SCRF Monthly WebEx Meeting Jan. 12, 2010

Slides:



Advertisements
Similar presentations
SCRF Monthly WebEx Meeting June 2, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
Advertisements

WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Summary and Discussion AAP-SCRF-Summary.
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto,
SB2009/ Low energy running for ILC International Workshop on Linear Colliders 2010 Andrei Seryi John Adams Institute 19 October 2010.
Chair’s report (John) Editor status reports (editors) Special section on XFEL (Nick) AOB (all) 1 TEB Meeting 15 June 2012 Global Design Effort John Carwardine.
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
ML Planning for ILC08 First Pass Chris Adolphsen Hitoshi Hayano.
R&D Expected in Cooperation with Vendors ILC Baseline Assessment Workshop Mark Champion September 09, 2010.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
AD & I 15 August 2012 Marc Ross R&D for TDR Summary of TDP R&D items and baseline changes to RDR – to be included and highlighted in TDR text
SCRF Meeting Fermilab, April 21-25, 2008 Draft agenda updated, April-10 General Agenda: 4/21: Cavity: Gradient R&D, performance, diagnostics (S0), 4/22:
SCRF Parallel Sessions at TILC09 GDE 活動報告 3月30日(月)10時~ 3号館7階会議 室 設楽 哲夫.
1.Report from PMs 2.Report from GLs 3.Special report and discussions 1.SCRF report at AAP and response from AAP (C. Ginsburg, R. Geng) 2.S1-Global assembly.
AS TAG Leaders Meeting PM Report. Topics R&D Plan release 4 ADI WebEx meetings (cost and design) Central region integration face-to-face meetings.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
ILC e - and e + sources overview Jim Clarke STFC Daresbury Laboratory, UK On behalf of ILC Positron Sources Group.
ILC Gradient R&D Rongli Geng Jefferson Lab ILC Main Linac WebEx Meeting July 28, 2010.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
GDE ML-SCRF: FuzeBox Meeting Feb., 13, Reports from PMs ILC-GDE SCRF schedule Reports from the External Cost Review and actions/responses required.
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
Technical Board Report TESLA Technology Collaboration Meeting, Dec. 5 – 8, 2011, IHEP, Beijing, China TESLA Technology Collaboration Meeting, Dec. 5-8,
Global Design Effort Controls LLRF EDR Kick Off Meeting View from the Project Management Office Fermilab / ANL August 20, 2007.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
Plan for the First Baseline Assessment Workshop (BAW-1) Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers to be discussed at GDE/ADI.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
SCRF: Monthly WebEx Meeting Oct., 19, 2011
SCRF WebEx Monthly Meeting Agenda and Reports from PM
SCRF Monthly WebEx Meeting May 6, 2010
Project Management: Nick Walker Akira Yamamoto Marc Ross
SCRF-ML Technology Industrialization
SCRF Monthly WebEx Meeting Sept. 22, 2010
ILC Project Management Status
ILC ‘Engineering Design’ (ED) Phase
SCRF Monthly WebEx Meeting May, 6, 2011
SCRF Monthly WebEx Meeting May 20, 2009
Global System Kick-off Meeting
ILC-EDR Kick-off Meeting, Cryomodule and Cryogenics
Status Update for NRI Commissioned Survey
BAW Prep S1 Global Status Pilot Plant Status
Yamamoto WG3: ML-SCRF Parallel Session,
2. SCRF General Preparation for the AD&I Preparation for AAP Review
Technical Design Report preparation
ML-SCRF: Monthly WebEx Meeting Dec., 19, 2012
, A. Yamamoto SCRF WebEx Meeting.
WG3: Main Linac SCRF(cavity,cryomodule)
ILC Global Design Effort
Barry Barish GDE Caltech
Nick Walker (DESY) EU GDE Meeting Oxford
Yasuhiro Okada, Executive Director, KEK
ILC Cryogenics -- Technical Design Report Planning
ILC - Global Design Effort
Presentation transcript:

SCRF Monthly WebEx Meeting Jan. 12, 2010 Agenda Report from PMs (10 min.) General plan Report of visiting JLab (Yamamoto/Ross) Visit to industry (Yamamoto) Preparation for the BAW-2 (Ross/Walker) General Report from GLs (10 min.) Cavity Gradient (R. Geng) Cavity Integration (H. Hayano) Cryomodule (N. Ohuchi) Cryogenics (T. Peterson) HLRF (S. Fukuda / C/ Nantista) ML Integration (C. Adolphsen) Special Discussions (40 min.) Interim report final draft (each original author/editor) A. Yamamoto 110112 SCRF WebEx Meeting

Schedule related to SCRF Dec. 15: SCRF-webex Jan. 6-7: Visit to JLab Jan. 12: SCRF-webex, today! Jan. 18 – 21: BAW-2, SLAC Feb. 8,9, 18: Visits to Asian SCRF C/C industry Feb. 28 – Mar. 3: TTC at INFN/Milano March 3, 4 : Visits to EC SCRF C/C industry March 14-17: Visits to AMs SCRF C/C industry March 19 – 23: GDE/ALCPG, Univ. Oregon, Eugene, A. Yamamoto 110112 SCRF WebEx Meeting

Agenda of JLab-GDE Meeting on Jan. 6 and 7, 2011 A. Yamamoto 110112 SCRF WebEx Meeting

Objectives of Visiting JLab High Gradient Cavity R&D Possible JLab’s effort and Cooperation with GDE GDE SCRF Cavity Gradient Research leadership (group leader’s role) Industrialization Learn JLab’s effort for the new production/process facility Cost effective process Vertical EP process development Possible contribution to the ILC cavity/cryomodule process / assembly / Test A. Yamamoto 110112 SCRF WebEx Meeting

Notes from Discussions GDE cavity gradient research leadership Rongli Geng will stay as the group leader ~ 25 % of his capacity Focus on high gradient research Extend the work on the yield data-base in cooperation with Camille’s data-base team Expect his stable work on during TDP-2 JLab’s further contribution to GDE and SRF cavity R&Ds Continue and extend high field gradient Establish vertical EP process and technology Be willing to reserve further contribution/share to future and possible ILC construction activity by using the new C100 CIP facility at JLab A. Yamamoto 110112 SCRF WebEx Meeting

Preparation for Visiting Vendors Prepare for the technical documents: Technical specifications of Nb material/sheet, Cavity component and integration, and Cryomodule component and assembly Presentation file Place them on a URL Target date : Jan 30, after getting approval of EC. Establish the visiting plan and members PMs (at least, two) Regional Directors (can be regionally shared) Cost-experts (can be regionally shared) SCRF cavity/cryomodule experts from Laboratories (can be regionally shared) A. Yamamoto 110112 SCRF WebEx Meeting

Plan for Industrial Communication Period Occasion Action Items Oct. 20 IWLC-10: GDE SCRF Discuss ‘cavity and CM specification’ and industrial model, and study plan 25-26 Visit DESY Learn E-XFEL cavity and cryomodule specification and procurement Nov. 11-12 ILC-PAC Report the study plan / preparation plan for industry Dec. 9 Visit Saclay Learn E-XFEL cryomodule assembly contract: Hosted by Saclay lab., and contracted by companies Jan. 6 Visit JLab Lean new production/process facility Discussion on process industrialization w/ vertical EP Jan. Complete the technical specification, and Distribute it to possible vendors April/May Receive responses from vendor Complete new cost estimate A. Yamamoto 110112 SCRF WebEx Meeting

Plan for Visiting Vendor No. Date Company Meeting Place Technical sbject Notes 1 2/8 Hitachi Hitachi / Tokyo Cavity & Cryomodule 2 Toshiba Toshiba / Tokyo 3 2/9 MHI MHI / Kobe 4 Tokyo Denkai TD / Tokyo Nb Material / Sheet 5 2/18 NingXia, NTIC NTIC / NingXia 6 3/3 Zanon INFN / Milano 7 3/4 RI RI, Koeln 8 3/14 AES AES, Cavitu & Cryomodule 9 3/15 Niowave 10 3/16 PAVAC 11 3/17 Wachang (?) In Oregon (?) GDE members: PMs, and RDs / Cost-experts / Experts from Lab (shared regionally) A. Yamamoto 110112 SCRF WebEx Meeting

BAW-2 Agenda, Jan. 18, 11:00 Linac KCS 45' 16:05 Cryo 15' Reduced Bunch Number 09:00 Welcome 15' Speaker: Norbert Holtkamp (SLAC) 09:15 Top Level Change Control 15' Speaker: Barry Barish (GDE) 09:30 Overview 1h00' Speaker: Marc Ross (FNAL) 10:30 break 30' 11:00 Linac KCS 45' Speakers: Chris Adolphsen (SLAC) , Christopher Nantista (SLAC) 11:45 DRFS 45' Speaker: Shigeki Fukuda (KEK) 12:30lunch 1h30’ 14:00 DR and upgrade 1h00' Speakers: Susanna Guiducci (INFN) , Mark Palmer (Cornell University LEPP) 15:00 Bunch Compressor 20' Speaker: Nikolay Solyak (FNAL) 15:20 break 30' 15:50 e- 15' Speaker: Axel Brachmann (SLAC) 16:05 Cryo 15' Speakers: Tom Peterson (FNAL) , 16:20 Discussion 1h00' A. Yamamoto 110112 SCRF WebEx Meeting

BAW-2, Jan. 19 Reduced Bunch Number 09:00 CFS 30' Speaker: Victor Kuchler (Fermilab) 09:30 Cost Impact 1h00' Speaker: Peter Garbincius (FNAL) 10:30 break 30' 11:00 BDS at reduced beam parameters 1h30' Speaker: Andrei Seryi (John Adams Institute) 12:30lunch 1h30’ 14:00 Physics impact 1h30' Speaker: Jim Brau (U. Oregon) 15:30 break 30' 16:00 Summary / discussion 1h30' Speaker: Nicholas Walker (DESY) A. Yamamoto 110112 SCRF WebEx Meeting

BAW-2, Jan. 20 Positron Source Relocation 09:00 Overview and Layout 45' Speaker: Ewan Paterson (SLAC) 09:45 Positron system performance 45' Speaker: Gai 10:30 break 30' 11:00 DRFS operation at lower gradient (10Hz) 30' Speaker: Shigeki Fukuda (KEK) 11:30 KCS operation at lower gradient (10Hz) 30' Speakers: Chris Adolphsen (SLAC) , Christopher Nantista (SLAC) 12:00 CFS for 10 Hz 30' Speaker: Victor Kuchler (Fermilab) 12:30lunch 1h30' 14:00 DR @ 10 Hz 30' Speakers: Susanna Guiducci (INFN) , Mark Palmer (Cornell University LEPP) 14:30 Source @ 10 Hz 30' Speaker: Axel Brachmann (SLAC) 15:00 Alternate pulse operation in electron Main Linac 30' Speaker: Kiyoshi Kubo (KEK) 15:30 break 30' 16:00 Cost implications 1h00' Speaker: Peter Garbincius (FNAL) 17:00 Discussion 30' A. Yamamoto 110112 SCRF WebEx Meeting

BAW-2, Jan. 21 Positron Source Relocation 09:00 Undulator R & D 30' Speaker: Jim Clarke (STFC Daresbury Lab) 09:30 Physics performance issues 1h00' Speaker: Jim Brau (U. Oregon) 10:30coffee 30' 11:00 Summary / discussion 1h30' Speaker: Nicholas Walker (DESY) 12:30Lunch and close 1h00' A. Yamamoto 110112 SCRF WebEx Meeting

Interim Report Chapt. 2 : SCRF Special Discussions for Final Check SCRF Technology (Editors: AY, MR, JK, TS) 2.1 Primary challenges for SCRF Tech. (AY/MR/NW) 2.2 Development of world-wide infrastructure (HH/MC/JK/EE) 2.3 Progress towards high-gradient (RG/CG) 2.4 Cryomodule design and development (NO/TP/PP) 2.5 HLRF development (CN/SF) 2.6 Systems integration tests (HH/MC/JK) A. Yamamoto 110112 SCRF WebEx Meeting