Friday 18/03 07:15 Test ramp with pilot after the test of dynamic FIDEL correction. Ramp was OK, but fill was stopped due to the trip of several RQTFs.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
LHC Wed 16 Sept 2015 Struggling with cryo o-night Tuesday - Wednesday 07:11 Injecting again 09:00 Dump on injection of train of 144 bunches, losses IP7.
Friday March 4 th LHC morning report the short story: from a global point of view we had basically only one access !!!
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC progress Report LHCC Wednesday 23 rd March 2011.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
Friday 2 nd November 08:45 Stable beams Fill 3253 Initial luminosity ~7.3e33 cm-2s-1 09:45 Increase RF voltage from 10 MV to 12 MV 12:00 ADT to wideband.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
LHC Status Fri Morning 3-June
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Wednesday 8.9 External crossing angles:
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Wednesday 5th September - morning
Saturday 30th June - Sunday: Rocky !
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
LHC Morning Meeting - G. Arduini
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Monday 6th August & night
Summary of Week 11: 14 – 21 March
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
LHC Morning Meeting - G. Arduini
Thursday 10th May - morning
Wednesday 8th August & night
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Tuesday 9th November 10:02 Fill beams dumped
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Wednesday 03/11 – The Plan Finish electron-cloud program:
LHC Morning Meeting - G. Arduini
Summary Thursday h21: Stable beams fill #1303.
Aims for the week Recover from technical stop and precycle at 10A/s
LHC Morning Meeting - G. Arduini
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Thursday Fill 1364 (24 bunch) dumped at 07h
Saturday Nov Stop proton operation. Switch back to ions
Thursday 26th July 13:21 Fill 2880 beam dumped
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Monday :00 – 15:00 : Stable beams 15:30 : Recover…
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
Thursday 22nd March 00:20 – 02:40 on longer squeeze function, orbit and chroma correction at 4 TeV 2:40 – 5:30 second cycle with long squeeze 5:46 – 7:00.
Thursday 30th September De-bunching test
Thursday
Mon 2/4 08:00-13:00: Access for: Experiments Power converters BBQ
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Another Immortal Fill….
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Monday 27th August & night
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Saturday 15th May One bunch 1 e11 per beam 09:57: start ramp
31/3/2010 Difficult day… but at the end stable beams.
Saturday 26 November 2011.
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Presentation transcript:

Friday 18/03 07:15 Test ramp with pilot after the test of dynamic FIDEL correction. Ramp was OK, but fill was stopped due to the trip of several RQTFs when switching on the radial modulation for chroma measurement with tune feedback on 09:00 New version of the timing deployed but several problems: the telegram was somehow stuck with strange value for the beta star publication and the sector 12 set to access mode. Revert to the previous version on system B and 10:45 Performed another test ramp with one nominal bunch. At the beginning of the squeeze, the tune feedback tripped a bunch of RQT Reverted yesterday's BBQ acquisition change from 5 back to 2.5 Hz 14:10 Ramped 32 nominal bunches, squeeze and collisions without trouble Tune feedback on, also at beginning of the squeeze 15:05 Stable Beams! 21:00 Dumped & Refill 23:30 Stable Beams 23:35 Beams lost during optimisation: RF Interlock B1 04:00 Start ramp 32 bunches 04:35 Stable Beams 19/03/2011 LHC 8:30 meeting

Tune spectra before start of ramp H V Reduce transverse damper gain vertical plain for next ramp -> Indeed better 19/03/2011 LHC 9:00 meeting

Finally ! Some problems optimising CMS, Put back same off-set as before: sepH to +- 0.32 Lumi agrees with n  2.5 µrad 19/03/2011 LHC 9:00 meeting

RF news from Philippe Capture loss = 0.13 %; identical for both rings (while B1 capture voltage = 6 MV, B2=4.5 MV); Rather strong dependence of FastBct on bunch length; Longitudinal Blow-up a bit weak, specially for B1 that ended-up at 1.05 ns (compared to the demanded 1.2 ns). I have increased the gain for next ramp; Equalization of bunch length with blow-up worked well on B1 but not as well on B2. We end-up with min=1.0 ns, max=1.25 ns. To be followed¿ At flat top, loss and bunch lengthening are both about two times worse on B2 than B1. Compared to last year standard (~15 ps/h), B1 appears a bit better, while B2 is worse. Probably a good idea to make a test with identical voltages on both rings. 19/03/2011 LHC 9:00 meeting

Life time B2 always a bit lower – less Vrf 19/03/2011 LHC 9:00 meeting

2nd Fill with 32 bunches 23:35 Lost during optimisation due to RF Interlock B1 ” we saw all cavities M1B2 with 0 MV and the RF interlock that triggers is B1” Reset was sent to two RF FGC crates the one of B1 BEAM CONTROL (SR4.BC.B1) and the other to UX45.ACSFCB1.B2. This is not yet understood and S. Page is investigating. 19/03/2011 LHC 9:00 meeting

3rd fill 32 bunches 19/03/2011 LHC 9:00 meeting

Plans Dump this fill at 10:30 3 x in stable beams 12 hours in physics Spectra and tune feedback ok Non conformaties Timing distribution RF FGC reset leading to clean dump Give time to rMPP to decide if ok to 64 bunches If OK continue 64 bunches 19/03/2011 LHC 9:00 meeting