Misc. Topics Markus Friedl (HEPHY Vienna) 22 January 2015.

Slides:



Advertisements
Similar presentations
January 6. January 7 January 8 January 9 January 10.
Advertisements

Electrical QA Markus Friedl (HEPHY Vienna) IPMU, 19 March 2012.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
The Belle II Silicon Vertex Detector Readout Chain Markus Friedl (HEPHY Vienna) TWEPP2012, 19 September 2012.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
Anthony AffolderUS CMS Meeting 12/3/02DAQ Based Systems LV/HV Needs DAQ Power Supply Needs HV à 600 V/~1mA range –0.1-1  A Current Sensing –Over Voltage/Current.
January 25, 2003Richard Talaga1 High Voltage Distribution for RPCs Simple Model of Detector & HV Specifications & Requirements Simple HV Distribution Layout.
DC/DC Converter Update Markus Friedl (HEPHY Vienna) B2GM, 22 July 2012.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna
Electrical Quality Assurance Markus Friedl HEPHY Site Qualification, 6 August 2015.
7 th B2GM SVD Summary 19 November 2010 Markus Friedl (HEPHY Vienna)
ALICE DCS Workshop 28/29 May 2001 Vito Manzari, INFN Bari SSD (Silicon Strip Detector) SDD (Silicon Drift Detector) SPD (Silicon Pixel Detector) Detector.
Noise and Capacitor M.Friedl, R.Thalmeier, H.Yin (HEPHY Vienna) 24 September 2015.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
The Alice-ToF HV system and the PVSS control system E. Scapparone for the Alice-Tof group DCS Workshop, June 16 - The ToF High Voltage layout ; - Component.
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
Paolucci INFN-Napoli Muon Annul Review Cern 15 September 2003 RPC cabling HV & LV cables Signal cables Position and composition of racks in UXC and USC.
1 Stave 0 and QA plan UniGe-UniBe meeting, February 10 th 2012 D. Ferrère, A. La Rossa, Y Takubo.
Status of shaper prototype production B.G. Cheon (Hanyang U)‏ Dec. KEK 1 st open meeting of the Super KEKB Collaboration.
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
2 Oct C. Irmler (HEPHY Vienna) BPAC Preparation and SVD Schedule 6 th Belle II VXD workshop.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
Logistics 1 – To/Between Assembly Sites M.Friedl (HEPHY Vienna) 2 October 2014.
APVDAQ Status Markus Friedl 22 January M.Friedl: APVDAQ Status2 Introduction What APVDAQ Can Do What APVDAQ Cannot Yet Do What APVDAQ Cannot Do.
SVD DAQ Status Koji Hara (KEK) 2012/7/19 DAQ workshop1.
FP420 Low and high voltage supply Henning E. Larsen, INFN/Univ. of torino April
Design summary Status of the development & production - test run with S3a and S3b prototype - performance tests To do list for production & development.
SVD Cables & Pipes Markus Friedl (HEPHY Vienna) B2GM, 24 July 2012.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Faculty of Physics, University of Belgrade Collaboration board meeting 31 th of January, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
The new SVD Power Supplies o General requirements o Power supplies structure o Tender process o Test system 2/10/2014SVD Power Supplies1 F.Forti, INFN.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
SVD Docks Markus Friedl (HEPHY Vienna) B2GM, 23 July 2012.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
SVD Slow Control Markus Friedl (HEPHY Vienna) DAQ/SC Kickoff Meeting, 8 November 2012.
SVD Summary Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 6 February 2013.
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
FADC/Hybrid cable production 21 Jan 2015 T. Tsuboyama.
9 September 2015 VXD Mechanics Summary Markus Friedl (HEPHY Vienna)
SVD FADC SVD-PXD Göttingen, 25 September 2012
SVD Electronics Constraints
SVD Introduction Wetzlar SVD-PXD Meeting, 4 February 2013
Markus Friedl (HEPHY Vienna)
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
T1 Electronic status Conclusions Electronics Cards:
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
Hardware Needs (Near Term)
Subsystem Mgrs F2F Meeting Calorimeter Subsystem
SVD Mechanics Group Organization & Work packages
TEC Module Production Overview
BPAC, 17 October 2017 VXD GND/EMC Markus Friedl (HEPHY Vienna)
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
US Module Testing Progress Report
Electronics Sub-Group
US Module Testing Progress Report
US Rod Burn-in Readiness DAQ Hardware/Power Supplies
Equipment Status ARCS equipment status DAQ equipment status
SVD group organization, schedule, milestones
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

Misc. Topics Markus Friedl (HEPHY Vienna) 22 January 2015

Introduction FTB Power Supply Cables M.Friedl: Misc. Topics 22 January 2015

Introduction FTB Power Supply Cables M.Friedl: Misc. Topics 22 January 2015

Introduction I have asked colleagues for one slide: Wacek: FTB Status Francesco: Power Supply Tender Status Toru: Cable Supply Status They all provided several slides I summarize here Original slides are uploaded to Indico as a detailed reference M.Friedl: Misc. Topics 22 January 2015

Introduction FTB Power Supply Cables M.Friedl: Misc. Topics 22 January 2015

FTB Status 50 PCBs and parts handed over to assembly company To be completed in February Total amount of final FTB boards: 62 50 in production 7 in Krakow 2 modules at KEK (Nakamura-san) 2 modules in Vienna 1 module in Bonn (Michael Schnell) At least 56 should be at KEK in the end Shipping to KEK not clear yet M.Friedl: Misc. Topics 22 January 2015

Introduction FTB Power Supply Cables M.Friedl: Misc. Topics 22 January 2015

Power Supplies Status TWiki page: Tender in second half of 2014 https://belle2.cc.kek.jp/~twiki/bin/view/Detector/SVD/PowerSupplies Tender in second half of 2014 CAEN won Delivery expected in second half of 2015 Additional channels for n-side separation voltage possible Product Description Nch/ board Qty base Spare Total boards Total ch SY4527 Universal multichannel Power supply system - Basic 600W 2 1 3 A4533 Optional double power supply unit 1200W A2519A (LV) LV Channels 15V 5A (50W) - DB37 conn - Individually floating (8ch) 8 12 15 120 A1510 (SEP) HV Channels 100V 10mA floating (12ch) 24 A1519B (HV) HV Channels 250V 0.1/1mA floating (12ch) 4 5 60 M.Friedl: Misc. Topics 22 January 2015

Introduction FTB Power Supply Cables M.Friedl: Misc. Topics 22 January 2015

Cable Supply Status Hybrid cables (hybrid to DOCK, 2.5m) Halogen-free small-pitch twisted cables from CERN (obsolete) Cable assemblies made by Japanese company until March L3 cables are supplied by HEPHY (soldered to hybrids) FADC cables (DOCK to FADC, 13m) Halogen-free small-pitch twisted cables from Amphenol Open items: Power supply to DOCK cables (LV + HV) Cost estimate: ~25k€ M.Friedl: Misc. Topics 22 January 2015