Implementation of Connection Codes in Norway

Slides:



Advertisements
Similar presentations
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Advertisements

Jose Braz, ERGEG Conference on Implementing the 3rd Package 11th December 2008 The Agency for the Cooperation of European Energy Regulators.
Click to edit title Click to edit sub-title The European Network of Transmission System Operators Stockholm 14th of September 2009 Teun van Biert - Convener.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Lord Mogg Chair of ERGEG Florence Forum June 2009 Implementation of the Third Energy Package.
1 ENISA’s contribution to the development of Network and Information Security within the Community By Andrea PIROTTI Executive Director ENISA Cyprus, 28.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
Status Implementation of the 3rd package Norway 10th Baltic Electricity Market Mini-Forum June 4, 2010 Anne Dønnem, NVE.
Implementation of 3 rd Energy Package: latest developments in Lithuania 1 Kęstutis Žilėnas Ministry of Energy, Lithuania 11 th Baltic Electricity Market.
GROUP 3. Establishing a Uniform System of Accounts (USoA) for the NESI The USoA establishes the regulatory accounting reporting framework for all licensees.
Implementing the NIHSS In Your Organization January 2008.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
1Presentation of CASCO SMA 5 June International Organization for Standardization.
Legal Metrology in Europe: Harmonising requirements trough directives and the cooperation of authorities trough WELMEC by Knut Lindløv Director Legal.
Work Package 2 Targeting innovation chain processes to tackle Societal Challenges Task 2.2 Involvement of society in societal challenges.
1 page 1 C O U P L E D NWE Day Ahead Project Update FUI IG Mtg – London 13 th September 2010 ENTSO-E Regional Group Northwest Europe C O U P L E D.
Monitoring Forest Resources for SFM in the UNECE Region
INSPIRE and the role of Spatial Data Interest Communities (SDIC)
Transposition of European Network Codes
GUIDELINES Evaluation of National Rural Networks
10 year investment plan ERGEG approach and contribution
19th GRI Coordination Group meeting
Ministry of Industry and Commerce
SBS and the Construction Sector
European Insurance and Occupational Pensions Authority Introduction
Overview of U.S. Participation in ISO and IEC
Grid Code What is the Standard Modification Process? Panel
Implementation of Connection Network Codes The French process
REPORT OF THE ELECTRONIC WORKING GROUP UNEP(DEC)/CAR WG.29/INF.12
Grid Code Development Forum – 6 September 2017
NWE Day-Ahead Price Coupling
Grid Code Review Panel 16th August 2017
KORRR INFORMAL STAKEHOLDER WORKSHOP
Topic Operational Information Exchange
Economic Regulation of Irish Water
DG Environment, Unit D.2 Marine Environment and Water Industry
WG Belgian Grid Implementation Network Codes.
Implementation of Connection Codes in Norway
Guidance on Natura 2000 and Forests – Scoping Document
Implementation of Connection Network Codes The French process
EU Reference Centres for Animal Welfare
Guidance on Natura 2000 and Forests – Scoping Document
Marine Strategy Framework Directive (MSFD)
LITGRID AB Implementation of EU Connection Network Codes
Regulatory Framework and NC implementation in Finland
EU Netcode Emergency & Restoration
MD & NS validation workshop
The partnership principle in the implementation of the CSF funds ___ Elements for a European Code of Conduct.
SOCIAL DIALOGUE WITHIN EUPAN
Assessment of Quality in Statistics GLOBAL ASSESSMENTS, PEER REVIEWS AND SECTOR REVIEWS IN THE ENLARGEMENT AND ENP COUNTRIES Mirela Kadic, Project Manager.
Marine Strategy Framework Directive (MSFD)
Connection Codes Implementation
WFD, Common Implementation Strategy   Water Scarcity and Droughts Expert Network Brussels, July 2, 2009.
Information on projects
Hans Dufourmont Eurostat Unit E4 – Structural Funds
ETS WG role and working methods
LNG Workshop Bilbao, March 13th 2009 GLE.
Fitness Check EU Water Policy
Item 4.2 – Towards the 2016 AES Philippe Lombardo Eurostat-F5
Green Infrastructure: Working method
Hans Dufourmont Eurostat Unit E4 – Structural Funds
Finalisation of study report
5.b3 Monitoring & Reporting 2019
Implementation of Connection Codes in Norway
LITGRID AB Implementation of EU Connection Network Codes
Finalisation of study report
Capacity Access Review
Presentation transcript:

Implementation of Connection Codes in Norway Norwegian Water Resources and Energy Directorate (NVE) Brussels, 23rd September 2015 Astrid Ånestad, Staff Engineer

Todays practice By national regulations, the TSO shall approve the technical solutions of all new (or major changes in existing) grid units and generators connected on high voltage. Requirements stated in guideline from TSO. Connection agreements are made between grid users and grid system operators on all voltage levels.

The role of the TSO (Statnett) NRA has asked the TSO to assess the connection codes for national implementation Overview of where the connection codes will change todays practice. Where there are opening for, and necessary with, national adaptations, clarify wanted proposals for requirements. Cooperate closely with national stakeholders. Focus on technical assessments. Deliver proposals for general national requirements to the NRA.

The role of DSOs, grid users Participate in the working groups for discussions on specific technical assessments. Contribute on views and suggestions to the TSO in the proses of formulating proposals for general national requirements. Ensure that all relevant technical issues are addressed.

The role of the NRA (NVE) Arrange organisation meetings Involve mayor industry organisations. Clarify overarching issues during the implementation assessment. Participate as observers in discussions between the TSO and stakeholders groups organised by the TSO. Approve final proposal for general national requirements. Adjusting current relevant regulations where necessary

Connection codes national implementation – Norwegian case Brussels, 23 st September 2015 Stian Boye Skaatan, Advisor

Statnett will deliver recommendations to the NRA Consider how the technical requirements should be specified to suit Norwegian conditions Suggest how the processes and responsibilities should be defined in Norway Be based on the existing guideline "Functional requirements for the Norwegian power system" Work closely with the industry and industry organizations Fremtiden er elektrisk

NRA - Industry organization forum Organization of workgroups and industry organization involvement NRA - Industry organization forum Fremtiden er elektrisk

Statnett prepares draft on requirements for each work package Workgroup comments and views obtained and adjustments agreed Closing of work package Working method Final review of all work packages One year manufacturer product development and enter into force NRA - Approve final proposal for requirement NRA – Sends draft/recom-mendations for public consultation Statnett - deliver recommen-dations to NRA Fremtiden er elektrisk

Schedule Code 2014 2015 2016 2017 2018 2019 RfG DCC HVDC NRA NRA NRA Requirements for generators DCC Demand connecion code HVDC High Voltage Direct Current Connections Q4/15 Q4/16 Q4/17 NRA Q4/18 Establishment Q1/16 National implementation Implementation by NRA Q1/17 Q1/18 Manufacture product developm. NRA Q1/19 Enter into force Q1/16 Q1/17 Q1/18 NRA Q1/19 Fremtiden er elektrisk

Involvement of stakeholders Total of 25 external participants in the WGs. Participants from: DSOs Different type of industry Hydropower and wind power experts HVDC experts Standardisation organisations NRA as observer in WGs Fremtiden er elektrisk

Deliveries to the NRA One document per Network Code. Consist of suggestions and base for a Norwegian legislation, as well as an interpretation document. Include a written submission that reviews disagreements between Statnett and WG participants. Include an explanation of why Statnett has chosen to put forward their given suggestions. Fremtiden er elektrisk

Key Challenges Implementation through EEA (European Economic Area) – only for non EU members. Involvement of smaller industry players and petroleum sector. Time frame and resources. Fremtiden er elektrisk

Thank you for your attention! Questions?? Thank you for your attention! Fremtiden er elektrisk