Data Driven Risk Modelling A Pragmatic Approach

Slides:



Advertisements
Similar presentations
Rock Paper Scissor Tournament. STRATEGIC MANAGEMENT PROCESS 1.4.
Advertisements

Job Analysis Background Research 1)Organizational charts (e.g., how the job is connected to other positions and where it is located in the overall company)
HSE’s Ageing and Life Extension Key Programme (KP4) and Human Factors
Where does Failure Mode and Effects Analysis (FMEA) come from?  Developed by the Aerospace industry in the1960s  Spread to the Automotive industry 
Contractor Safety Management
Project quality management Cody Ronning 3/23/2015.
Organization and technology interventions to improve Safe and Eco driving 1 Organization and technology interventions to improve safe and eco driving P.
Chapter 9 Flashcards. measurement method that uses uniform procedures to collect, score, interpret, and report numerical results; usually has norms and.
Bureau of Workers’ Comp PA Training for Health & Safety (PATHS)
Systemise your compliance management Peter Scott Consulting
SAFETY, HEALTH, AND ENVIRONMENTAL AUDITING
EMPLOY THE RISK MANAGEMENT PROCESS DURING JOB PLANNING and EXECUTION
Definition Hazard - Anything, any source or any situation with the potential to cause bodily injury or ill-health Risk – the likelihood that a hazard.
1 MEASURING THE EFFECTIVENESS OF THE NATION’S FOODSERVICE AND RETAIL FOOD PROTECTION SYSTEM.
Occupational Road Risk Health and safety issues for vehicles and drivers Mike Lewis MIOSH, RSP.
Evaluating Sales force performance &
© 2009 Michigan State University licensed under CC-BY-SA, original at Corrective Action.
Introduction to Quality, Cost & Delivery
Property MOT’s Tying the Red Ribbon. Calls to the CSC each Year How many for Repairs? How many Repairs do we do each year? How many are emergencies? How.
Hazard Identification
High Potential Incident Intervention. Background 2 The principle policy of Downer Blasting Services regarding to our staff is “Zero Harm” The success.
CSA 2010 Comprehensive Safety Analysis Scheduled Implementation Dates July 2010 through December 2010.
© 2011 Towers Watson. All rights reserved. The Case for Usage Based Insurance Telematics-based insurance revolution 2 nd December 2011.
DESIGNING FOR SAFETY CHAPTER 9. IMPORTANCE OF DESIGNING FOR SAFETY  In the near future, the level of safety that companies and industries achieve will.
TOOL BOX TALKS OHS Risk Management. Definitions Hazard – anything with the potential to cause harm to a person or damage to property Risk – the actual.
“Put Some Science in Your Game with Leading and Trailing Indicators” Safety Performance Metrics Tom Lott Senior Vice President Wachovia Insurance Services.
A Strategy for Prioritising Non-response Follow-up to Reduce Costs Without Reducing Output Quality Gareth James Methodology Directorate UK Office for National.
Information Commissioner’s Office Sheila Logan Operations and Policy Manager Information Commissioner’s Office Business Matters 20 May 2008.
Changing risk in the liberalised rail freight market Ian Lake – Railway Safety Commission.
Hazards Identification and Risk Assessment
Chapter 4 Linear Regression 1. Introduction Managerial decisions are often based on the relationship between two or more variables. For example, after.
New Mexico Department of Transportation Research Bureau Expanding the Use of Weigh-In-Motion Data.
Job Safety Analysis.
Telematics and Insurance By Sreenu Musham. Agenda What is Telematics? How does Telematics help in Insurance Premium? What are different products from.
1 Designing and Implementing Controls The Control Process The management function concerned with monitoring activities to ensure that they are being accomplished.
Identify bottlenecks Facilitators’ Workshop on District Health Performance Improvement Lilongwe, 25 th – 27 th March 2015.
Objectives By the end of this presentation you will know: What risk assessment is; Where the need for risk assessment comes from; and The principles behind.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 30 1.
OHSAS Occupational health and safety management system.
Serious Incident/Fatality Information Exercise Jim Howe, CSP, Safety Solutions Dave Demko, GM Safety Manager.
Risk Assessment and Risk Management James Taylor COSC 316 Spring 2008.
Telematics Meets Fleet Operations Presented by: Mannix Khelghatian.
PotashCorp.com Fall Safety Reset Aurora Focusing on a Strong 2015 Finish October 2015.
Chapter 3 Basic Cost Concepts McGraw-Hill/Irwin © 2005 The McGraw-Hill Companies, Inc., All Rights Reserved. 3-3 Learning Objectives Explain the cost.
Office of Rail Regulation
Policies Controlling Risk
Guide for the application of the CSM design targets (CSM-DT)
VTS - Purpose VTS is being introduced to improve the safety of our staff by helping them to drive within the speed limit by providing a system that enables.
MANAGING B2B CUSTOMER LOYALTY LEADERSHIP MEASUREMENT ACTION
2017 Winter Employee Engagement Survey
Software Verification and Validation
North Area consolidation project
TRAINING NEED ANALYSIS
A Risk-based Approach to Training Paul Cheeseman & Kerry MacDonald
CRANE RELIABILITY STUDY
New Goal Clarity Coach Training October 27, 2017
IMPLEMENTATION OF EIGHT PILLARS THE TOTAL PRODUCTIVE MAINTENANCE AT WATER SUPPLY COMPANY Iswandi Idris Ibrahim Ruri Aditya Sari.
ECOLAB & ALCHEMY PARTNERSHIP OVERVIEW
A Guide to Determining Accident Preventability
Software Quality Engineering
Comprehensive Safety Analysis (CSA) 2010 Supplemental Slides to discuss Data Preview with Motor Carriers U.S. Department of Transportation Federal Motor.
2018.
University of Muenster Consulting
Raising profit and Controlling Shrink
Seek help early – before a crisis
Rail Safety Summit 1st November 2018 Ian Prosser CBE
Power point presentation
Industrial Radiography Equipment Need for a review of the effectiveness of the implementation of ISO 3999? IAEA Technical Meeting Vienna, June 2014.
Week 9 Sampling a population
IV&V Planning & Execution Initiative
Presentation transcript:

Data Driven Risk Modelling A Pragmatic Approach Marcus Beard and George Simpson October 2017 Presentation at IRSC 2017 Hong Kong

This paper outlines a pragmatic data driven risk modelling approach and considers application to the rail sector Background A utilities sector company needed to prioritise limited safety assurance resource in inspecting large volumes of safety critical installation work The work is completed by lone workers over a large geographical area and assurance resources are not sufficient to inspect all work These workers can sometimes leave unsafe situations in their work that can lead to low probability, high severity accidents with significant reputational risk Risk model We modelled the risk posed by each individual worker using a composite function of multiple parameters, such as driving behaviour and productivity The model outperformed the client’s existing risk model in testing and is now being operationalised

Following a ‘deep dive’ audit the company found that their actual defect rate was 11 times higher than expected ~3 million assets, standard assurance process defect rate 0.4% Representative audit sample of ~1650 assets, defect rate 4.4%     Approx. 12,000 high risk defects 132,000 high risk defects implied The existing risk score did not differentiate fitters with a propensity to leave high risk defects. So where to focus?

New model: correlating fitters who had previously left high-risk defects with other observable parameters Demographic data Correlate parameters with defect rate Categorise and weight parameters Vehicle driving record Modelled Risk Productivity data New risk model Defect data Existing Risk model Recorded Risk

Relative strength of correlation High-risk defects were associated with fitters with high driving risk, high productivity and history of other defects Relative strength of correlation Strong correlation High risk defect history Other defect history Productivity Driving history Length of service Moderate correlation Driver telematics score District Weak correlation Lost / stolen equipment Training centre Customer complaints Personal security device usage Parameters with a strong or moderate correlation were used to derive the Modelled Risk

EXAMPLE. Driving risk correlates strongly with fitters who have left high risk technical defects in the past Driving risk score = Each licence endorsement is 3 points Each vehicle incident recorded (e.g. damaged wing mirror) is 3 points Vehicle write offs are 6 points Includes non-blameworthy incidents and remains on an employee’s record for 24 months

EXAMPLE. Fitters with higher overall productivity are more likely to have left high risk technical defects

High risk defect history *All values shown are illustrative We defined risk boundaries so that approx. 20% of fitters were assigned to each high risk category… Low risk* Moderate risk High risk* High risk defect history >1 Other defect history >1 Productivity <5 >6 Driving history <3 >6 Length of service >3y <1y Driver telematics <65 >80 District <0.34 >0.63 *All values shown are illustrative

High risk defect history *All values shown are illustrative …we then assigned weightings to each parameter, the sum of which gives the fitter’s modelled risk Low risk* Moderate risk High risk* High risk defect history 1.125 2.25 >1 Other defect history 1.125 2.25 >1 Productivity 0.5 1 <5 >6 Driving history 1 2 <3 >6 Length of service 0.5 1 >3y <1y Driver telematics 0.5 1 <65 >80 District <0.34 0.25 0.5 >0.63 *All values shown are illustrative

High risk defect history *All values shown are illustrative EXAMPLE. This fitter’s modelled risk is 5.125 (which is higher than average due to their defect history) Low risk* Moderate risk High risk* High risk defect history 2.25 >1 Other defect history 1.125 >1 Productivity 0.5 <5 >6 Driving history <3 >6 Length of service 0.5 >3y <1y Driver telematics 0.5 <65 >80 District <0.34 0.25 >0.63 *All values shown are illustrative

Roll out: Model results are updated monthly and guide operational and assurance managers with focused intervention Modelled Risk 9-10 POTENTIAL LATENT RISK Assurance function proactively inspect. Operations monitor HIGHER RISK Operations actively manage 8-9 7-8 6-7 5-6 4-5 IDEAL “Business as usual” KNOWN PROBLEM Operations monitor and ensure corrective actions have been closed out 3-4 2-3 1-2 0-1 1 2 3 4 5 6 7 8 9 10 Recorded Risk

+ Massive quantities of data (opportunity and challenge) There is broad application potential to the rail sector: bridges, lineside boxes, cabling, p-way? Workforce Assets Inspections Productivity ! Dispersed large workforce Limited supervision or lone working Frequent inspections impractical Inspections cannot reveal all defects Large number and dispersed Long asset lives Low probability high consequence failures Productivity = $ But…. too much focus can increase error rate + Massive quantities of data (opportunity and challenge)