720A ½”-2”.

Slides:



Advertisements
Similar presentations
350, 350XL 1¼ - 2. Modification Overview Production of the 1¼ began in 2004 and is current. Production of the 1¼ began in 2004 and is current.
Advertisements

RP-500 ½- 1. Modification Overview Production of the RP500 began in 2007 and is current. Production of the RP500 began in 2007 and is current.
¾”-2”. Modification Overview  Production of the series began in 1989 and is current.  Early models of ¾”-2” series did not always.
860 (LF), 880 ½”- 2” 860 (LF), 880 ½”- 2”. Modification Overview  Production of the ½ - 2” 860 series began in 1997 and is current.  The 880 is an “N”
350, 350A 2½”-12”. Modification Overview  Production of the 2½ - 10” sizes began in  Production of the “A” models began in This Indicates.
975, 975XL ¾”-2” 975, 975XL ¾”-2”. Modification Overview  Production of the original 975 began in This version had buna-n check discs and did not.
975DA 2½”-10”. Modification Overview  Production of the 975DA began in 1993 and was discontinued in  The 975DA uses a ¾” 975XL for the bypass.
765 ½”- 2”. Modification Overview  Production of the 765 began in 1975 and is current.
200B ½”-2”. Modification Overview  Production of the 200B (Watts 719) began in 2003 and is current.
825Y(YA) 3/4”-2”. Modification Overview  Production of the 825Y began in 1978 and is current.  The 825YR ( ) had replaceable check seats. **
800 (M2,M3,M4) ½”-2”. Modification Overview  The original model 800 was produced from  The 800M2 was produced from  The 800M3.
375, 375XL ¾”-1”. Modification Overview  Production of the ¾”-1” 375 began in 2004 and is current.  The lead free version 375XL was introduced in 2010.
475, 475V 2½”-3”. Modification Overview  Production of the 2½ - 3” sizes began in  The lead free version (XL) was introduced in 2011.
4V-500 ½”-2”. Modification Overview  Production of the 4V-500 PVB began in  The 4V utilizes a float assembly that contains a relief valve that.
½”-10”. Modification Overview  Production of the series began in 1989 and is current.
4S-100, 4SG-100 2½”-10”. Modification Overview  Production of the 4S-100 aka (DC4S) began in  The 4SG-100 was introduced in The “G” indicates.
009 (M3) ½”-2” 009 (M3) ½”-2”. Modification Overview- 009  009 ¾-1” ( ) (1” ) ¾-1” ( ) (1” ) 1¼ -2” ( ) 1¼.
RPZ 2½”- 10” RPZ 2½”- 10”. Modification Overview  Production of the RPZ in sizes 2½ - 10” began in 1993 and is current.
5000CIV 21/2”-10” 5000CIV 21/2”-10”. Modification Overview  Production of the 5000CIV (Watts 909RPDA) began in 1998 and is current.  The 5000CIV utilizes.
375, 375XL 1¼” -2”. Modification Overview  Production of the 1¼” -2” 375 began in 2004 and is current.  The lead free version 375XL was introduced in.
RPZ, RPZE ½”-2”. Modification Overview  Production of the model RPZ began in  The lead free version ( RPZE ) was introduced in 2002 and is current.
450 4”-10”. Modification Overview  Production of the 4” - 10” sizes began in  The lead free version (XL) was introduced in 2011.
PVB ¾”- 2”. Modification Overview  Production for the ¾” – 1” PVB began in 1995 and is current.  The body of the ¾” – 1” PVB was modified in July of.
”-10”.
½”-10”.
475, 475V, 475XL 4”-10”.
826YD 21/2”-10”.
009 2½”-3”.
RP4A (LF) ½”-2”.
PVB-4A ½”- 2”.
420, 420XL ¾”-1”.
007 2½”-3”.
800 (M2,M3,M4) ½”-2”.
830, 831 4”- 6”.
DCV, DCVE ½”-2”.
¾”-2”.
007DCDA 2½”-3”.
½”- 2”.
3000CIV 21/2”-10”.
½”-10”.
007DCDA 2”.
¾”-2”.
450 2½”- 3”.
DC4A (LF) ½”-2”.
RPZ-II, RPZE-II ½” , ¾” , 1½”.
909 3/4”-2”.
4000B (M3) ½”-2”.
4D-100, 4D-600 2½”- 10”.
DC-500 ½”- 1”.
350, 350XL ¾”- 1”.
850 (LF) ½”- 2”.
719 ½”-2”.
950, 950XL, 950XLT ¾”-2”.
909 21/2”-10”.
709DCDA 2½ ”-10”.
975 2½”-10”.
3000B 2”.
2000CIV 2½ ”-10”.
007 2½”-3”.
4000CIV 21/2”-10”.
375DA 2½”-10”.
919 ¾”-2”.
950DA 21/2”-10”.
007DCDA 2½”-3”.
007DCDA 2”.
3000B 2”.
450DA 4”-10”.
909 RPDA 21/2”-10”.
709 3/4”-2”.
709 2½ ”-10”.
Presentation transcript:

720A ½”-2”

Modification Overview Production of the 720A began in 1984 and is current. In 2010 the test cocks were moved from the body to the inlet and outlet shutoff valves.

Canopy Removal The canopy is secured by three screws.

Bonnet Removal The bonnet is threaded into the body and sealed by an o-ring and a plastic washer. Unscrew the bonnet counter clockwise. There is no spring load.

Float Poppet Removal The float is free once the bonnet has been removed.

Float Poppet Service To replace the upper disc, unscrew the guide stem from the poppet.

Check Valve Spring Removal The check spring is held in place by a groove in the body. Work the spring until it clears the body and lift out.

Check Disc Replacement AKA spider assembly. The check poppet is free once the spring is removed. The disc is free once the screw and guide are removed.

Check Seat Replacement The check seat is part of the body. If the seat is damaged the assembly must be replaced.

Reassembly Notes Reassemble in reverse order. Place the small end of spring down in the body. Make sure the large end of the spring is secured in the body groove. Lubricate the bonnet o-ring.