Excelsior Energy’s Mesaba Energy Project

Slides:



Advertisements
Similar presentations
Excelsior Energy’s Mesaba Energy Project Update for the NM-SPG August 16, 2006.
Advertisements

March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Wind Energy and Transmission South Dakota Legislative Briefing Pierre, South Dakota January 18, 2006 Beth Soholt Director Wind on the Wires.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Public Service Company of New Mexico
Queue Reform at the Midwest ISO NARUC February, 2008.
Twin Cities Minnesota Zone Meeting Xcel Energy October 27, 2004 St. Paul, MN.
Buffalo Ridge Incremental Generation Outlet (BRIGO) Transmission Study Presentation to National Wind Coordinating Committee June 22, 2005 W Grivna, PE.
Topics to Cover Interconnection Process Overview
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Potential Transmission Construction Scheduling In Southern Minnesota--- Fall Spring 2006 Xcel Energy has posted Significant Transmission construction.
ISO Exhibit 13 Federal Energy Regulatory Commission Technical Conference on Connecticut Infrastructure Reliability and Operability Committee Update Hartford,
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
The Need for Electric Transmission Improvements in Dane County.
0 CapX /1/2015 CapX 2020 Transmission Plan: Ensuring Reliable Electricity.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
1 Transmission Line Projects in Maryland – an Overview Sandra S. Patty PPRP - Manager, Transmission Projects PPRAC Meeting Country Inn & Suites, Annapolis,
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
Large Generator Interconnection Procedures Reform Stakeholder Meeting February 19, 2009.
BTA Workshop May 22, 2008 Ten-Year Transmission Plan for the Santa Cruz Water & Power Districts Association (“Santa Cruz”) 10/26/2015K.R. Saline & Assoicates,
Renewables Integration Development Project North West of the Island of Ireland Louis Fisher, EirGrid.
2011 Transmission Customer Meeting October 12, 2011.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
March 30, 2012 Wholesale Generation Interconnection Process Photovoltaic Program Power Purchase Agreements Request for Offers.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
2013 Wind Conference. Transmission Service Study Process Steve Purdy.
2006 SPP RTO Expansion Plan Carl A. Monroe July 30, 2006.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting November 19, 2008.
Big Stone II – Delivery Study Phase 6 and Supplemental #2 For Northern MAPP SPG Meeting 4/3/07 Elk River Richard Dahl Missouri River Energy Services.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
3/28/2008 RPG CREZ Meeting CREZ Transmission Optimization (CTO) Study And The Oscar Goes To… Warren Lasher Manager, System Assessment.
POWER SYSTEM PLANNING CHARTER AND PROCESSES Presentation to TAC May 6, 2004 Transmission Services Ken Donohoo, Manager of System Planning Dan Woodfin,
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Generator Interconnection Studies & Agreements Charles Hendrix.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
2016 Projected Attachment O-PPI Open Stakeholder Meeting
Freeport Area Master Plan Project -
2016 RTP Update November, 2016 RPG Meeting.
Loan Project of Construction of Iran-Armenia 400kV third power transmission line (“ Noravan’’ 400/220/20 kV) and related substation.
Generation Interconnection Summary
Presentation to the Enron Corp. Finance Committee
Green Energy and Green Spaces
Excelsior Energy’s Mesaba Energy Project
SMMPA Attachment O 2017 Annual Meeting
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
TIMELINES PHOTOS This is an example text
TIMELINES PHOTOS This is an example text
SMMPA Attachment O 2016 Annual Meeting
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Rates & Regulatory Updates
Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair
Dominion Investments in Virginia
2017/18 Payment Calendar Due Date Cut-off Day 1st of every month
MN State Aid Finance Updates
McDonald’s Kalender 2009.
MN State Aid Finance Updates
SMMPA Attachment O 2018 Annual Meeting
McDonald’s calendar 2007.
Strategic Planning Timeline Overview
Beth Soholt Director Wind on the Wires
Excelsior Energy’s Mesaba Energy Project
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Actions Updates Action 0282/006 – Exclude from AQ process
ICA Methodology Clarifications ICA Working Group 5/18/2016
McDonald’s calendar 2007.
2015 January February March April May June July August September
CBC Implementation Updates
Presentation transcript:

Excelsior Energy’s Mesaba Energy Project Update for the NM-SPG August 16, 2006

Current Project Parameters Two 606MW IGCC units ISDs 2011 and 2013 Primary Site- West Range POI---Blackberry 230kV Sub Near Taconite, MN in Itasca County Alternate Site- East Range POI---Forbes 230kV Sub Near Hoyt Lake, MN in St. Louis County Designated as an Innovative Energy Project under special MN Legislation

MISO LGIP Current Status

Transmission Progress to Date Transmission Concept Screening Study July 2003 East Range GO Analysis August 2004 East Range GI Request to MISO October 2004 Queue # 38280-01, Project G477 First Unit 531/552MW ISD 2010 Network Resource Service G477 Feasibility Study Report March 2005 6 months West Range GO Analysis May 2005 West Range GI Request May 2005 Queue # 38491-01, Project G519 First Unit 600MW ISD 2010

Transmission Progress to Date G519 ‘Out of Queue’ Study Agreement August 2005 West & East Range Preliminary GO Facilities Engineering Designs December 2005 West & East Range GO Analyses Updates December 2005 G519 Feasibility Study Results December 2005 8 months G477 & 519 System Impact Study Results April 2006 11 and 19 months G477 & 519 restudy of short circuit results July 2006 Second unit GI request submitted January 2006 Designated G597

Transmission Progress to Date G597 Feasibility Study Report July 2006 G477&519 Facilities Studies underway July 2006 MP has contracted to perform G597 SIS Agreement Executed August 2006 Note: Between July 2004 and December 2005 Excelsior performed six series of powerflow studies to evaluate GO facilities and network reinforcements

MISO Study Results Project G477 SIS (Forbes POI) Powerflow : No problems identified Short Circuit : Several pre-existing over-dutied breakers but no new ones caused by G477 Stability : All simulations are stable and within damping criteria. No transient low voltage violations. Deliverability Analysis: Failed Awaiting MISO study proposal to continue NRIS process TSR submitted by Xcel for NITS (local capacity resource)

MISO Study Results Project G519 SIS (Blackberry POI) Powerflow : Some issues identified during contingencies. Resolved with the addition of a new Boswell-Riverton 230kV line. Short Circuit : Several pre-existing over-dutied breakers delete [plus four new 115kV breakers at Nashwauk Sub due to G519] Stability : All simulations are stable and within damping criteria. No transient low voltage violations. New Boswell-Riverton 230kV line was included in these studies. Deliverability Analysis: Failed Awaiting MISO study proposal to continue NRIS process TSR submitted by Xcel for NITS (local capacity resource

MISO Study Results Project G597 Feasibilty Study (Blackberry POI) Powerflow: numerous local contingency violations identified Not unexpected with both MEP II and new 800MW NE MN unit included without any network upgrades Short Circuit: four Nashwauk 115kV breakers overdutied Note: Modeling didn’t include proposed Minnesota Steel Plant or CAPX 2020 Projects

Other Mesaba Energy Project Progress Filing made 12/23/05 with MPUC for a PPA with Xcel Energy under Innovative Energy Project Legislation Joint Siting/Routing Application made 6/16/06 for both units, all GO facilities, and gas pipeline. Application accepted as complete 7/6/06.

Proposed GO Facilities G519: 9 mile double circuit 345kV steel pole structures, operated 230kV for MEP I G477: Two 345/115kV steel pole lines replacing existing 115kV structures for most of their 34 and 37 mile routings, with 345kV side operated 230kV for MEP I

West Range GO Facilities

West Range GO Routings

East Range GO Facilities

East Range GO Routings

Questions??