Timing and synchronization at SPARC

Slides:



Advertisements
Similar presentations
M. Ferianis feb UCLA Overview of FERMI Diagnostics.
Advertisements

RF Synchronisation Issues
Before aperture After aperture Faraday Cup Trigger Photodiode Laser Energy Meter Phosphor Screen Solenoids Successful Initial X-Band Photoinjector Electron.
SLAC XFEL Short Bunch Measurement and Timing Workshop 1 Current status of the FERMI project (slides provided by Rene Bakker) Photoinjector laser system.
Stefan Simrock 3 rd LC School, Oak Brook, IL, USA, 2008, Radio Frequency Systems 1 Timing and Synchronization S. Simrock and Axel Winter DESY, Hamburg,
Gamma Beam Systems a simple introduction. Purpose of the machine Deliver a high performance photon beam: Variable energy Highly polarized High intensity.
EuroNNAc Workshop, CERN, May 2011 External Injection at INFN-LNF ( integrating RF photo-injectors with LWFA ) Luca Serafini - INFN/Milano High Brightness.
Siegfried Schreiber, DESY The TTF Laser System Laser Material Properties Conclusion? Issues on Longitudinal Photoinjector.
30. Nov I.Will, G. Klemz, Max Born Institute: Optical sampling system Optical sampling system for detailed measurement of the longitudinal pulse.
RF Synchronization Activity at SPARC A.Gallo and D. Alesini, M. Bellaveglia, R. Boni, G. Di Pirro, A. Drago, A.Ghigo P. Baldini, L. Cacciotti, M. Scampati,
New Electron Beam Test Facility EBTF at Daresbury Laboratory B.L. Militsyn on behalf of the ASTeC team Accelerator Science and Technology Centre Science.
W.S. Graves, ASAC Review, Sept 18-19, 2003 Accelerator Overview Goals for proposal Description of technical components: injector, linac, compressors, etc.
Holger Schlarb, DESY Normal conducting cavity for arrival time stabilization.
W.S. Graves1 Seeding for Fully Coherent Beams William S. Graves MIT-Bates Presented at MIT x-ray laser user program review July 1, 2003.
Low Emittance RF Gun Developments for PAL-XFEL
SPPS, Beam stability and pulse-to-pulse jitter Patrick Krejcik For the SPPS collaboration Zeuthen Workshop on Start-to-End Simulations of X-ray FEL’s August.
05/05/2004Cyrille Thomas DIAMOND Storage Ring Optical and X-ray Diagnostics.
W.S. Graves ASAC Review Sept 18-19, 2003 R&D at Bates William S. Graves MIT-Bates Laboratory Presentation to MIT X-ray laser Accelerator Science Advisory.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
The Next Generation Light Source Test Facility at Daresbury Jim Clarke ASTeC, STFC Daresbury Laboratory Ultra Bright Electron Sources Workshop, Daresbury,
Awake electron beam requirements ParameterBaseline Phase 2Range to check Beam Energy16 MeV MeV Energy spread (  ) 0.5 %< 0.5 % ? Bunch Length (
1 Short Electron Pulses from RF Photoinjectors Massimo Ferrario INFN - LNF.
RF low level control & synchronization A. Gallo, M. Bellaveglia, L. Cacciotti SPARC review committee – ENEA Frascati – 16/11/2005.
European Advanced Accelerator Concepts Workshop, Elba, September 14 th -18 th, 2015Steffen Döbert, BE-RF Electron accelerator for the AWAKE experiment.
SL_THOMSON C. Vaccarezza on behalf of the SL_Thomson team.
MAX IV linac overview and scope of automation Sara Thorin.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
B. Marchetti R. Assmann, U. Dorda, J. Grebenyuk, Y. Nie, J. Zhu Acknowledgements: C. Behrens, R. Brinkmann, K. Flöttmann, M. Hüning,
Free Electron Laser Studies
Areal RF Station A. Vardanyan
Status of the SPARC laser and “dazzler” experiments
Status of SPARC synchronization system and possible upgrades
RF acceleration and transverse damper systems
LCLS_II High Rep Rate Operation and Femtosecond Timing
SPARCLAB: PW-class Ti:Sa laser+SPARC
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
Summary of SPARC first-phase operations
Beam dynamics simulation with 3D Field map for FCC RF gun
UK FEL development package WP6:
RF Synchronization Activity
Group and phase velocity matching in THz IFEL interaction
Sara Thorin, MAX IV Laboratory
Status of the Thomson Source
An X-band system for phase space linearisation on CLARA
Have a chance to operate your own beam at CERN
RF Synchronisation Issues
Status of Synchronization System
EuPRAXIA working package report
Two color FEL experiment
Paul Scherrer Institut
The SPARC_LAB Thomson source
DESIGN AND FIRST EXPERIENCE WITH THE FERMI SEED LASER
F. Villa Laboratori Nazionali di Frascati - LNF On behalf of Sparc_lab
LCLS Longitudinal Feedback and Stability Requirements
Advanced Research Electron Accelerator Laboratory
LCLS RF Stability Requirements
Compact linear accelerator FLUTE: status update
Linac Coherent Light Source (LCLS) LLRF Preliminary Design Review LLRF Monitor and Control System September 26, 2005 Ron Akre.
Linac Diagnostics Patrick Krejcik, SLAC April 24, 2002
CLIC Feasibility Demonstration at CTF3
LCLS FEL Parameters Heinz-Dieter Nuhn, SLAC / SSRL April 23, 2002
Breakout Session SC5 – Control Systems
Introduction to Free Electron Lasers Zhirong Huang
Proposal for Smith-Purcell radiation experiment at SPARC_LAB
Enhanced Self-Amplified Spontaneous Emission
Breakout Session SC3 – Undulator
Electron Optics & Bunch Compression
Presentation transcript:

Timing and synchronization at SPARC M. Bellaveglia On behalf of the SPARC/X timing, synchronization and LLRF group

Summary SPARC general overview Synchronization and timing systems Phase detection techniques Feedbacks and PLLs in the system Two beams synchronization SPARC future plans Electrons-photons interaction: SPARC towards LI2FE LI2FE synchronization Conclusion

SPARC general overview SEEDING LASER PHOTOINJECTOR UNDULATOR HHG DGL PLASMON-X THOMSON

SPARC general overview

LNF Synchronization lab

SPARC synchronization system overview One optical master oscillator Feedbacks with BW <<1Hz, ≈5kHz and ≈1MHz to synchronize the subsystems Shot-to-shot (10Hz) analysis for amplitude and phase calculation

SPARC timing system overview Line synchronization 50Hz PC laser amplification pump 1KHz RF reference 79.33MHz Trigger box 1KHz PC laser oscillator 79.33MHz Frequency divider 10Hz RF reference 2856MHz PC and seeding lasers Machine trigger distribution 10Hz Frequency divider 1KHz Diagnostics Input Output Electrical Optical Transduction RF triggers

Phase detection – standard mixing technique DtRMS ≈ 55 fs Sampling Board Tested Sampling Boards: ADLINK 9812: 12-bit, 4-channels, 20 Ms/s ADLINK 9820: 14-bit, 2-channels, 65 Ms/s NI PXI 5105: 12-bit, 8-channels, 60 Ms/s Console application: Real time base band analysis: phase noise and amplitude measurements Possibility in choosing waveform analysis

Phase detection – Resonant method DtRMS ≈ 250 fs 2142MHz cavity design to avoid RF interference with accelerating structures Cavity exited by very short pulses: (i) e.m. field of the beam or (ii) output of a high voltage PD excited by the UV laser Phase detection is possible using the decay time of some us inside the cavity 250fsRMS time of arrival jitter observed in both the laser and bunch monitor

Phase detection – Deflector centroid jitter SPARC RF deflector Image of a SPARC bunch vertically streaked on a target Measurement of the beam centroid vertical jitter t ≈ 150 fsRMS

PLLs - Klystron Fast Phase Lock Phase shifter PLL on: Dt≈77fsRMS PLL off: Dt≈630fsRMS To waveguides Error amp From reference The phase noise introduced at the RF power generation level can be reduced by phase locking the klystron output to the RF reference with an analog loop: same concept as phase loops in CW machines; Short time available to reach steady state (≈1ms): wideband loop transfer function (≈1 MHz) required.

PLLs – Long term drifts correction

Two beams synchronization – IR-UV on cathode IR beam UV beam electrons RF GUN DEFLECTOR SCREEN Experiment to try to modulate the electron beam during the photo emission Delay line in the IR optical transfer line to synchronize the beams Coarse synch (same bucket, <360ps): HV photodiode illuminated by the two beams and 5GHz oscilloscope to see the pulses overlap in time Fine synch (“zero” delay): electron extracted by both the beams and accelerated until the RF deflector

Two beams synchronization – IR-UV on cathode

Two beams synchronization – FEL seeding Undulator SR LASER SEED SCREEN

Two beams synchronization – FEL seeding Same approach than the IR+UV experiment Both the beams are optical and more precisely: (i) the spontaneous radiation of the electron beam and (ii) the seeding laser pulse Coarse synchronization (about 1ns): photodiode and oscilloscope (500MHz BW is enough) Tuning the undulator section for spontaneous we were able to see both the signals on the oscilloscope and to overlap the electrical pulses Also we observed the spectrum of the two beams tuning the spontaneous in the same wavelength range of the seed (400nm)

Two beams synchronization – FEL seeding Fine synchronization: when the coarse synchronization was finished, we tuned the undulator sections to let the electron beam interact with the seed and we slightly moved (5mm) the optical delay line of the seeding laser We immediately observed the seed amplification at the spectrometer screen @400nm

SPARC future plans - SPARC towards LI2FE SPARC nominal parameters Electron Beam Energy 155 MeV RMS normalized transverse emittance <2 mm-mrad Bunch Charge 1.1 nC RMS slice norm. transverse emittance <1 Repetition rate 10 Hz RMS total corralated energy spread 0.2 % Photocathode spot size mm RMS incorrelated energy spread 0.06 Laser pulse duration (flat top) ps RMS bunch spot size @linac exit 0.4 Laser pulse rise time (10÷90%) 1 RMS bunch length @linac exit Bunch peak current (50% beam) 100 A SEEDING LASER PLASMON-X FLAME parameters PHOTOINJECTOR LASER Wavelength 800 nm Compressed pulse energy 5 J Pulse duration (bandwidth) 30 (80) fs (nm) Repetition rate 10 Hz Energy stability 10% Pointing stability <2 urad THOMSON HHG DGL PHOTOINJECTOR UNDULATOR

SPARC future plans - LI2FE Experiments Thomson scattering Requires physical overlapping of SPARC and FLAME beams within the depth of focus of the laser focusing optics. Experiments: PLASMONX, MAMBO Request: Δt<1psRMS Plasma acceleration SPARC and Flame pulses injected in a gas jet, requires synchronization at the level of the period of the plasma wave. Experiments: PLASMONX Request: Δt<100fsRMS

SPARC future plans - LI2FE synchronization FLAME AREA FLAME oscillator In 2856MHz Out 79.33MHz Current layout PC laser oscillator is the OMO Electrical reference distribution FLAME not yet considered PC laser Oscillator 79.33MHz RF reference 2856MHz SPARC HALL

SPARC future plans - LI2FE synchronization FLAME AREA FLAME oscillator In 2856MHz Out 79.33MHz 1st solution – electrical distribution Easiest and quickest Low cost Coaxial cable distribution Possible temperature stabilized cable bundle Hundreds of femto-seconds performance PC laser Oscillator 79.33MHz RF reference 2856MHz SPARC HALL

SPARC future plans - LI2FE synchronization FLAME AREA 2nd solution – optical distribution Fiber laser OMO (Optical Master Oscillator) Major system modification needed Higher cost Fiber links to distribute the signal (active length stabilization) Optical mixing (cross correlation) for laser clients Sub-100fs performance PC laser Oscillator 79.33MHz OMO FLAME oscillator RF reference 2856MHz SPARC HALL

Conclusion Future plans: electrons-photons interaction Synchronization system performance System is inside project specifications New diagnostic methods developed (BAM, LAM) e-beam to RF jitter: ≈200 fsRMS Seeding experiment successful Future plans: electrons-photons interaction Possible solutions and relative jitter: Electrical reference distribution: 100÷200 fsRMS Optical reference distribution: <100 fsRMS