 01/04/2012 Example TO DO LIST
0845 Analysis I have only very recently taken over responsibility for the 0845 number and whilst questions were asked of Derrick some months ago, we have.
2300 (11PM) September 21 Blue line is meridian..
April May April May June July July June August Sept August
EPILEPSY SUPPORT GROUP
Tropical cyclones movement
February 2007 Note: Source:.
EPILEPSY SUPPORT GROUP
New Orders and Order Books
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
The LHCb Front-end Electronics System Status and Future Development
IKCA CEA Technical ANNEXES Follow up 18th DECEMBER 2015.
Pico-second TDC Schedule & Production
January Monday Tuesday Wednesday Thursday Friday Saturday Sunday 30 31
2015 January February March April May June July August September
Presentation transcript:

LHCb electronics, 12th June 2014 LHCb Upgrade Electronics Meetings in 2014 (Thursday, 2pm): 14th August 9th October 11th December http://lhcb-elec.web.cern.ch/lhcb-elec/html/upgrade.htm Mailing list: Go to simba.cern.ch, search for lhcb-upgrade-electronics Ken Wyllie, CERN LHCb electronics, 12th June 2014

LHCb electronics, 12th June 2014 News I GBT chipset ready for production Reticle layout optimised for quantities & metal stack by Paulo Moreira => cost optimisation  Reticle repeated 277 times on 8” wafer 1st stage: ‘engineering run’: few wafers in Sept, testing 2nd stage: ‘production run’: end 2014 This is when we need our final quantities!!! Ken Wyllie, CERN LHCb electronics, 12th June 2014

LHCb electronics, 12th June 2014 News II Official price-list GBTX 50 CHF GBT-SCA 24 CHF VTTX 150 CHF VTRX 200 CHF Ken Wyllie, CERN LHCb electronics, 12th June 2014

LHCb electronics, 12th June 2014 News III CHARM radiation facility open for business http://charm.web.cern.ch/CHARM/ See website for details on booking radiation time 1st batch of DC-DCs coming soon (July) New copper cables: installation extremely difficult re-use existing cables future discussion (eg for new power supplies) New electronics milestones for next ~ 12 months Including many design reviews (scheduled to be useful!) I will ask many of you to act as internal LHCb reviewers! Ken Wyllie, CERN LHCb electronics, 12th June 2014