prepared by R.A.Barlow 30/056/2016

Slides:



Advertisements
Similar presentations
LIU CABLING & OPTICAL FIBRES STRATEGY Georgi Minchev Georgiev EN-EL-CF.
Advertisements

TE-MPE-TM 09/08/2012, TE-MPE-MS section WIC: Overview of on-going projects + Outlook to LS1 activities: - Short introduction to WIC systems - Booster renovation.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
1 1. Some recent views ( ) 2 Linac tunnel
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
R. Rosol, LIU-PSB review, 10 September BI.DIS Pulse generators R. Rosol, LIU-PSB review, 10 September Luc SERMEUS, Rodolphe ROSOL Laurent.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11.
R. A. Barlow, LIU-PSB review, 20 Nov BI.DIS Pulse generators controls R.A.Barlow, LIU-PSB review, 20 Nov
LIU-PSB BIS presentation / Christophe Martin TE-MPE-EP 28/02/ Beam Interlock System for Transfer Lines & PS Booster Christophe Martin TE/MPE/EP.
LIU-ABT systems: PSB BI.DIS controls prepared by R.A.Barlow (September 2014) 1 CERN TE-ABT-EC.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
EHN1 – EN/EL Progress update J. Devine G. Gross 11/02/16.
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
Technology Department BI.DIS general controls status R.A.Barlow EC section
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
LIU-SPS T. Kramer, L. Ducimetiere, L. Sermeus, J. Uythoven LIU-IONS 20 th November /11/2015 LIU-ABT Review - SPS2.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
Laser Control Status A. Masi, T. Feniet, K. Szczurek Awake Technical Board November 12 th 2015 Thanks for inputs from: M. Donze`, V. Fedosseev, C. Hessler.
Electrical Group Inputs for LIU-Ions J. Devine, on behalf of EN/EL.
Wim Weterings Remy Noulibos
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
Linac4-PSB 160 MeV connection readiness review
ABT-EC EYETS Activities 2nd reports
Outcome of BI.DIS Fast Interlocks Peer Review
PS / Booster septa control
Update on the Critical Path of the PS Booster Schedule for the EYETS
Brief Status SPS Prototype PSB Prototype Installed in LS1
EYETS David Hay EN-OSS.
Jorge Sánchez-Quesada BE-RF-FB
LIU Wire Scanner Milestones June 2017
Complementary ISTC Projects #3888, 3889p
EC Activities Status for LIU September 2017
Injectors BLM system: PS Ring installation at EYETS
LIU–PLI report LIU PSB meeting.
LINAC4 50 MeV phase BIS STATUS
Future Kicker Generator strategy
EC Activities Status for the LIU
T1 Electronic status Conclusions Electronics Cards:
YETS & LS2 Reminder G. Girardot 20 juin 2017.
prepared by R.A.Barlow 13/09/2016
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
n_TOF “Draft” plans for YETS and LS2
Mini-drawers, FE-ASIC , Integrator
TE-ABT Activities for LS2
Status of the BI Work Package in the LIU-PSB frame
TE-ABT PLC and SCADA usage
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
TE/EPC activities for YETS & LS2 LINAC 2-3, PSB, PS & TT2
Capacitive pick-up on MKP: why, when, who, resources, others
Renovation of the 45-year old PS magnets
WPs concerned by L4 connection:
EYETS septa status Septa activities TE/ABT Thierry Masson
EYETS septa status Septa activities TE/ABT Thierry Masson
Special Magnets Controls
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
GIS Portal Racks Project
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
ACS news Circulator TCU: control tests in progress All cavity racks
LLRF and Beam-based Longitudinal Feedback Readiness
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
Electronics, motion control and verification
Thursday
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

prepared by R.A.Barlow 30/056/2016 CERN TE-ABT-EC LIU-ABT systems: PSB BI.DIS10 controls Agenda: https://indico.cern.ch/event/539274/ General controls (Roger Andrew Barlow) Timing system (Christophe Chanavat) IGBT’s R&D program (Tobias Stadlbauer & Luc Sermeus) Fast interlocks studies (Felipe Cordobes Dominguez) prepared by R.A.Barlow 30/056/2016

Generator prototype, Jura 6 BI.DIS10 Generator prototype, Jura 6 Status of technical progress PLC program improvement Recipe's added for settings Some functionalities sill to be implement New TIA library item for automated state machine control (in SCL) To be desired in nearby future: Integration of the triggering optical module inside the PFN Optimization of capacitive dividers pickups Fast interlocks integration Review of logical connection to BIS ongoing (1 channel Vs. 4 channels) …still to be discussed by MPE group, now this looks more like 1 BIS system !

Slow control and cabling production BI.DIS10 Slow control and cabling production PLC controls production 95% PLC modules ordered, arrived ! + a few extra’s ... FSU jobs created for the following: ABTECMAINT-48 Installation components BI.DIS10 in BCER (Linac4/LS2) ABTECPROD-18 Cablage des 6 PFN pour le BI.DIS10 (Naked shells ready) – September 2016 ? ABTECPROD-20 JURA6 BI.DIS10 patch traversant prototype (Change-over proto) – HW done ABTECPROD-21 Pre-production series for PLC crates BI.DIS10 (Master, OP, GPC, EDS) – on-going FSU jobs created for the full production: ABTECPROD-22 Production of series PLC crates for BI.DIS10 (Outside) ABTECPROD-25 Patch panel de series pour BI.DIS10 au BCER (Outside) ABTECPROD-19 Cablage des unites casette IGBT pour le BI.DIS10 (CERN?) Chassis drawings and cabling drawings done, aim to have all this ready by end of MAY-2016 (on-time). PDC production envisaged for September..., however and due to CL workload this will probably be realised in December 2016

PP prototype design for generator changeover BI.DIS10 PP prototype design for generator changeover PP for generator changeover strategy Status of technical progress PP prototype cut out done Improvement for coaxial feedthroughs, new inserts supports 5mm coax, improved attenuation factor, lower risk of reflections... Still to be carried out, modification to JURA6 cage to adapt switch-over strategy.

JU6 H/W for Timing and FSC BI.DIS10 JURA6 HW status JU6 H/W for Timing and FSC KiT’s timing system FSC system Status of technical progress Identified rack space for KiT’s system and FSC Removal of old manual earthing switch Technix PS to be lowered New Ethernet connections demands

PFN shells cabling BI.DIS10 PFN ‘shells cabling’ Status of technical progress Empty PFN shells, to be taken advantage for cabling (prior to coil assembly) Needs all fans + ‘new’ fan assembly Have all the PT100’s To be cabled as per new drawings

DIC/DEC and UPS systems BI.DIS10 DIC/DEC and UPS systems DIC/DEC issues Status of technical progress DIC completed (99.9%), sent to EN/EL Nearly 600 cables ! (guestimate on-par) DEC to be finalized, pre inspection of number of cables in existing BI.DIS + campaign during EYETS to mark cables to be removed and file into a DEC. UPS systems RA302 UPS + standard outlet RA303 RA304 RA305 RA306 RA435 RA301 RA329 RA328  Standard outlet

BI.DIS10 Planning review

BI.DIS10 Documentation PBU-MSMIA-ES-0001 - Functional Specification BI.DIS10 Controls (EDMS 1339372) Released PSB-MSMIA-ES-0008 - Engineering Specification BI.DIS10 controls (EDMS 1574218) Under approval/In Work PSB-MSMIA-ES-0006 - Engineering Specification, Beam Interlock Specification For Booster BI.DIS10 with linac4 (EDMS 1571034) In work PSB-MSMIA-ES-0004 - Functional Specification, BI.DIS10 Fast interlocks (EDMS 1537992) Engineering check PSB-MSMIA-ES-0005 - Engineering Specification, BI.DIS10 Fast interlocks (EDMS 1538154) In work PSB-MSMIA-ES-0007 - BI.DIS10 GENERATOR SPARE CONNECTION TO MAGNET PROCEDURE (EDMS 1571059) Under approval PSB-EQCOD-XX-XXX – Functional Specification, Operational requirements for the controls of the new distributor BI.DIS10 – EDMS ??? – In Work