Offtake Workstream : 8th September 2010

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Review Group 0166 Review of Necessary Reform of NTS Offtake Arrangements 20 th September 2007 Beverley Grubb SGN.
NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 April 2010.
NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 July 2010.
Exit Reform Review Transmission Workstream 07 January 2010.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Mod 116B Steve Rose - on behalf of RWE Trading. 2 Background Mod 116 B was raised after discussion with a number of shippers about aspects Mod 116 which.
Review of Offtake Arrangements Document Section I - NTS Operational Flows 9 th July 2010 – Offtake Arrangements Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
Offtake Arrangements Document – An Overview Paul Roberts 12 th May 2005.
OPNs & LDZ Demand Forecasts Chris Shanley & Nick Reeves.
DNPC06 LDZ NEC Charges Denis Aitchison 25 th January 2010.
DNPD04 LDZ Exit Capacity Charges- Discussion Report Denis Aitchison 27 th July 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Enduring Exit Regime & NTS Risk Management Processes Offtake Arrangement Workstream – OAD Section I Review Group 316.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Review of Offtake Arrangements Document Section I - NTS Operational Flows 10 th June 2010 – Offtake Arrangements Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Transitional Exit Capacity Proposals -Update Transmission Workstream, 1 Dec Nov 05.
Workgroup meeting October 2014
Transitional Exit Capacity Proposals -Update
SGN Modification Proposal Amendments to UNC TPD OCS Process Long Term Allocation of Capacity for the Transitional Period.
Exit Capacity Release Methodology Statement
System information provision
MIPI Energy – Daily Reports
Mod 186 Report Assumptions for 2013 DCMF 26 January 2009
Transmission Workstream 4th July 2007
Action 0002: Meter Error Notifications
Capacity Methodology Statements
2 hour / 5% Rule Bethan Winter.
Review of OAD – Proposed Planning
DNPC06 From 1 October 2012 the DNs will pay the NTS Exit Capacity charges to the NTS and recover the cost from shippers DNPC06 put forward for consultation.
0332 – Impact of combining the Entry and Exit Capacity credit processes Chris Shanley.
Exit Capacity Substitution and Revision
MOD Flow Swap Scenario’s – Initial Thoughts
Publication of Zonal Flex Data
COR1360 NTS Exit Reform (Mod 0195AV) UK-Link Committee 11th June 2009
0476 Alignment of DN Charging Methodology with RIIO-GD1 Arrangements
Enduring Offtake Arrangements (Including an alternative daily interruptible capacity release mechanism to facilitate use of spare capacity) Peter Bolitho.
Review of Physical Regime Times for Modification Proposal 461
MOD National Grid NTS Initiated Flow Swaps
DN OAD Processes: RG 0316 : Offtake Workstream
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
Flow Swaps at NTS / LDZ offtakes
Flow Swap Scenarios – Agreed Logic
Long Term Non Firm Capacity Update
MOD Deemed applications – User pays initial thoughts.
Review Group /09/2007.
UNC Transmission Workstream 7th December 2006
Wales & West Utilities Mod 0671 User Commitment
Proposed Transitional Gas Exit Arrangements
Richard Fairholme E.ON UK
UNC Transmission Workstream 15th June 2005
Assured Pressures Proposal
Reinstatement of NTS Interruption
Measurement Error Notification Guidelines for NTS to LDZ and LDZ to LDZ Measurement Installations Review 2014.
Flat, flex, assured pressures Network Development Statement
MP0131: Meter Error Notifications
Information Provision for Transitional Exit Capacity
Workgroup meeting October 2014
Transmission Workstream 1st February 2007
Stefan Leedham Transmission Workstream 2nd November 2006
Offtake Workstream : 19 March 2012
Proposed Changes to UNC Section Q Emergencies - Mod 035
Exit Constraint 23rd January 2013.
Transmission Workstream, 1 Mar 07
MOD Flow Swap Scenario’s – Initial Thoughts
Presentation transcript:

Offtake Workstream : 8th September 2010 Robert Cameron-Higgs Review of NTS Operational Flows (Section I, OAD)

Revise Terms of Reference potential order of events & issues… OPNs – Map out how the OPN and Demand forecasting processes should work, capture what happens in reality and explore what we all will need to do post exit reform using difficult day scenarios. We believe this topic is key and could influence the direction of other topic area discussions, so should be done first. Walk through of what WE (all Transporters) do and actually require (September 2010) Exit Reform - Flow Swaps, Overuns, Capacity User Commitment, etc. (some of these are aspects that are not defined as part of 0195AV or in section I and are under-development)

Terms of reference cont…… Pressures (Agreed and Assured Pressures) – Map out processes, explore linkages between the 2 pressure processes (OAD section I & J), explore possible enhancements to both processes and potential changes to other aspects as a result (low Demand Days). It will take us (NTS) 6 weeks to prepare for the session on OPNs and we suggest the following RG sessions:

Offtake zones (for tolerance measures) (i) Current position: Two separate measurement by specific Offtake and by LDZ Pros Cons (ii) Zonal Offtake Grouping (largely mirroring flex zones) Flex zones – 17 zones spanning DNs. Proposed zonal offtake groupings (zog) = 24 zones..(7 flex zones span Network owners) Zones 1, 4, 6, 7, 9, 14, 16