FGM S/C Integration Requirements

Slides:



Advertisements
Similar presentations
TELESCOPE ANALOG CONTROL Martin Frericks, Frans Zwart.
Advertisements

Watch the following video and answer the questions on your question sheet. Importance of Testing.
Recycling. Recycling – one of a lot of methods of environmental protection. Its aim is to reduce consumption of natural materials and limit quantity of.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
Gauges and well logging
CR1000s are only one part of a data acquisition system. To get good data, suitable sensors and a reliable data retrieval method are required. A failure.
SMART About NASA’s Magnetospheric Multiscale Mission (MMS) MAGNETIC RECONNECTION is a little-understood physical process at the heart of space weather.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.
THEMIS Mission CDRInstrument I&T 1 UCB, June , 2004 Instrument Integration and Test Rick Sterling / Sharon Jelinsky University of California – Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
Research Activities of HFCV Rule-making in Korea Sept. 24 ~ 26, th HFCV-SGS Meeting Ministry of Land, Transport and Maritime Affairs, Korea Transportation.
Main task  Development, calibration and operation of spaceborne magnetometers Main research topics 1.Building and test of space magnetometers  Integration.
1 / 13 05/2002 Electrical/Component Testing. 2 / 13 V + – H Menus (wiggle test) Connector check Harness (visual) Harness check (supplies and ground) Component.
ARISSat-1 Control Panel and Safety Circuitry Jerry Zdenek
IMPRS June Space Research, in praxis, illustrated by a ground-based example The „Ozonometer“ as a student project.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
Heliocentris Commercial Confidential 1 Integration of Industrial Fuel Cells in Technical Applications Using the NEXA ® Training System Dr. Claus Fischer.
1 Safety and Preventative Maintenance. 2 MB, One megabyte - MB or M-byte - represents about 1 million (10 6 ) bytes. Precisely, 1 MB = = 1 kB x 1 kB =
STEREO - Solar Terrestrial Relations Observatory Mission STEREO STEREO Science Team Meeting May 2, 2005 Presented by Edward Reynolds APL STEREO Project.
Mechanical Integrity Written Procedures. Lesson Objectives  Describe Required Written Procedures for Establishing an MI Program  List Acceptable Sources.
DINO PDR 23 October 2015 DINO Systems Team Jeff Parker Anthony Lowrey.
ASPOC & PICAM IWF/ÖAW GRAZ1 Main task  Development of hard- and software for flight instruments Main research topics 1.Magnetospheric MultiScale  Development.
THEMIS FGM CDR Peer ReviewBerlin, April 6, 2004 THEMIS FGM Engineering Peer Review SC Integration and Test Ellen Taylor University of California - Berkeley.
THEMIS Instrument FM2/FM3 PERFGM 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Fluxgate Magnetometer (FGM) Dr Ellen Taylor.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.
1 wp4 – Assembly Integration Verification of the System Testbed for Trial 2 Barcelona 3/03/05 Marco Bobbio Pallavicini Carlo Gavazzi Space SpA.
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
FGM peer PDR I/F - 1 Braunschweig, October 8-9, 2003 Digital Interface (I/F) Aris Valavanoglou Institut für Weltraumforschung (IWF) Austrian Academy of.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
社内資料社内資料 E-P Regulator for High Pressure up to 5.0MPa ITVX Series * This product is only for blowing, and does not have sufficient control for other application.
FGM peer CDR GSE - 1 Berlin, April 6, 2004 Ground Support Equipment Concept (GSE) Werner Magnes Institut für Weltraumforschung (IWF) Austrian Academy of.
FGM peer PDR GSE - 1 Braunschweig, October 8-9, 2003 Ground Support Equipment Concept (GSE) Werner Magnes Institut für Weltraumforschung (IWF) Austrian.
UC-12 L1 Flight Track over Ground Sites.
THEMIS MRRI&T − 1GSFC, January 5, 2007 Integration and Test.
FGM peer CDR FGS - 1 Berlin, April 6, 2004 FGS Mechanical Design Hans-Ulrich Auster Institut für Geophysik und Meteorologie TU Braunschweig.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 P.Berg1 STEREO IMPACT POWER SUPPLIES Peter Berg, UC Berkeley Space Sciences Lab,
IDPU F1 Test Review FGM Fluxgate Magnetometer Michael Ludlam University of California - Berkeley.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Design Fluxgate Magnetometer (FGM) Werner Magnes Institut fuer Weltraumforschung (IWF) Austrian.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
Recycling. By Imogen Ashcroft. What can we recycle? Why is recycling so good for our planet? How is it recycled?
THEMIS-SCM SCM – OVERALL RESSOURCES – STATUS versus REQUIREMENTS ItemSpecificationStatus Sensor Bandwith Sensor Sensitivity Up to 4 kHz 1 pT/√Hz at 10.
RamRack Conceptual Design Review Colorado State University Zach Glueckert Christopher Reed Timothy Schneider Brendan Sheridan Christina Watanuki Advisor:
Status of the SWAP instrument
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
Electronic Control Unit (ECU)
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
Checklist for Excellence in NeSSI Surface Mount Components
Solar Probe Plus FIELDS
Solar Probe Plus FIELDS V5 Mechanical Pre-Ship Review April 10, 2017
FIELDS SCM Thermal iPER
Solar Probe Plus FIELDS Main Electronics Package iPER EMC Feb 2, 2017
Operational Description
PHI Status Report SO Cleanliness Working Group #24
SXC integration and test
Test and Verification C. J. Sweeney Boston Univ..
GLAST Large Area Telescope:
Hazardous Waste Any waste that is a risk to the health of humans or other living things Solids, liquids, and gases Often contain toxic, corrosive, or.
Solar Orbiter EUI Extreme UV Imager
Plasma Cleaning Safety Presentation
Creating Electrical Circuits
GLAST Large Area Telescope
Technical Features.
Presentation transcript:

FGM S/C Integration Requirements Werner Magnes Institut für Weltraumforschung (IWF) Austrian Academy of Sciences

Constraints Safety and dependability constraints Normal precaution No pyros, batteries, radioactive material, pressurized containers etc. No limited life time items Environmental constraints Clean room class 100.000 more than sufficient No contamination sensitive areas FGS storage temp.: -100 °C ... +100 °C FGE storage temp.: -50 °C ... +65 °C Mechanical constraints No special mechanical treatment necessary FGS delivered in Aluminium sealed containers

Electrical constraints Constraints / MLI Electrical constraints Connector savers will be used for sensor and FGE connector No restrictions to power ON/OFF during on-ground testing Inputs to system level tests Mu-metal can for all flight sensors (MGSE) All functional tests before and after environmental tests Test MLI blankets (supplied by UCB, TBC) Vibration TV / TB EMC (TBC) FGS MLI Test MLI replaced by Flight MLI at launch site